Asbestos/Lead Report pt 3

View the file

Other files for this federal contract opportunity

Other files attached to Replace Steam System Breakers DFAC, Bldg. 13330, newest first.
File Type Posted
Solicitation_Amendment_FA461019RA0290003_SF_30.pdf PDF
19990000_ACM_LBP_B13330_Abate_Plan_(1).pdf PDF
RFIs_2.pdf PDF
XUMU_18-1015B_13330_Steam_Replacement_Breakers_Dining_Facility_RFIs.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part1.pdf PDF
Building_13330_Combined_DWG.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part5.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part4.pdf PDF
20040818_ACM_B13330_SOW.pdf PDF
19990924_ACM_LBP_B13330_Final_Rpt_DO_0084_Part2.pdf PDF
Solicitation_Amendment_FA461019RA0290002_SF_30.pdf PDF
Attach_09__Blodgett_BCX-14G-NAT_Natural_Gas_Double_(Price).pdf PDF
18-1015B_Site_Visit_Minutes.pdf PDF
18-1015B_Site_Visit_Sign_in_Sheet.pdf PDF
Solicitation_-_FA461019RA029.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part4.pdf PDF
Attach_01_18-1015B_SOW.pdf PDF
Attach_03_DOL_Wage_Determination.pdf PDF
Attach_02_Product_Examples_and_Specifications_Part2.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part3.pdf PDF
Attach_05_01_00_00_General_Requirements.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part1.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part5.pdf PDF
Attach_06_VAFB_01_44_00.pdf PDF
Attach_07_VAFB_Electrical_Material_Specifications_Part2.pdf PDF
Attach_02_Product_Examples_and_Specifications_Part1.pdf PDF
Attach_04_RMDF.pdf PDF
Attach_02_Product_Examples_and_Specifications_Part3.pdf PDF
Attach_08_Environmental_Specs_01_57_20_April_2018.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Midwest Environmental Control, Inc.

VISITORS LOG

REPORT NO: I 3 S c.S a

CLIENT: U.S. Army Corps of Engineers DISTRICT: Los Angeles CONTRACT NO: DACA09-95-D-0020

DELIVERY ORDER: INSTALLATION: SITE ADDRESS:

WORKAREA~~ /l.A.J1V, NATURE OF WORK: G t:}'" ~ <./'p t-(,_!_~_a ----

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

Comments:

MEC Form 4 (Rev. 10194)

REPORT NO: /3530

CLIENT: U.S. Army Corps of Engineers DISTRICT: Los Angeles CONTRACT NO: DACA09-95-D-0020

DELIVERY ORDER:

WORK AREA: W ~ S' iJ ILJIQr-f

INSTALLATION: \I A. P: -6 SITE ADDRESS:

NATURE OF WORK: SA .. - 1.J ptA:>B ~'JC1.J <L1...M.

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

REPORT NO: ~~6.3 a

CLIENT: u.s. Army Corps of Engineers DISTRICT: Los Angeles CONTRACT NO: DACA09-95-D-0020

SITE ADDRESS:V~~·6

I

NATURE OF WORK: -----------------------------

INSTALLATION:

WORK AREA:

-----::I----=--------,,--~~=----

DELIVERY ORDER:

~ , r ~ t.(-Z ,.J

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

REPORT NO: I 333 0

CLIENT: U.S. Army Corps of Engineers DISTRICT: Los Angeles CONTRACT NO: DACA09-95-D-0020

DELIVERY ORDER:

WORK AREA:

INSTALLATION: 11/. ;q ~ P "Ib SITE ADDRESS:

NATURE OF WORK: ) A.P ()"'"' rJ (, l W tl (,\.

P/J1.

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

REPORT NO. 1?:Yi;/)~I~

CLIENT: U.S. Army Corps of Engineers DISTRICT: CONTRACT No.: OACA09-96-D-0003

DELIVERY ORDER: _

SITE ADDRESS: _

INSTALLATION: _

DATE: _

• :...:.::)·:·:·:·:;:\::·:i:;:N~M;~:;:\\;:;:;;:;l:m;:l:\:ti:\:;·::;·;i.::::\i·:.::·:\.;:;:;\:::t ;;~~~~\A~:~J1~X:{;:. e.p:~:~·~.9~.~~;9.f:::Yi.~tt·:.·· !!~tg!~.· .tiME(O'UT· : : :~(~N.~!P:R.~.:..: '. :-~<:... -::->:- : -.' .-.... . : :

I amaware of the hazardsassociated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive myright to allege injuryor Illnessagainstthe U.S. Army Corps of Engineers, the Contractor, or Subcontractors uponentering this regulated workarea. Further, I will saveandholdharmlessthose partiesto this Contract for Injuryandor Illnessdirectlyor Indirectly causedby my presence on this projectsite.

MECForm 4 (Rev. 1019~)

REPORT NO.13~6 .e.,€~.s

CLIENT: U.S. Army Corps of Engineers DISTRICT: 5., {30fl(3f1P-A CONTRACT No.: DACA09-96-D-0003

DELIVERY ORDER: _ INSTALLATION: _---I~ _

C GT ~b q g,DATE: ----.;:~- __l_.._ _.:__SITE ADDRESS: _

: :(:::.::}:::::~·::·:::;i::.N~M§:,·::'::;::::::]:;::::::~:·:1:::::.\::j::::.::::;:'\.:;:;;:';:::::· :;;t~~:~:N~X:;('. ~,9:;:R:~9,§.~~,9'~)Vi~~tr',:.:· /riME;jt\r; .tl!Y1§;-;9.~T: .:~.i~:~~±~~§: . ~ -,*•.• :- .•' •••:.:: -:. .:-: ~ •••* -. ' :

T1 l-( ~- ~A\vLr-·--,; l }Ob 5~ oo 5V l \ \v~N - - fr C)~P.

E1\VJIt- lVto - ~ ~ lTV' fII\ Cf

J

I am awareof the hazards associatedwith potentialexposureto asbestosand asbestos-containing materials. Further, I herebywaivemyright to allege injuryor Ulnessagainst the U.S. Army Corpsof Engineers, the Contractor, or Subcontractors upon entenngthis regulated workarea. Further, I will saveand holdharmlessthosepartiesto this Contractfor InJury andor illness directly or Indirectly caused by my presence on this project site.

MEC Form .. (Rev. 10194)

REPORT NO. f3 /L.o~ ~

CLIENT: u.s. Army Corps of Engineers DISTRICT: $ -. {3 (,) fU{3 '1~A CONTRACT No.: OACA09-96-D-0003

DELIVERY ORDER: _ INSTALLATION: '" A~ F. {3

DATE: OGI 6.,Qq l

/333CSITE ADDRESS: _.....:...-. _

·;i:.. ·::;"::·:::·;.;L1:.N~M·~·;·:;·:::::l::::;::;::l:·;;::".:.:::;}::::::;::::;::::;;~:.:: ;;:~t~~~:~f!~x:{·;'· eV:~:B:~Q§.~\:Q:f;:;V.~.~·tt·:.:· \T!.M:g~l~:;: :tiM~;·;~·~t: :: .:.~.i~f!~!Y~~.: ,'. ..

J~ if A· l.VL 1 Yb0 5 00T 5 l l tJ

CJ~

0 \V'J"\ EhVu: 4- AM fMV\o t\e t\ (' \(\-'1 v

, am aware of the hazards associatedwith potential exposure to asbestos and asbestos-containing materials. Further, I hereby waivemyright to al1ege injuryor ltIness againstthe U.S. Army Corps of Engineers, the Contractor, or Subcontractors uponentering this regulated workarea. Further,' wilt saveandholdharmlessthose parties to this Contract for Injuryand or Illnessdirectly or Indirectly causedby my presence on this projectsite.

CLIENT: U.S. Army Corps of Engineers CONTRACT No.: OACA09-96-0-0003

J .. Midwest Environmental Control, Inc.

VISITORS LOG

REPORTNO.~~~~~

DISTRICT: 73- 8A~8t1~

DELIVERY ORDER: _ INSTALLATION: __~ _

o cr 0 T <t9 )DATE: ------4-..-;;.--'---SiTE ADDRESS: 0 I 36a cJ

.''';:.::.;·:::i::,:;:;:;::~:::/·::;::~~!:~:l;:::::\::i:i:;:;:;'\:\::;;\:::;;::::i::;::::!::~;.:;;\:;\:::;;', ·;:;::~9~N.£!:···'· ~V~a~9$,~:·Q.f:Vi~tr· .!lM.~!~: TIME(OOT' : .:- ..•. :~:I~.N.~];~:~~, ..<.. :<.~ ~. -.a4:.:~-:. : '.' .: : .- ', : ;

:I1 H A- l"'~ 1 >0 0 SlO 0 <

Sv tl, N J.-J vA - C)~... 6'\\1 lfl- - AM. PrJ'-

I ~(1 t'\.. CTb ttV\.Cf J

.0

, amaware of the hazardsassociated with potential exposure to asbestos and asbestos-containing materials. Further, I herebywaive myright to allege injuryor Utness againstthe U.S. Army Corpsof Engineers, the Contractor, or Subcontractors uponentertng this regulated workarea. Further, I wilt saveandholdharmlessthosepartiesto this Contractfor Injuryand or Illnessdirectlyor Indirectly causedby my presence on this project site.

MECFonn 4 (Rev. 10194)

REPORT NO. j '2Q?Jo

CLIENT: U.S.ArmyCorpsof Engineers DISTRICT: CONTRACT"No.: DACA09-96-D-0003

DELIVERY ORDER: _

SITE ADDRESS: _

INSTALLATION: _

DATE: _

·:..:.:.;·;·:·:··:tN~M.~..:::::·:::::l\~·\·::::[\:·\;\;;;\:.;,::::::;::.: ..\.. :\:;:\\:.:: ::~~~1\~g~N9X:;·L:" e""ij::ll·~"9"~"~;:P.·~::;V:i~tt:";.::" :\TIMe>IN:'; ·fl~~:;;p.9t· : .•.:~:i~:N!TYR~,:.:: ..:~~.: ~;.:::::o ~ .;:-:.:-:. : : ; : : : : :

.:Ti l-\- 1A \~ l , (J 0 S- . -, 0, .," --

J. s u l l \ J ~1"-tf\V lTh />etA. ~~ C)~lYl- IMp~ t 'v", I amaware of the hazardsassociated with potential exposure to asbestos andasbestos-containing materials. Further. I herebywaive myright to allege injury or illness against the U.S.ArmyCorpsof Engineers, theContractor, or Subcontractors upon entering this regulated workarea. Further, I will save andholdharmless those parties to this Contract for Injury andor Illness directly or Indirectly caused bymypresence onthisproject site.

MECForm 4 (Rev. 10(94)

REPORTNO: 13~~ -.,)1

CLIENT: U.S. Army Corps of Engineers

DELIVERY ORDER:

DISTRICT: Los Angeles

INSTALLATION:

CONTRACT NO: DACA09-95-D-0020

SITE ADDRESS:

WORK AREA: ---------- NATURE OF WORK: ---------------------------

~\VL

~~(\6 r lJ\.<j

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

REPORT NO: 0?-.J?J)

CLIENT: U.S. Army Corps of Engineers

DELIVERY ORDER:

DISTRICT: Los Angeles

,INSTALLATION:

CONTRACT NO: DACA09-95-D-0020

SITE ADDRESS:

WORK AREA: ---------- NATURE OF WORK: ---------------------------

4~OO j"s 30 'f\N\ f~

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

REPORT NO. t?ii?:V rJ-.,7

CLIENT: U.S. Army Corps of Engineers DISTRICT: CONTRACT No.: DACA09-96..D-0003

DELIVERYORDER: _

SITE ADDRESS: _

INSTALLATION: _

DATE: _

T1>t+ rA\~ "\\00 S~dO

Ev\Vtt'Z.. w\O~ (~ ~" "t\" ~f\1' f .,A1-

I amawareof the hazards associatedwith potentialexposure to asbestosand asbestos-containing materials. Further, I herebywaivemyright to allege injuryor llInessagainst the U.S. Army Corps of Engineers, the Contractor, or Subcontractors uponentering this regulated work area. Further,I will saveandhold harmless those parties to this Contract for Injury and or Illnessdirectlyor Indirectly causedby mypresence on this projectsite.

REPORT NO: & ;et?5 - I ? 0 II

CONTRACT NO: DACA09-95-D-0020

SITE ADDRESS: r333 0 - 1'19'tj

,A-", (HoM -f I (., \.) f-{ (\S'Jr<., tt4 G \l{;

NATURE OF WORK: eY./J 7 - 11 P

DISTRICT: Los Angeles

INSTALLATION:

C> (1)' ·

WORK AREA: I-AJ- - - - - - -

DELIVERY ORDER:

CLIENT: U.S. Army Corps of Engineers

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further.I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

MEC Form 4 (Rev. 10/94) o ~7 I 9 'f 9

DATE: +- _

CONTRACT No.: DACA09-96-D-0003

Midwest Environmental Control, Inc.

VISITORS LOG

REPORT NO. /J~?;fa.1lA

OlSTRICT: :g ~ is ·

INSTALLATION: ttl t1 f! IJOELIVERY ORDER: _

SITE ADDRESS: 1.33 <3 ()

CLIENT: u.s. Army Corpsof Engineers

.(·.·.:····;·t;::..N~M·~,:\\::·: ..,:';:':':::l:::\l;~:.;.::;':::.;':::;'.'\.::::::\;;:: '~:;\;A~:I:~£X:/.:~: ep:·RPQ~~.R~,.v.i~IJ.·. ::TIMlt'IN:': ,fl:M~:J;),qt: : :~'.~~~T~:R~::'-:~: .::; :-.::: .: '.::::.-: : :

I amaware of thehazards associated withpotential exposure to asbestos andasbestos..contalnlng materials. Further,' here~y waive myrightto allege injuryor illnessagainst the U.S. ArmyCorpsof Engineers, theContractor, or Subcontractors upon entering this regulated wdrk area. Further, I will save andholdharmleSs thoseparties to this Contract for Injuryandor lIIness directly or Indirectly caused bymypresence on this project site.

MECForm 4 (Rev. 10194)

REPORT NO. ~-(L,2,/~-5

CLIENT: u.s. ArmyCorpsof Engineers DISTRICT: rs· ,(3 CONTRACT'No.: DACA09-96-D-QOO3

DELIVERY ORDER: _

SITE ADDRESS: ----:._.-=;...a-::;. _ DATE:

I amaware of the hazardsassociated with potential exposure to asbestos andasbestos-containing materials. Further, I hereby waive myright to anege injuryor illness against the U.S~ Army Corps of Engineers, theContractor, or Subcontractors upon entering this regulated workarea. Further,lwUl save andholdharmless thosepartiesto this Contractfor injuryandor illnessdirectly or Indirectly caused by mypresence onthis project site.

MECForm4 (Rev. 10194)

CONTRACT'No.: OACA09-96-0-QOO3

VISITOR LOG

REPORT NO. LZ/ap~

~ t3 ~CLIENT: U.S. ArmyCorps of Engineers

DELIVERY ORDER:__ INSTALLATION: t/ /t/J .P.. lJ "

SITE ADDRESS: . /3330 DATE:

••.... :";:.:.::::i<;(:'jj;~;~;:NftM~!0:;::~\~~j\\t~~![*;ilir~;\: \1;~\~;:;;;;:;\:ri:\:. i;:Agg~9X< ~.V:;:§~Qj,~:·9.~:5!.i~If:: \ltM:~l~·: :ll.M~::;g~t::

·.,~~g~~IM,~¢.. :.•:'.~~. :

,or,>" r/

,.F

1amaware of thehazards assoc1ated withpotential exposure to asbestos andasbestos-containing materials. Further, I here~y waive my rightto allege

Injury or"'ness against theU.S. Army Corps of Engineers, theCo.ntractor. orSubcontractors upon entering thisregUlated~k ares. Further,' wUl save and hold harmless those parties to thisContract forInjury and orIllness directly orIndirectly caused bymy presence onthisproject site.

MECForm 4 (RW. 10114)

CLIENT: u.s. Army Corpsof Engineers DISTRICT: C5 ~ B - CONTRACT·No.: DACA09-96-0-QOO3

DELIVERY ORDER: _ INSTALLATiON: 1//iK8

18:33 0SITE ADDRESS: _

:.;::·::::.·:·'.:·:·::;..N~M§::::[::·, ..::;'l;::::::l::;::':i:·:.;·'\:::::::.::[;:;:'::;·::::;::[ :;;\t\~q:gN9Y.:;;;·;~ ~.9::B~R§~:.9~;.Yi.~If·.. .J1M.~~~· .TIME(Otif· : ...:#:i~N.~'1tP~~.: ...-: .. :-:.::- :-~-: ;.:.:- :,:," .: >/ :- : :

l#~/""/

I amaware of the hazardsassociated with potential exposure to asbestos andasbestos.contalning materials. FurtherI I here~y waive my rightto allege injury or illness againstthe U.S. Army Corpsof Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further,' will saveandholdharmleSs thosepartiesto this Contractfor Injuryand or Illnessdirectly or Indirectly caused bymypresence on this project site.

MEC Fonn 4 (Rev. 1(194)

REPORT NO: ~;e6~7

CLIENT: U.S. Army Corps of Engineers DISTRICT: Los Angeles CONTRACT NO: DACA09-95-D-0020

DELIVERY ORDER: INSTALLATION: SITE ADDRESS:

WORK AREA: ---------- NATURE OF WORK: a//J b l---------------------------

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

REPORTNO:~~~

CONTRACT NO: DACA09-95-D-0020CLIENT: U.S. Army Corps of Engineers

DELIVERY ORDER:

DISTRICT: Los Angeles

INSTALLATION: SITE ADDRESS: /333 C)

WORK AREA: _ NATURE OF WORK: - ...l..- _

I i

I I I

I am aware of the hazards associated with potential exposure to asbestos and asbestos-containing materials. Further, I hereby waive my right to allege injury or illness against the U.S. Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated work area. Further, I will save and hold harmless those parties to this Contract for injury and or illness directly or indirectly caused by my presence on this project site.

... ~2/2.5/J~~...'m~T .1~: ~3 FAX 805 2589024

VISITORS LOG

REPORTNO: f34b~.

IfU vv, CLIENT: u.s_ Army Cof'P'lorEngineer.

ceLNliRY ORDER:

W~RKAREA: ;fJ BL06.

OI$~lCT: Los AnglIM 63<!> 6 . CONTRACTNO:~-0-0020

INSTALLATION: If' /-].I? 8 Sl~ ArlMe$$: / D3 3 0 r.»~cL- c 'iA o uti 0 vi !../"Q'I jJf}c e. cs» t!-Jl.u( ~ NATURe OF WORK:_(.....(...1_'_/___ ~

---------------+-----"1t----...

... -----1-----+-----1--.. .._---

_--..+ .M •

I .11\ aware of the hazard&••socialeclwith potentia'....ure to ubMtoa and as~-cont.ining maleriale. Putth.... I h....1ty¥Mev. trrf riGht to .u.a.

. I inju'Yor illness agatMI theU.S. Anrtt Carps 0( enaineefl. the Contractor. or!lubcon'~0r6 uponenteringlbia reaulal.tJ work.I'M. Fur1her. I will savi lind hold hlrm'" lhose pattie5 to this Contract ror inJufV aftd or iltneM diredJy or indirH1lyCQUMd by my pnJIence on &his proJ6ct,ite.

Comment.;

I4J 00 t

VISITORS LOG

REPORT NO: /j,t!,~a ~.

eONTIUCT NO: tw;AQ8.M-O-OO20OI$TAter: Los Angeles

INSTALlATION: V. 1'9. r: (j SITf! ArJC)RE$$: t333 .() NATUREOl"WORK: Lf.<"to,.~_~__c/_·_L _6(",06.WORKAREA:. ---__

DeLIWRY ORDER: _

CLIINT: U.S.ArmyCorps of Engin...

..·------r----+----I'--· ------

·-1---....-+-----0+---

-------------+------t---... ft_ /.:

-------------~r-------t-.... --------+-----:ir-----... ···-1..--------t.'" aware ofthe hazardlaaaocialM with pot....ti.....ure to ube&toa Indas~ntaining mal.ri8Ie. Pu"het.' h....~waive..,. riaht to .'leae inju~or 111n..eg theU.S.Mrtt Corps0( engiMeI'$, theContr8ctor. orSubcan,ract~ upon .,a.ring lbia reaulal.d work.,.... Fut1her. I will saw ,nd holdharm 'hoMIJ1IIt* to this Conbet far injUryMd or itt.... directly at ;ndir*C1ly cawed by my pnMenC8 on ... pfGJect $It., Comment&:

~uu;

VISITORS LOG

REPORTNO: /~~ Il- ~.

CLIENT: u.s.ArmyCorpl or Engln..... CONTIUCT NO:~M-O-OO20

v. ~. r:~ SIT~ AtlMES$: / g S 6 CJ Gf-/.ttO _,.~_~__v_L _NATURe 0111 WORK:

lNSTALLATION:

(5006.WORK AREA:. _

DeLIWRY ORDER: _

: ,,:;: :',.:.:... :.;i/~%~t~ff~~~~Y;;jit~'~;::~:\~~;i~M:1[1~! l;~~l;~~~~#~j~~ ~~fM"~;;A~~~~;m ;~1}~Mi~:!~ ;i~!~j~~~ h~~:~W~~MlfM~~:~m~;::,:

... ···-1··--------

~/,.~.f

I.'" aware of .... hllZllrdlaaaocielecl with pOtenliai upasur. to ube&toa and .sbntos-containing mel.riall. f'ulthet. I h...."v¥Mlve mv riaht to ••tea.

inju'r or illneM agaln&l til. U.S. M"I Carps 0( engiMef$. the Contnlctor. arSubcam~ uponentering lhie ,...,laled workatH. Furth.....I will save and hold h.m..... tholepaItMII to this Canlrect (ar injufY Md ot itt..directJyor indirectlyOQUMdbymy pnM8ftCe on IhIapre)acl,it••

REPORT NO: /~~a ~.

CO~CT NO: DAcA09-95.g..ogZ0

/333(/INSTALLATION: V. 1'9. r: (} NATURe O~WORK: Lf:<(to(5006.WORK MEA:._~ _

CLIENT: u.s_ ArmyCorps orEngin..,.

DeLNERY ORDER: _

... ------i----1------I--..

--------------I-----------t---

.... _-_--f- "'O'-_

----f.-------...

..---t-----t---..... -----

,.'" aware of.... hazardl••IOCiea.t wi'" potenUat ..,.ure to ube&toe anda.~ntainlng materialt. 'utt"et.' h...'Ywaive mv riGht to .'IeO.

injUly or itln.. agaltt51 thl U.S. Arnrf Corps 0( enai,*". the Contnlctor, orSubcon"ac1ora upon _lering this r-oulat.d wottl .rH. Further. Iwill san Ind hold h.rm.... thoM".tt* to this Contract (or injury andof iUnea directly or indirK1ly oaUMd bymy pretence on this project sit••

·..' . ~21 ~.b/).~ ... '~~~l .1~: ~J fAX 805 ~5~YU~4

VISITORS LOG

REPORT NO: I~~~ IZ- S.

CLIENT: U.S. Army CoC'P'l of EnginMl'.

DeLIVERY ORDER:

WORK AREA:. 6006.

OI$TAICT: Los Angeles tNSTALLATtON:

NATURe OF WORK: t-f~ (to _. .f!::!:._~__V_L _

... -.----J----+-----I--. .._._---

----- +-- --1.•.... -------+----+----:!!"'.,.'. ···-,-1---------

----4--------

..----1-----0+----.... -----

, _'"aware ofthe hazardli••s0ci8l8dwith ",enti" eJePOSure to ube&toa Ind as~nt.ining mal.riala. f'ulthet. Ih...bywei". ffrI riGht to alleGe injury or illneM agatn&l theU.S. hmt Corps 0( enaineers. the Contractor. orSubcon,~Of$ uponent.ing lbia r80\tlaaed work...... Furiher,t will save end hold h.rm.... tholepattie& to this Conlraet ror inJutY and ot ittnea diredJy or indirec1lycaUMd bymy prelence on IhIsproject site.

REPORT NO. 13.3?JO

CLIENT: u.s. ArmyCorpsof Engineers DISTRICT: _ CONTRACT No.: DACA09-96..D-0003

DELIVERY ORDER: _

SITE ADDRESS: _

INSTALLATION: _

DATE: _

":"":;:::"":,:[:\"NiM:~:;:\;::;:"::\:;'\:;:~:\:\:::;:;;:;::::;::;::;:;;\"\"\:";::;::\l\\:\::\ ::,::A<iiti$Y:"': eV""R~9§~"9"~::Vi*rr:" •.\fIME)IN:': :tIME,"::(:jtJT :: "·":~iEN"'!HRg•."-"....::~ <::.:::::f:'::: :: ':'-: :::: : ::- : :

I

I amaware of the hazardsassociated with potential exposure to asbestos andasbestos-containing materials. Further, I here?y waive my rightto allege injuryor illnessagainstthe U.S. ArmyCorpsof Engineers, the Contractor, or Subcontractors upon entering this regulated work. area. Further, I will saveandholdharmless thosepartiesto this Contractfor injuryandor Illnessdirectly or Indirectly caused bymy presence on this project site.

MECFonn • (Rev. 10194)

CONTRACT No.: DACA09-96·D-QOO3

~~~!J~.~L~O~~ DISTRICT: ~ \.;CS~CLIENT: U.S. Army Corps of Engineers

DELIVERY ORDER:__ INSTALLATION: _

SITEADDRESS:_~ _ DATE:

::.• ;;:·;:;:::};:::::;;;::::;;;;:;:::\;\:;;.Ni~~:::;:·::;\;:~~;~t~~:;~;\:;:\;:;~:\;::j;;:;;::;;:;~:\:~::;\1:: ~;:;i8.g~N:g*:t/ el!=i~RQ§~;~?"~:::Vi:~[.::· =;nMEjtf; nME:::btit ..:~tgH,.~!H:~~ ....:::~.~:~ .:;;~:.>::.:. :.:-- .~: :.:.:.:-: ",:. : '..' :.:.~ :'.".:.: :-:.;..:-:.>"..' ~.:,,':. :,~::..-.:: ...

v

I

I amaware of the hazardsassociated withpotential exposure to asbestos andasbestos-contalning materials. Further.·' here~ waive myrightto allege injuryor lUness against the U.S.Army Corps of Engineers, theContractor, or Subcontractors upon entering this regulated~ area. Further, I will saveandholdharmleSs thoseParties to this Contractforinjuryandor Dlness d1rectly or Indirectly caused bymy presence onthis projectsite.

DELIVERY ORDER:__

CLIENT: u.s. Army Corps of Engineers CONTRACT No.: OACA09-96-0-Q003

. .. .. .. Midwest Environmental Control, inc.

~~~~J~.R~~O~f-3

DISTRICT: S, {S

INSTALLATION: 'V "'~. P-; (3

SITEADDRESS: _

: ··:.. ::/i:;:1:::;:~::::;:~if:i;~~tt~U:~:;;0J{f.it~it~~~;r;~:;;iiif1:, :;t~q,gti.$¥i) ij,.H:;I{~~~.~~:q~f,::Yi.*[.;:· ·~TtMgl~:;; :fI~~;:!?~ :~:::.:.;,~~~,t{,m:B~i .•• ...:

,////0/'" e ' f

.",~,.i>,,_r."

.........".v...

,;_;/F

,,.///0///

/7

J'" t

I am aware ofthehazards.~ted with potential exposure toasbestos and 8SbestOs-containing materials. Further, I hereby waive my right toallege

Injury orIOness against theU.S.Amrt Corps of Engineers, theContractor, orSubcontractors upon entering this regulated~ ....... Further,' win save and hold harmleSs thoseParties tothis Contract for Injury and orRlness d1rectly orindirectly caused bymy presence on this project site.

5 ;

comments:

M.1dwest ~nvJ.ronmental ~OnrrOl, IDC.

REPORT NO. t3730

CLIENT: U.S. Army Corps of Engineers DISTRICT: 5 I /Jf CONTRACT No.: DACA09-96-D-0003

DELIVERY ORDER:__

SITE ADDRESS: . /33 3 0

INSTALLATION: _

OATE: _

..:.•• :?I:::.::::.::·~:t:;::::!;:::t:N:j!~:~:::::::::~~1~;~i~J~;::;;;::;ji:~~;;:::~;:~::;f:1:: ';¥Ifi~$x:;::' ~.4.::B.itp~.~:·9.~:::V!:r.t· ':JlM:~!~: DMg:!:Jqr :-:::" :: \~l,§:~~!!l~~....::.: :

<,r-.

~/J~

I amaware of the hazards associatedwith potential exposureto asbestos andasbestos-contalning materials. Further, I here~waivemyrightto aUege injury or illness against the U.S. Army Corpsof Engineers, the Contractor, or Subcontractors upon enteringthis regulated~ area. FUtther, I wtn saveandholdharmleSs those Parties to this Contract for Injury andor Iiless directly or indirectly.caused by my presence on this project de.

CONTRACT No.: DACA09-9fJ..O-Q003

INSTALLATION: ~U&k D E C~ .J1rJ.;-lJv DATE: //-30-9Cj lVllOWeSI: ~nvtrOnmentaJLOnrrOl, me, VISITORS LOG

