Attch_8C_SchMatlSubmittals.xls
XLS spreadsheet 49 KB Posted
- Attached to
- SABER 2019 Federal contract opportunity
- Solicitation number
- FA461018R0001
About this file
This document contains a pre-solicitation notice for the SABER 2019 program. The Air Force intends to issue solicitation FA4610-18-R-0001 on or around February 2, 2018 for a Simplified Acquisition of Base Engineer Requirements Indefinite Delivery/Indefinite Quantity multiple award contract to three eligible 8(a) contractors located in California. Work under the SABER program will provide maintenance, repair, and construction services for real property assets on Vandenberg Air Force Base and surrounding sites. The North American Industry Classification System code is 236220 for construction of other new nonresidential structures, with a size standard of $36.5 million. This acquisition will follow Federal Acquisition Regulation requirements for negotiated procurements and construction and architect-engineer contracts.
Attch 8C Schedule Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SABER_Q&A.pdf | ||
| Saber_Preproposal_Conference.pdf | ||
| 18R0001_Amend_0001_SF30.pdf | ||
| Saber_Site_Validation_Visit_Sign-in_FBO.pdf | ||
| 18R0001_RFP_Conformed_to_Amend_0001.pdf | ||
| Attch_4_Ventura_County_CA170025_Mod-15_20171013.pdf | ||
| Attch_8A_Demo_Project_SOO.pdf | ||
| Attch_3_SB_County_CA170023_Mod-15_20171013.pdf | ||
| Attch_6_Coefficient_Worksheet_20180125.xlsx | XLSX spreadsheet | |
| FA461018R0001_RFP_20180226.pdf | ||
| Attch_1_SABER_Master_Specs_20180129.pdf | ||
| Attch_8D_AF3064_3065_Spreadsheet.xls | XLS spreadsheet | |
| Attch_8B_Demo_Project_Drawings.pdf | ||
| Attch_2_VAFB_FacExcel_Stds_20170418.pdf | ||
| Attch_7_Executive_Summary_Sheet.docx | DOCX document | |
| Attch_5_Other_County_CA170029_Mod-26_20171124.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: | ||
| [ enter here ] | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | ||||||||||||||||||||||
| 2 | ||||||||||||||||||||||
| 3 | ||||||||||||||||||||||
| 4 | ||||||||||||||||||||||
| 5 | ||||||||||||||||||||||
| 6 | ||||||||||||||||||||||
| 7 | ||||||||||||||||||||||
| 8 | ||||||||||||||||||||||
| 9 | ||||||||||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).&R&"Garamond,Bold"&12FA4610-18-R-0001 Attachment 8C - Schedule of Material Submittals &R&"Garamond,Bold"&12 &"Arial,Regular"&10 &"Garamond,Bold"&12&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .