Attch_8D_AF3064_3065_Spreadsheet.xls
XLS spreadsheet 139 KB Posted
- Attached to
- SABER 2019 Federal contract opportunity
- Solicitation number
- FA461018R0001
About this file
This document contains a federal contract opportunity notice and progress chart template. The notice is for the 2019 Vandenberg Air Force Base SABER IDIQ solicitation seeking streamlined construction and maintenance services on Vandenberg AFB and associated sites. Services include various trades such as carpentry, asbestos abatement, demolition, mechanical, electrical, plumbing, concrete, and painting. The solicitation is contemplated as a competitive 8(a) multiple-award IDIQ with firm-fixed-price task orders to three eligible 8(a) contractors located in California. The NAICS code is 236220 with a size standard of $36.5 million. The progress chart template is AF Form 3065 for reporting contract progress with columns for planned and actual percentages completed by work element and period.
Attch 8D AF3064/AF3065
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SABER_Q&A.pdf | ||
| Saber_Preproposal_Conference.pdf | ||
| 18R0001_RFP_Conformed_to_Amend_0001.pdf | ||
| 18R0001_Amend_0001_SF30.pdf | ||
| Saber_Site_Validation_Visit_Sign-in_FBO.pdf | ||
| Attch_6_Coefficient_Worksheet_20180125.xlsx | XLSX spreadsheet | |
| FA461018R0001_RFP_20180226.pdf | ||
| Attch_1_SABER_Master_Specs_20180129.pdf | ||
| Attch_8B_Demo_Project_Drawings.pdf | ||
| Attch_2_VAFB_FacExcel_Stds_20170418.pdf | ||
| Attch_7_Executive_Summary_Sheet.docx | DOCX document | |
| Attch_5_Other_County_CA170029_Mod-26_20171124.pdf | ||
| Attch_8C_SchMatlSubmittals.xls | XLS spreadsheet | |
| Attch_4_Ventura_County_CA170025_Mod-15_20171013.pdf | ||
| Attch_8A_Demo_Project_SOO.pdf | ||
| Attch_3_SB_County_CA170023_Mod-15_20171013.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Billings
| Innovative Technical Solutions | |||||||||
| 2730 Shadelands Drive Suite 100 | |||||||||
| Walnut Creek, CA 94598 | |||||||||
| 925-946-3102 | |||||||||
| INVOICE 07018.6605-04 | |||||||||
| March 20, 2008 | |||||||||
| Bill to: | Project: | ||||||||
| AFCEE | Bldg.8401 Renovations | ||||||||
| C/O 30 CONS | Vandenberg AFB, CA | ||||||||
| 1515 Iceland Ave. | Contract No: FA8903-04-D-8709 | ||||||||
| Bldg 8500 Room 150 | Task Order No: QW01 | ||||||||
| Attention: Denise Robb | VAFB Project Numbers: XUMU 10- 1136B, 1120B1, | ||||||||
| 1139B, 1140C, 1135B, 1154B, 1137B | |||||||||
| Total Earnings thru Pay Estimate #5 | |||||||||
| Activity for March 1, 2008 through March 31, 2008 | |||||||||
| Activity | Total | Previous | Previous | Earnings | Earnings | Current | Remaining | ||
| Number | Description | $ Amount | Earnings % | Earnings | to Date % | to Date | Earnings | $ Amount | |
| 055100 | General Conditions/Project Mgt | $ 1,021,201.01 | 41.67% | $ 425,534.46 | 58.33% | $ 595,666.55 | $ 170,132.09 | $ 425,534.46 | |
| 055110 | Design | $ 188,700.40 | 97.02% | $ 183,077.13 | 100.00% | $ 188,700.40 | $ 5,623.27 | $ - 0 | |
| 059100 | 1120B1 – ANG/ARC Renovation | $ 1,147,214.90 | 15.84% | $ 181,718.84 | 49.21% | $ 564,544.45 | $ 382,825.61 | $ 582,670.45 | |
| 059110 | 1136B – SCIF Expansion | $ 470,915.37 | 17.79% | $ 83,775.84 | 59.95% | $ 282,313.76 | $ 198,537.92 | $ 188,601.61 | |
| 059120 | 1139B – SCIF Exp, Internal Renov | $ 407,054.57 | 8.08% | $ 32,890.01 | 59.95% | $ 244,029.21 | $ 211,139.20 | $ 163,025.36 | |
| 059130 | 1140C – SCIF Exp, HVAC & Power | $ 294,144.08 | 2.32% | $ 6,824.14 | 60.00% | $ 176,486.45 | $ 169,662.31 | $ 117,657.63 | |
| 059160 | 1135B – Internal Security Measures | $ 512,738.95 | 0.00% | $ - 0 | 20.04% | $ 102,752.89 | $ 102,752.89 | $ 409,986.06 | |
| 059170 | 1137B – Renov Rms 1, 11, 51, 160 | $ 429,715.20 | 20.61% | $ 88,564.30 | 64.90% | $ 278,885.16 | $ 190,320.86 | $ 150,830.04 | |
| 059180 | 1154B – Passenger Elevator | $ 542,804.36 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ 542,804.36 | |