REPORT NO. 18330

OIS~RICT: S I 13(

/3330SITE ADDRESS: _""--__~ _

DELIVERY ORDER:__

CLIENT: U.S. ArmyCorps of Engineers

1\

I am aware of the hazards associated withpotential exposure to asbestos andasbestos-conlainlng materials. Further. I here~ waive myright to allege injury ormness againstthe U.S. ArmyCorpsof Engineers, the Contractor, or Subcontractors upon entering this regulated~ area. Further,l Will save and holdharmleSs thoseParties to this ContractforInjuryandor Illness directly orindirectly caused by mypresence onthis project site.

~~~!J~.~~G CLIENT: U.S. Army Corps of Engineers DISTRICT: CONTRACT No.: OACA09-96-D-0003

DELIVERY ORDER: __

SITE AOORESS: _ DATE: _

::.:·::j::t·::!t:::;:;::::;::;;:';l:l;t&aM§::;;;::,.:::;:ili:;~~\f~;;;1;::~;;:1::;;j~;;:;;:;:;;:;;;1~;:: ·i.~:lqg~E~;{· e.~::BRQ~~:·9·~::~rr.;· :IlM:g!~: i1ME~~:tjUt· ::::·.::.::§i,g"f~!H,r!5 ....:'"::: ....:.. :.....:..::-:::.... .:..."::::-: ..

v/....--~···_/

-:V

4'/

I amaware of the hazardsassociatedwith potential exposure to asbestos andasbestos-contalning materials. Furtherf I her~waivemyright to al1ege injury or lUness against the U.S.ArmyCorpsof Engineers, the Contractor, or"Subcontractors upon entering this regulated wort<. area. Further, I will saveandholdharmleSs those Parties to this Contractfor Injury andor IDness dlrectly or indirectly caused by my presence on this project site.

REPORT NO. J33 '?O

CLIENT: us, Army Corps of Engineers OlSTRICT: S' r2 ~ <:!. • CONTRACTNo.: OACA09-96-0.Q003

DELIVERYORDER:__

SITE ADDRESS: ·l3?'3 0

INSTALLATION: _

DATE: 12-0;;' '0~

·.:·· .. ;:::·;::;;::;:;::t;;;:::::::::::::::::\;:~!I~:::~·::·l::;:::::*:m::i:~:::::$l~::l·;\~::;::~;::~~::::: ::::~Agg~$X:t·: ~.!i.:l~RQ§~,Q~:511.*[;: ':Jli.:~!~' :tIM.~:':§~ :::: ..::~l~~~!H:~~ ..:·.::.:.

.0

.."r-. ~ ~

<:~Vq

'\r.

1\

I

, am aware of the hazardsassociated with potential exposure to asbestos andasbestos-contalning materials. Further. I hereby waive my right to allege

Injuryor mness againstthe U.S.Army Corpsof Engineers, the Contractor, or Subcontractors upon entering this regulated~ area. Further,' win saveandholdharmleSs thoseParties to this Contract for Injuryandor mness directly orIndirectly caused bymypresence onthis project site.

REPORT NO. 15ca~

CLIENT: u.s. Army Corps of Engineers DISTRICT: ~ • .e. CONTRACT No.: OACA09-96-0..Q003

DELIVERY ORDER:__

SITE ADDRESS: -.J"3 "030 / I3reA-~

INSTAlLATION: _

OATE: ~__

'::: :..... ;;:;~::~·::::::;;;;;:::.;~:::I\~:;;.NI!§;;:\;::;:;;:~~;:I::~;r~;:~::;~:jl\::;;;:~;;:;;~:~;lt:~:: :~;:i~gti$*:·;; eHli~R§~:·9.f::::~[;:· :I!M:~!~:: j:tM.~:!i~! ::::· ....::~l~~~w:~~ ..:;. : ...:

i\

I am aware of the hazardsassociated withpotentialexposure to asbestos andasbestos.contalnlng materials. Further, I here~waive myrightto allege injury orlInessagainst the U.S. Army Corps ofEngineers, theContractor, orSubcontractors upon entering this regulated~ area. Further, Iwm save andholdharmleSs those Parties to this Contract forInjury andor Illness directly or indirectly caused bymy presence onthis project site.

REPORT NO. 1031>0

CLIENT: u.s. ArmyCorps of Engineers DISTRICT: s· B · CONTRACT No.: OACA09-96-D..Q003

U.R.F- 13.INSTALLATION: _DELIVERYORDER:__

SITE ADDRESS:~ "3 "330 OATE: _

.;;;:·:::::.:::::,:}:;:::;:·:;i;l;l\;~N_~::;::::~:;:~~;::I~1~;;~::¥:::;J~;;1:;::~::::;:;::;:)~;j:: ·:tlg~:NE¥;·:;·.e~f6RQ~g;9.f:.~IT:. :I!M:g!~: :t:IM~:';g'~ . . : ..~:1:~:~~!!1~~ r-. ,/)-.

k~

I

I am aware of the hazardsassociated withpotential exposure to asbestos andasbestos-contalning materials. Further. I here~waivemy right to allege injuryor mness againstthe U.S. Army Corpsof Engineers, the Contractor, or Subcontractors upon enteringthis regulated wofk. area. Further,' win saveandholdharmleSs those Parties to this Contractfor Injuryand or Illnessdirectly or indirectly caused bymypresence on this project site..

REPORT NO. /0 ~00

CLIENT: u.s. Army Corps of Engineers DISTRICT: 5 # 16 · CONTRACT No.: DACA09-96.D-0003

DELIVERY ORDER:__

SITE ADDRESS:---1---.;;..-----

INSTALLATION: u· tJ ·r B ·

DATE: L7 -08 w 0, ~

I am aware of the hazardsassociated wfth potential exposure toasbestos and asbestos-containing materials. Further. I here~ waive myrightto allege injuryorUlness.against the U.S.Army Corps of Engineers, theContractor, or Subcontractors upon entering thisregulated wOrk. area. Fut1her.' will save.and holdharmleSs those Parties to this Contract forInjury andor Dlness directly orIndirectly caused by mypresence onthis project site.

REPORT NO. -13'5?> 0

CLIENT: U.S. ArmyCorps of Engineers DISTRICT: S. ~ · CONTRACT No.: DACA09-96-0-Q003

DELIVERY ORDER:__

SITE ADDRESS: ~\.....l:?2~~_'3...;.;....;,;;O;;...-.. _

INSTALLATION: U. A·F_-_8 _

DATE: IZ· 0 q - q If

::..• ;;;:·~:;:::::::t;:);;;):::;:::;;~::i:);.miM~;::\:;:::);::::;I~l;:~\:::;::::::;\\:;;.:::.::.::::~t;~~: ':::~I~iN$¥:::': e~(6p.9§~:9·~::YI~[.·" :\nME]N:'; 1J.M~:::p·ti:t· :::: .::.::~l~ff~!H:B~ ..•·:~~.:~:.:::.:.: .::.:-:.~. :.:.:.:- : :

r-. I-.~nl4

I am aware of the hazardsassociated with potential exposure to asbestos andasbestos-contalnlng materials. Further. I her~waive my right to allege injuryor illnessagainst the U.S.Army Corps of Engineers, the Contractor, or Subcontractors upon entering this regulated wOrk. area. Further. I will saveand holdharmleSs those parties to this Contractfor Injury andor I11ness directly or Indirectly caused bymypresence onthis project site.

Comments:"

ASBESTOS & LEAD ABATEMENT FINAL REPORT

CONTRACT # DACA09-95-D-0020

DELIVERY ORDER No. 0084 INCLUDING MODIFICATIONS

BUILDING No. 13330

VANDENBERG AIR FORCE BASE

CALIFORNIA

AIR AND BULK SAMPLE RESULTS

SECTION D

J&H ENVIRONMENTAL, INC.

5405 Alton Parkway, Suite 5A-623, Irvine, CA 92604

Telephone (800) 303-0661 Fax (949) 654-1049

Time] :6-()

Phone------------

Project Manager T~.5vII -\V()\"V'

Location V · A. £:' G to--.0 (;;. '#.. \ '")~ ?2 () Project Administrator f-.l¥eerto .fLoW Contractor Name----lM~---'I.~"""'--'--l,r~~_-" _ Contractor Address v

Work Area Observations

1. Work area adequately isolated?

2. All openings to work area sealed?

3. Air movement system sealed off?

4. Appropriate negative pressure maintained in work area? How?

5. Appropriate warning signs at all entrance/ exits? (AHERA & NESHAPS)

6. Entrance to work area securable?

7. EPA and OSHA regulations p-osted on site?

8. Number of workers in area --7+--- Personal Protective Equipment

1. NIOSH approved respirators?

Type? l [1.- £:q ve

2. Disposable coveralls?

3. Head covering?

4. Foot/shoe covering?

Decontamination Unit

1. Hangers/lockers/bins for street clothes?

2. Lock box for valuables?

3. Shower available on site?

4. Airlock to shower?

5. Sanitary conditions maintained?

6. Airlock to inside change room?

7. Disposal bin for protective equipment?

8. Airlock to work area?

Page 1 of3

Phone

Yes No v-.

-2:

J

Comments

Yes No Work Practices

1. Are wet methods employed? ~.

2. EPA-recommended wetting agent used? ~3. Are HEPA vacuum cleaners used? ~,

4. Are light fixtures and other equipment cleaned before removal from work area? A

5. Are furniture and other sanitary items in work area covered and sealed? ~

6. Are walls and floors covered and sealed?

7. Are polyethylene film barriers disposed of properly? ~

8. Is waste bagged while wet? $9. Are 6-mil bags used?

10. Are bags properly labeled? $11. Are bags placed in drums and sealed?

12. Are workers wearing protective clothing at all times while in work area? .z,

13. Are workers disposing of contaminated clothing? ~

14. Are respirators worn at all times? ~

15. Not eating, drinking, smoking or gum/tobacco chewing in work area? ~

16. Are workers using the shower? ~, Disposal of Materials

:£1. Labels on the bags/drums?

2. Are drums with reptured bags disposed of

Properly?

~3. Manifests completed and maintained?

4. Number of bags

Air Samples

1. Are necessary area and personal samples

Being obtained?

2. Are personal results posted for employees

Within two days?

3. Are samples properly obtained?

Page 2 of3

J&H Enviornmental, Inc.

Inspector's Comments

\"Jr------~~-------------

IJOOA,) ~ f~vPil Q ~ 8.c. M~ b£-t) ms·

S/ODfNt - ~YiD_---------------

Inspector's Signature~ ~~

Page 3 of3 J&H Environmental, Inc.

J&H Environmental, Inc. Laboratories Air Samples' Results

Al~ALY'l'lCALUA'!'A

CLIENT NAME :

JOBNAME:

JOB ADDRESS:

Midwest Environmental Control, Inc.

Vandenberg AFB Vandenberg AFB - Bldg. # 13330 Vandenberg, CA

JOB NU1vfBER: MEC99067 DATE: 7/13/99

PAGE: lof2

LABORATORY "PAT" ID #: 11067

ANALYTICAL METHOD NIOSH 7400 "A"

Sample Pump Flow Cassette Sample Running Time Duration Volume Pump Calibration Field / Fiber F/Sq.mm Det. Lim Results I.D. No. (llmin.) Type Date Start Stop (Min.) (Liters) Before After Fiber/cc Fiber/cc

1 N/A 10.0 25 7/13/99 7:05 9:30 145 1450 10.0 10.0 100 8.0 10.19 - 0.003 2 N/A 10.0 25 7/13/99 7:05 9:30 145 1450 10.0 10.0 100 10.0 12.74 - 0.003 3 N/A 10.0 25 7/13/99 7:07 9:32 145 1450 10.0 10.0 100 7.0 8.92 - 0.002 4 N/A 10.0 25 7/13/99 12:01 14:30 149 1490 10.0 10.0 100 15.0 19.11 - 0.005 5 N/A 0.0 25 7/13/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

DESCRIPTIVE INFORMATION

Sample Sample Resp.

LD. Type Sample Location Type Remarks U.C.L.

1 AR Inside work area Background & prep 0.004 2 AR Inside work area Background & prep 0.006 3 ENV Outside work area Background & prep 0.004 4 AR Inside work area Removal 0.008 5 Blank N/A Blank sample

COMMENTS:

KEY TO ABBREVIATIONS

SAMPLE TYPE: PRS: Personal, PRM: Penmeter, ENV: Environmental, BGD: Background, FC:Final Clearance, HEX: HEPA Exhaust, AR: Area.

RESPIRATOR TYPE: HM: Half Face Negative Pressure, FF: Full Face Negative Pressure, PAPR: Power Air Purified Respirator, SAC: Supplied Air Continuos, SAPD: Supplied Air Pressure Demand, SCBA: Self Contained Breathing Apparatus.

Analyzed by: Jason Sullivan

J&HEnvironmental, Inc. Laboratories Air Samples' 'Results

Al~ALY'l'ICAL VA'I'A

CLIENT NAME :

JOBNAME:

JOB ADDRESS :

MidwestEnvironmental Control, Inc.

Vandenberg AFB Vandenberg AFB - Bldg. # 13330 Vandenberg, CA

JOB NUMBER: MEC99067 DATE: 7/13/99

PAGE: 2of2

LABORATORY "PAT" ID #: 11067

ANALYTICAL METHOD NIOSH 7400 "A"

Sample Pump Flow Cassette Sample Running Time Duration Volume Pump Calibration Field 1 Fiber F/Sq.mm Del. Lim Results

1.0. No. (l/min.) Type Date Start Stop (Min.) (Liters) Before After Fiberlcc Fiber/~

6 N/A 10.0 25 7/13/99 12:01 14:30 149 1490 10.0 10.0 100 13.0 16.56 - 0.004 7 N/A 10.0 25 7/13/99 12:05 14:30 145 1450 10.0 10.0 100 7.0 8.92 6.002

8 N/A 10.0 25 7/13/99 14:45 16:45 120 1200 10.0 10.0 100 2.0 2.55 0.0022 'B~D.L.

9 N/A 10.0 25 7/13/99 14:45 16:45 120 1200 10.0 10.0 100 1.0 1.27 0.0022 B.D.L.

10 N/A 10.0 25 7/13/99 14:45 16:45 120 1200 10.0 10.0 100 3.0 3.82 0.0022 B.D.L.

11 N/A 0.0 25 7/13/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

DESCRIPTIVE INFORMATION

Sample Sample Resp.

1.0. Type Sample Location Type Remarks . D.e.L.

1.D.. AR Inside work area Removal

6 AR Inside work area Removal 0.007

7 ENV Outside work area Removal 0.004

8 FC Inside work area Final clearance

9 Fe Inside work area Final clearance

10 Fe Outside work area Final clearance

11 Blank N/A Blank sample

COMMENTS:

KEY TO ABBREVIATIONS

SAMPLE TYPE: PRS: Personal, PRM: Penmeter, ENV: Environmental, BGD: Background, FC: Final Clearance, HEX: HEPA Exhaust, AR: Area.

RESPIRATOR TYPE: HM: Half Face Negative Pressure, FF: Full Face Negative Pressure, PAPR: Power Air Purified Respirator, SAC: Supplied Air Continuos, Telephone (800) 303-0661 Fax (949) 654-1049

Time I .- 0 0 AI\A

Phone

Project ManagerJ" 5 V l'--"l~>\fL---'}e{~/tf\ _ Location \)·A ¥ Pi /?). \3Li)(; ~ ()33 Q Project Administrator~ t2 bet-TO P to V'-=f' S Contractor Name_-<--M~(Cr-::.-_-_C_-_., _ Contractor Address

Phone-----------

Yes No Comments Work Area Observations 1.

2.

3.

4.

5.

6.

7.

8.

Work area adequately isolated?

All openings to work area sealed?

Air movement system sealed off?

Appropriate negative pressure maintained in work area? How?

Appropriate warning signs at all entrance/ exits? (AHERA & NESHAPS) Entrance to work area securable?

EPA and OSHA regulations posted on site?

Number of workers in area _//-.L-__

Personal Protective Equipment

1. NIOSH approved respirators?

Type? tl"- ~ C1?

2. Disposable coveralls?

3. Head covering?

4. FooUshoecovering?

Decontamination Unit

1. Hangers/lockers/bins for street clothes?

2. Lock box for valuables?

3. Shower available on site?

4. Airlock to shower?

5. Sanitary conditions maintained?

6. Airlock to inside change room?

7. Disposal bin for protective equipment?

8. Airlock to work area?

Page 1 of3

Yes No

1. Are wet methods employed? ~

2. EPA-recommended wetting agent used? ~,

3. Are HEPA vacuum cleaners used? ~

4. Are light fixtures and other equipment cleaned before removal from work area? <.

5. Are furniture and other sanitary items in work area covered and sealed? ::;L

6. Are walls and floors covered and sealed?

7. Are polyethylene film barriers disposed of properly? ~

8. Is waste bagged while wet?

i9. Are 6-mil bags used?

10. Are bags properly labeled?

11. Are bags placed in drums and sealed?

12. Are workers wearing protective clothing at all times while in work area? '1---

13. Are workers disposing of contaminated clothing? ».

14. Are respirators worn at all times? ~

15. Not eating, drinking, smoking or gum/tobacco chewing in work area? ~

16. Are workers using the shower? A Disposal of Materials

1. Labels on the bags/drums? ~

2. Are drums with reptured bags disposed of

Properly? .r.

3. Manifests completed and maintained? A

4. Number of bags

Air Samples

1. Are necessary area and personal samples

Being obtained?

2. Are personal results posted for employees

Within two days?

3. Are samples properly obtained?

Page 2 of3

J&H Enviornmental, Inc.

Inspector'sComments *- ,UO A5~e5fu5 ~oud I <!JYt/v cetrr.ei- oj qc30 ViM -~ c&nzh--:....llY1--..11:...v-=--e-_J'---.'ftn'---- _

Inspector's Signature <j0lA-0Yt4~

Al~ALY'I'ICAL VA'I'A

CLIENT NAlvtE:

JOB NAlvtE:

JOB ADDRESS:

Midwest Environmental Control, Inc.

Vandenberg AFB Vandenberg AFB - Bldg. # 13330 Vandenberg, CA

JOB NUMBER: MEC99067 DATE: 7/14/99

PAGE: lof2

LABORATORY "PAT" ID #: 11067

ANALYTICAL METHOD NIOSH 7400 ftA"