| 059800 | Bond | $ 47,290.00 | 100.00% | $ 47,290.00 | 100.00% | $ 47,290.00 | $ - 0 | $ - 0 | |
| Totals | $ 5,061,778.84 | $ 1,049,674.72 | 49.008% | $ 2,480,668.88 | $ 1,430,994.16 | $ 2,581,109.96 | |||
| This is to certify that the services set forth herein were performed during the periods stated. | |||||||||
| Signed: | Dated: | ||||||||
| Innovative Technical Solutions, Inc. |
AF Form 3064
| CONTRACT PROGRESS SCHEDULE | ||
| (See Contractor's Instructions on Reverse) | Form Approved |
OMB NO. 0704-0188
| Public reporting burdern for this collection of information is estimated to average 15 minutes per responses, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defencse, Washington Headquarters Services, Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed (form questionaire) to: SAF/AQCO, Pentagon, Washington DC 20330-1000 | |||||||||||||||||||||||||||
| 1. CONTRACT NO. | 8. PROJECT TITLE | 10. APPROVAL RECOMMENDED BY | |||||||||||||||||||||||||
| DATE SIGNED | INSTALLATION'S ENGINEER'S SIGNATURE | ||||||||||||||||||||||||||
| 2. STARTING DATE | |||||||||||||||||||||||||||
| 3. COMPLETION DATE | 9. SUBMITTED BY: | ||||||||||||||||||||||||||
| 4. PURCHASE REQUEST NO. | DATE SIGNED | CONTRACTOR'S NAME (LAST, FIRST, I) ADDRESS (STREET, CITY, STATE, ZIP) | CONTRACTOR'S SIGNATURE | 11. APPROVED BY | |||||||||||||||||||||||
| 5. PROJECT NO. | DATE SIGNED | CONTRACTING OFFICER'S SIGNATURE | |||||||||||||||||||||||||
| 6. ACTUAL STARTING DATE | |||||||||||||||||||||||||||
| 7. ACTUAL COMP DATE | |||||||||||||||||||||||||||
| LINE NO. | WORK ELEMENTS B | % C | Monthly | ||||||||||||||||||||||||
| A | 28-Feb-19 | 31-Mar-19 | 30-Apr-19 | 31-May-19 | 30-Jun-19 | 31-Jul-19 | 31-Aug-19 | 28-Sep-19 | 26-Oct-19 | 26-Nov-19 | 26-Dec-19 | 26-Jan-20 | 25-Feb-20 | 27-Mar-20 | 27-Apr-20 | 27-May-20 | 26-Jun-20 | 26-Jul-20 | 25-Aug-20 | 24-Sep-20 | 24-Oct-20 | 23-Nov-20 | 23-Dec-20 | 22-Jan-21 | |||
| 1 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 2 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 3 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 4 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 5 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 6 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 7 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 8 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 9 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 10 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 11 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 12 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 13 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 14 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 15 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 16 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 17 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 18 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 19 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 20 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 21 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 22 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 23 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 24 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 25 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| 26 | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Actual | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| Total (Proposed Schedule) | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Cummulative | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| Total (Actual Schedule) | Planned | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |
| Cummulative | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| Before Proposed: | 0.0185 | 0.0285 | 0.0545 | 0.0409 | 0.0335 | 0.034 | 0.0385 | 0.0385 | 0.0385 | 0.0685 | 0.0615 | 0.06 | 0.0515 | 0.0335 | 0.0335 | 0.0335 | 0.0335 | 0.0335 | 0.03 | 0.0305 | 0.0455 | 0.0385 | 0.067 | 0.0285 | |||
| 0.0185 | 0.047 | 0.1015 | 0.1424 | 0.1759 | 0.2099 | 0.2484 | 0.2869 | 0.3254 | 0.3939 | 0.4554 | 0.5154 | 0.5669 | 0.6004 | 0.6339 | 0.6674 | 0.7009 | 0.7344 | 0.7644 | 0.7949 | 0.8404 | 0.8789 | 0.9459 | 0.9744 | ||||
| Before Actual: | 0.0233 | 0.0185 | 0.0265 | 0.0743 | 0.0552 | 0.0626 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00003 | 0 | |||
| 0.0233 | 0.0418 | 0.0683 | 0.1426 | 0.1978 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.2604 | 0.26043 | 0.26043 |
&R&"Garamond,Bold"&12FA4610-18-R-0001 Attachment 8D - AF3064_3065 Spreadsheet &L&"Arial,Bold"&8AF FORM 3064, JUN 90 &"Arial,Bold Italic"&6 PREVIOUST EDITION IS OBSOLETE&R&"Garamond,Bold"&12&P
AF Form 3065
| CONTRACT PROGRESS REPORT | |||||||||||
| Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, Respondents should be aware that notwithstanding any other provisions of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060. | |||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| REPORT NO. | PERIOD COVERED | PROJECT NO. | CONTRACT NO. | COMPLETION DATE | |||||||
| 0 | |||||||||||
| 1 | FROM: | TO: | 31-Dec-99 | ||||||||
| LINE NO. | WORK ELEMENT | % OF TOTAL JOB | % COMPLETED THIS PERIOD | % COMPLETED CUMULATIVE | |||||||
| 1 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 2 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 3 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 4 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 5 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 6 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 7 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 8 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 9 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 10 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 11 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 12 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 13 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 14 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 15 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 16 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 17 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 18 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 19 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 20 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 21 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 22 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| 23 | 0 | 0.00% | 0.00% | 0.00% | |||||||
| TOTAL | 0.00% | 0.00% | 0.00% | ||||||||
| REMARKS | |||||||||||
| CE EVALUATOR'S CERTIFICATION SIGNATURE: . | |||||||||||
| Concur | |||||||||||
| Do not concur | |||||||||||
| Concur, but with provisions and comments as written on the reverse | |||||||||||
| At the Contracting discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments. | |||||||||||
| PROGRESS OR COMPLETION CERTIFICATE | |||||||||||
| I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specs. | |||||||||||
| SUBMITTED BY OR FOR | |||||||||||
| CONTRACTOR | BASE CIVIL ENGINEER | ||||||||||
| TYPED NAME AND TITLE | SIGNATURE | DATE | |||||||||
| REVIEWED BY OR FOR CONTRACTING OFFICER | |||||||||||
| TYPED NAME AND TITLE | SIGNATURE | DATE |
&L&"Arial,Bold"AF FORM 3065, APR 96 &"Arial,Bold Italic"(EF -V2) &"Arial,Italic"&8(PerForm Pro) &R&8PREVIOUS EDITION OBSOLETE.
Progress Chart
Progress Chart
| 43524 | 43524 |
| 43555 | 43555 |
| 43585 | 43585 |
| 43616 | 43616 |
| 43646 | 43646 |
| 43677 | 43677 |
| 43708 | 43708 |
| 43736 | 43736 |
| 43764 | 43764 |
| 43795 | 43795 |
| 43825 | 43825 |
| 43856 | 43856 |
| 43886 | 43886 |
Estimated % Completed Actual % Complete Monthly % Complete Percent Complete February 2019 - Progress Chart