Sample Pump Flow Cassette Sample Running Time Duration Volume Pump Calibration Field 1 Fiber F/Sq.mm Det. Lim Results J.D. No. (llmin.) Type Date Start Stop (Min.) (Liters) Before After Fiber/cc Fiber/cc

1 N/A 10.0 25 7/14199 7:15 9:30 135 1350 10.0 10.0 100 10.0 12.74 - 0.004 2 N/A 10.0 25 7/14/99 7:15 9:30 135 1350 10.0 10.0 100 12.0 15.29 - 0.004 3 N/A 10.0 25 7/14/99 7:15 9:30 135 1350 10.0 10.0 100 9.0 11.46 - 0.003 4 N/A 10.0 25 7/14/99 7:15 9:30 135 1350 10.0 10.0 100 7.0 8.92 - 0.003 5 N/A 0.0 25 7/14/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

DESCRIPTIVE INFORMATION

Sample Sample Resp.

J.D. Type Sample Location Type Remarks V.C.L.

I BGD Inside work area Background & prep 0.006 2 BGD Inside work area Background & prep 0.007 3 BGD Inside work area Background & prep 0.005 4 BGD Outside work area Background & prep 0.004 5 Blank N/A Blank sample

COMMENTS:

KEY TO ABBREVIATIONS

LE TYPE: PR: Personal, PRM: Penmeter, ENV: Environmenta, B D: Bac groun , FC: Final Clearance, HEX: HEPAExhaust, AR: Area.

Analyzed by: Jason Sullivan

HM: Ha f Face Negative Pressure, FF: Full Face Negative Pressure, PAPR: Power Air Purified Respirator, SAC: Supplied Air Continuos, SAPD: Su lied Air Pressure Demand, SCBA: Self Contained Breathing A paratus.

ANALY'l'lCAL VA'I'A

CLIENT NAME :

JOB NAME :

JOB ADDRESS :

Midwest Environmental Control, Inc.

Vandenberg AFB Vandenberg AFB - Bldg. # 13330 Vandenberg, CA

JOB NUMBER: MEC99067 DATE: 7/14/99

PAGE: 2of2

LABORATORY "PAT" ID #: 11067

ANALYTICAL METHOD NIOSH 7400 "A"

Sample Pump Flo,v Cassette Sample Running Time Duration Volume Pump Calibration Field 1 Fiber F/Sq.mm Det. Lim Results LD. No. (llmin.) Type Date Start Stop (Min.) (Liters) Before After Fiber/cc Fiber/cc

6 N/A 10.0 25 7/14/99 12:30 15:00 150 1500 10.0 10.0 100 14.0 17.83 - 0.005 7 N/A 10.0 25 7/14/99 12:30 15:00 150 1500 10.0 10.0 100 16.0 20.38 - 0.005 8 N/A 10.0 25 7/14/99 12:31 15:00 149 1490 10.0 10.0 100 13.0 16.56 - 0.004 9 N/A 10.0 25 7/14/99 12:31 15:00 149 1490 10.0 10.0 100 8.0 10.19 - 0.003 10 N/A 0.0 25 7/14/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

DESCRIPTIVE INFORMATION

Sample Sample Resp.

I.D. Type Sample Location Type Remarks V.C.L.

6 AR Inside work area Removal 0.008 7 AR Inside work area Removal 0.009 8 AR Inside work area Removal 0.007 9 ENV Outside work area Removal 0.004 10 Blank N/A Blank sample

CQMMENTS:

KEY TO ABBREVIATIONS

SAMPLE TYPE: PRS: Personal, PRM: Perimeter, ENV: Environmental, BGD: Background, FC: Final Clearance, HEX: HEPA Exhaust, AR: Area.

RESPIRATOR TYPE: HM: Half Face Negative Pressure, FF: Full Face Negative Pressure, PAPR: Power Air Purified Respirator, SAC: Supplied Air Continuos, ~Hvf-- J&H ENVIRONMENTAL, INC.

Telephone (800) 303-0661 Fax (949) 654-1049

Date 1 tt510j,~ Time J ~ 0 0 AM

Phone------------

Project Manager ::T. Sull f<\tet f\ LocationJ.Lib Ft 13 pLJ)(; it t3330 Project Administrator ~ l- bOi3~ +"" l ~V-~5 Contractor Name--.L(\')---I-..:.-..l't~4o'_e-__~ _ Contractor Address--------_._------------------

Phone------------

Work Area Observations

1. Work area adequately isolated?

2. All openings to work area sealed?

3. Air movement system sealed off?

4. Appropriate negative pressure maintained in work area? How?

5. Appropriate warning signs at all entrance/ exits? (AHERA & NESHAPS)

6. Entrance to work area securable?

7. EPA and OSHA regulations posted on site?

8. Number of workers in area I----

Personal Protective Equipment

1. NIOSH approved respirators?

Type? t['L +0'\Cf

2. Disposable coveralls?

3. Head covering?

4. Foot/shoe covering?

Decontamination Unit

1. Hangers/lockers/bins for street clothes?

2. Lock box for valuables?

3. Shower available on site?

4. Airlock to shower?

5. Sanitary conditions maintained?

6. Airlock to inside change room?

7. Disposal bin for protective equipment?

8. Airlock to work area?

Yes No Comments

(L~OV'fA \

Aug 0399 01:13p oU~-t:I~l'-l-/-:;)t:. p. 1

~ '===, CONTINENTAL ENVIROTECH. INC.

__.._r;~_____t

ADHS #AZOol :)

AIHAPAT#18' 06

CA ElAP #2~~GI'·

.~oss. #AA 000 5;

NVLAP: 20008]-0

TX DOH: 3O-(t5i Od

J &.H Environmental

540.5 Alton Parkway

Irvine CA. 92604

Al"fl,NTION: Tom Sullivan LAB: 99-B891 PROJECT V.A.F.B.Bldg. 13330

METHOD NIOSH 7082

10 efollowing results are for Lead in Air Analysis

·'lLENO. DESC·RIPTION TOTAL ActualExp.

LEAD Jlglm3

(J.1g)

Inside WorkArea 9.80 5.44

Outside WorkArea 2.45 1.36

GilbertSaldana <2.00 <3.33

Inside Work Area <2.00 <1.11

S.Alv1l

August 3, 1999

SteveChamberlain ·

*Plea::ie note: All lead analysis is subcontracted to Schneider Laboratories, Inc.

646 West Broadwav Road, Suite 401. Mesa, Arizona 85210- 1212

:'(602)844- 1710 • Fox (602) 844·1152 • Toll Free (800) 985-8804 • e-maitcei@futureone.com

Time I :00 A.A/\.

5405 Alton Parkway, Suite 5A-623, Irvine, CA 92604

Telephone (800) 303-0661 Fax (949) 654-1049

Project Manager ::T. 5 v [ l l V Ct (\ . Date -, II '1 / qCJ.

Location t/'. A -£ . B [1LDG#? 13"3~o 7~ IniAC/- (Zb:>J\A

Project Administrator ~ t 90 be.-r-TO r- Lo V'-~S "Phone _ Contractor Name----4-M--"--_,_8_,_c__e, _

,Contractor Address--------------------------- Phone------------

Work Area Observations

1. Work area adequately isolated?

2. All openings to work area sealed?

3. Air movement system sealed off?

4. Appropriate negative pressure maintained in work area? How?

5. Appropriate warning signs at all entrance/ exits? (AHERA & NESHAPS)

6. Entrance to work area securable?

7. EPA and OSHA regulations posted on site?

8. Number of workers in area It

Personal Protective Equipment

1. NIOSH approved respirators?

Type? \/'J- F8C~

2. Disposable coveralls?

3. Head covering?

4. FooUshoecovering?

Decontamination Unit

1. Hangers/lockers/bins for street clothes?

2. Lock box for valuables?

3. Shower available on site?

4. Airlock to shower?

5. Sanitary conditions maintained?

6. Airlock to inside change room?

7. Disposal bin for protective equipment?

8. Airlock to work area?

Page 1 of3

Yes No v.

~/A= v:

h

:L

1. Are wet methods employed? ~

2. EPA-recommended wetting agent used? ~

3. Are HEPA vacuum cleaners used? ~

4. Are light fixtures and other equipment cleaned before removal from work area? ~

5. Are furniture and other sanitary items in work area covered and sealed? ~

6. Are walls and floors covered and sealed?

7. Are polyethylene film barriers disposed of properly? ~

8. Is waste bagged while wet? :£-

9. Are 6-mil bags used? ~

10. Are bags properly labeled? ~

11. Are bags placed in drums and sealed? ~

12. Are workers wearing protective clothing at all times while in work area? ::t-

13. Are workers disposing of contaminated clothing? ~

14. Are respirators worn at all times? ~,

15. Not eating, drinking, smoking or gum/tobacco chewing in work area? ~.

16. Are workers using the shower? :£ Disposal of Materials

1. Labels on the bags/drums? ~

2. Are drums with reptured bags disposed of

Properly? ~

3. Manifests completed and maintained? )C

4. Number of bags

Air Samples

1. Are necessary area and personal samples

Being obtained? $-

2. Are personal results posted for employees

Within two days? L

3. Are samples properly obtained? :£-

Page 2 of3 J&H Enviornmental, Inc.

l;OOO\fV'. - ArrtueJ. C)JI\. "5\'T~ IJJOV'~ coI\T/Y\ve.5 ins/De wo~K ArerA) r-fMQ\roll flr:= MCiSjtC.:.

L{ : o0 f"1,' 1€ G\\r 00\,j 11\ j---------:::-------:----;;:::::--~----------------- 0' t. '30 fM - EV\() ~ v 0 h~lf_T~ _

Inspector's Signature'7~d~

Al~ALY'.l'lLAL UA'l'A

CLIENT NAME :

JOB NAME :

JOB ADDRESS:

Midwest Environmental Control, Inc.

Vandenberg AFB Vandenberg AFB -Bldg. # 13330 Vandenberg, CA

JOB NUMBER: MEC99067 DATE: 7/19/99

PAGE: lof2

LABORATORY "PAT" ill #: 11067 ANALYTICAL METHOD NIaSH 7400 "A"

Sample Pump Flow Cassette Sample Running Time Duration Volume Pump Calibration Field I Fiber F/Sq.mm Det. Lim Results

1.0. No. (l/min.) Type Date Start Stop (Min.) (Liters) Before After Fiber/cc Fiber/cc

1 N/A 10.0 25 7/19/99 7:15 10:30 195 1950 10.0 10.0 100 13.0 16.56 - 0.003 2 N/A 10.0 25 7/19/99 7:15 10:30 195 1950 10.0 10.0 100 15.0 19.11 - 0.004 3 N/A 10.0 25 7/19/99 7:17 10:30 193 1930 10.0 10.0 100 11.0 14.01 - 0.003 4 N/A 10.0 25 7/19/99 7:19 10:31 192 1920 10.0 10.0 100 7.0 8.92 - 0.002 5 N/A 10.0 25 7/19/99 12:05 13:45 100 1000 10.0 10.0 100 10.0 12.74 - 0.005 6 N/A 10.0 25 7/19/99 12:05 13:45 100 1000 10.0 10.0 100 12.0 15.29 - 0.006 7 N/A 10.0 25 7/19/99 12:05 13:45 100 1000 10.0 10.0 100 13.0 16.56 - 0.006

DESCRIPTIVE INFORMATION

Sample Sample Resp.

J.D. Type Sample Location Type Remarks U.C.L.

1 AR Inside work area - dining room Removal 0.005 2 AR Inside work area - dining room Removal 0.006 3 AR Inside work area - dining room Removal 0.005 4 ENV Outside work area - dining room Removal 0.003 5 AR Inside work area - dining room Removal 0.008 6 AR Inside work area - dining room Removal 0.010 7 AR Inside work area - dining room Removal 0.010

COMMENTS:

KEY TO ABBREVIATIONS

LE TYPE: PRS: Personal, PRM: Perimeter, ENV: Environmental, B D: ac ground, FC: Final Clearance, HEX: HEPA Exhaust, AR: Area.

HM: H Face Negative Pressure, FF: Full Face Negative Pressure, PAPR: Power Air Purified Respirator, SAC: Supplied Air Continuos, SAPD: Su lied Air Pressure Demand, SCBA: Self Contained Breathin A paratus, ANALY'l'lCAL UA'l'A

CLIENT NAME :

JOBNAME:

JOB ADDRESS:

Midwest Environmental Control, Inc.

Vandenberg AFB Vandenberg AFB - Bldg. # 13330 Vandenberg,CA

JOB NUMBER: MEC99067 DATE: 7/19/99

PAGE: 2of2

LABORATORY "PAT" ill #: 11067

ANALYTICAL METHOD NIOSH 7400 "A"

Sample Pump Flow Cassette Sample Running Time Duration Volume Pump Calibration Field / Fiber F/Sq.mm Det. Lim Results I.D. No. (l/min.) Type Date Start Stop (Min.) (Liters) Before After Fiber/cc Fiber/cc

8 N/A 10.0 25 7/19/99 12:07 13:45 98 980 10.0 10.0 100 6.0 7.64 - 0.003 9 N/A 10.0 25 7/19/99 13:45 15:45 120 1200 10.0 10.0 100 2.0 2.55 0.0022 B.D.L.

10 N/A 10.0 25 7/19/99 13:45 15:45 120 1200 10.0 10.0 100 1.0 1.27 0.0022 B.D.L.

11 N/A 10.0 25 7/19/99 13:45 15:45 120 1200 10.0 10.0 100 3.0 3.82 0.0022 B.D.L.

12 N/A 10.0 25 7/19/99 13:45 15:45 120 1200 10.0 10.0 100 1.0 1.27 0.0022 B.D.L.

13 N/A 0.0 25 7/19/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

14 N/A 0.0 25 7/19/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

15 N/A 0.0 25 7/19/99 0:00 0:00 0 0 0.0 0.0 100 0.0 0 - N.D.

DESCRIPTIVE INFORMATION

Sample Sample Resp.

I.D. Type Sample Location Type Remarks V.C.L.

8 AR Inside work area - dining room Removal 0.005 9 FC Inside work area - dining room Final clearance 10 FC Inside work area- dining room Final clearance 11 FC Inside work area - dining room Final clearance 12 FC Outside work area - dining room Final clearance 13 Blank N/A Blank sample

14 Blank N/A Blank sample 15 Blank N/A Blank sample

COMMENTS:

KEY TO ABBREVIATIONS

LE TYPE: PR: Person , PRM: Perimeter, ENV: Environmental, B

FC: Final Clearance, HEX: HEPA Exhaust, AR: Area.

Analyzed by: Jason Sullivan

HM: Ha fFace Negative Pressure, FF: Full Face Negative Pressure, SAPD: Su lied Air Pressure Demand, SCBA: Self Contained Breathin A aratus.

Tve ~

5405 Alton Parkway, PMB 623, Irvine, CA 92604 Telephone (800) 303-0661 Fax (949) 654-1049

Time 1:00~Project Manager J. 5 v Ll i Vpo.. V' Date J IJo {qq Location x/, f!.. · F. B, 13LD~-:t4= i33"30 \)tf\\'(\.Ct\~ Project Administrator v?.L~O h~Ir~ .f Lo r"f-S Phone _ Contractor Name \A~.-=8_·4--'-C_./ _ Contractor Address----------------------------

Phone------------

Work Area Observations Yes No Comments

1.

2.

3.

4.

5.

6.

7.

8.

Work area adequately isolated?

All openings to work area sealed?

Air movement system sealed off?

Appropriate negative pressure maintained in work area? How?

Appropriate warning signs at all entrance/ exits? (AHERA & NESHAPS) Entrance to work area securable?

EPA and OSHA regulations posted on site?

Number of workers in area (9---=

Personal Protective Equipment

1. NIOSH approved respirators?

Type? ll2- fACE

2. Disposable coveralls?

3. Head covering?

4. Foot/shoe covering?

Decontamination Unit

1. Hangers/lockers/bins for street clothes?

2. Lock box for valuables?

3. Shower available on site?

4. Airlock to shower?

5. Sanitary conditions maintained?

6. Airlock to inside change room?

7. Disposal bin for protective equipment?

8. Airlock to work area?

1. Are wet methods employed? X.-

2. EPA-recommended wetting agent used? L

3. Are HEPA vacuum cleaners used? ~

4. Are light fixtures and other equipment cleaned before removal from work area? »:

5. Are furniture and other sanitary items in work area covered and sealed? ~

6. Are walls and floors covered and sealed?

7. Are polyethylene film barriers disposed of properly? v:

8. Is waste bagged while wet? 'A

9. Are 6-mil bags used? ~

10. Are bags properly labeled? 1::

11. Are bags placed in drums and sealed? :£-

12. Are workers wearing protective clothing at all times while in work area? ~13. Are workers disposing of contaminated clothing? r14. Are respirators worn at all times? .x:

15. Not eating, drinking, smoking or gum/tobacco chewing in work area? x.

16. Are workers using the shower? ~

Disposal of Materials

1. Labels on the bags/drums? 'f!...

2. Are drums with reptured bags disposed of

Properly? ~~

3. Manifests completed and maintained? ~

4. Number of bags

Air Samples

1. Are necessary area and personal samples

Being obtained?

2. Are personal results posted for employees

Within two days?

3. Are samples properly obtained?

I~OOoJ.A- Arr~ve.d. eI"" s iTt 6LOgif- l3330 BeAg -OUT ~F A-C. M-..-beq1ns

Jl~OOV\AA- J\JOOtJ.. LVI\CH BR~AK

Inspector's Signature qf'.A4ov1'1..L~

Page3 of3

Date (I d-O /0; ~

J&H Environmental, Inc.

CONTINENTAL ENVIROTECH, INC.

ADHS #AZ0916

AIHA PAT #18106

CAELAP#2204

Mass. #AA 000 155

NVLAP: 200080-0

TX DOH: 30-0208

J & H Environmental 5405 Alton Parkway Irvine, CA. 92604

ATTENTION: Tom Sullivan LAB: 99-B891 PROJECT V.A.F.B. Bldg. 13330

METHOD NIOSH7082

The following results are for Lead in Air Analysis

SAMPLE NO. DESCRIPTION TOTAL Actual Exp, LEAD J.1g/m3

(~g)

01 Inside Work Area 9.80 5.44

02 Outside Work Area 2.45 1.36

03 Gilbert Saldana <2.00 <3.33

04 Inside Work Area <2.00 <1.11

Reviewed By.. .~ SteveChamberlain

August 3, 1999

*Pleasenote: All lead analysis is subcontracted to SchneiderLaboratories, Inc.