FA461017R0002-0001.pdf

PDF 30 KB Posted

Attached to
VELA MACC Federal contract opportunity
Solicitation number
FA4610-17-R-0002
Issued by
Department of the Air Force Space Command

About this file

This document provides details for the VELA MACC solicitation for construction services at Vandenberg Air Force Base, Edwards Air Force Base, and Los Angeles Air Force Base. The solicitation will seek to award up to seven indefinite-delivery, indefinite-quantity contracts to 8(a) Business Development program participants headquartered in California for a base period and four one-year options. Services will include maintenance, repair, and new construction of buildings, facilities, and base infrastructure performed under design/build or bid/build processes. The solicitation is anticipated to be released on or about August 21, 2017 under NAICS code 236220 and a $36.5 million size standard as a competitive 8(a) set-aside.

Amendment 001

View the file

Other files for this federal contract opportunity

Other files attached to VELA MACC, newest first.
File Type Posted
QA_RE_Solicitation_8Jan2018.pdf PDF
Q&A_Attachment_03_Bomarc_Bed_Office_Mod_May15.pdf PDF
Q&A_Attachment_04_13123_Furnishings.pdf PDF
QA_RE_Solicitation_19Dec2017.pdf PDF
Site_Visit_Sign-in_19Dec2017.pdf PDF
FA4610-17-R-0002-0003.pdf PDF
FA4610-17-R-0002_Conformed_Through_Amendment_0003.pdf PDF
Site_Visit_Sign-in_Compiled.xlsx XLSX spreadsheet
QA_RE_Solicitation_8Dec2017.pdf PDF
Q&A_Attachment_2_As-Built_Drawings.pdf PDF
FA4610-17-R-0002-0002.pdf PDF
Attch_9b_-_Sample_Project_TO_Concept_Design_Rev_Dec17.pdf PDF
FA4610-17-R-0002_Conformed_Through_Amendment_0002.pdf PDF
FA461017R0002_Conformed_to_Amend_01.pdf PDF
Attch_9_-_Sample_Project_TOR_11-29-2017.pdf PDF
Q&A_RE_Solicitation_29Nov2017.pdf PDF
Attch_1_-_VELA_MACC_SOW_11-21-2017.pdf PDF
Q&A,_Attachment_1_Environment_Report_Bldg_13123.pdf PDF
Attch_1c_-_CCEB.xls XLS spreadsheet
Attch_1d_-_VAFB_Spec_01_00_00.doc DOC document
Attch_1a_-_AF103.pdf PDF
Attch_8c_-_PP_Authorization_Ltr.docx DOCX document
Attch_3_-_Kern_County_WD_Mod_14_2017-10-13.pdf PDF
Attch_7_-_PPIS.pdf PDF
Attch_1_-_VELA_MACC_SOW_08-23-2017.pdf PDF
Attch_9b_-_Sample_Project_TO_Concept_Design.pdf PDF
Attch_9a_-_Sample_Project_TO_SOW.pdf PDF
Attch_5_-_SM-Monterey_County_WD_Mod_25_2017-11-10.pdf PDF
Attch_1f_-_VAFB_Facility_Excellence_Standards_Apr_17.pdf PDF
Attch_8b_-_PP_Consent_Ltr.docx DOCX document
Attch_1h_-_EAFB_Design_Standards_2015.pdf PDF
FA461017R0002.pdf PDF
Attch_8a_-_PP_Cover_Letter.pdf PDF
Attch_1b_-_Submittal_Schedule.xls XLS spreadsheet
Attch_1e_-_VAFB_Enviro_Spec_01_57_20.docx DOCX document
Attch_1j_-_LAAFB_Env_Specs.pdf PDF
Attch_1k_-_LAAFB_SHIP_Requirements.pdf PDF
Attch_6_-_Ventura_County_WD_Mod_15_2017-10-13.pdf PDF
Attch_4_-_LA_County_WD_Mod_14_2017-11-10.pdf PDF
Attch_1g_-_VAFB_CAD_Standards_2013.zip ZIP file
Attch_1i_-_LAAFB_Facilities_Excellence_Plan_2014.pdf PDF
Attch_8_-_PPQ.pdf PDF
Attch_2_-_SB_County_WD_Mod_15_2017-10-13.pdf PDF
Attch_9_-_Sample_Project_TOR_08-02-2017.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VELA MACC

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to make administrative revisions to Attachment 1 - Statement of Work and Attachment 9 Seed Project Task Order Request (TOR).

b. Attachment 1 has been revised so that the page numbers in the table of contents reflect the correct page numbers for the paragraphs.

Additionally excess spaces w ere removed reducing the total page count to 34. As a result of this change the date of Attachment 1 has been revised from 23 August 2017 to 21 November 2017 and the list of attachments in Section J updated to match the revised date and page count.

c. Attachment 9 line item #9 has been revised to read "Liquidated damages w ill be assessed for this project in the amount of $1,336.47 per day." As a result of this revision the date of Attachment 9 has been changed from 7 February 2017 to 29 Nov 2017 and the list of attachments in Section J updated to match the revised date.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Nov-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4610-17-R-0002

X 9B. DATED (SEE ITEM 11)

20-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Nov-2017

CODE

FA4610 - 30TH CONS

1515 ICELAND AVE. (BLDG 8500), RM 150

VANDENBERG AFB CA 93437-5212

FA4610 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4610-17-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

Attachment Title Date Pages 1 Statement of Work 21 November 2017 34

1a Base Civil Engineering Work Clearance Request (AF Form 103)

1 August 1994 2

1b Submittal Schedule N/A 1 1c Construction Cost Estimate Breakdown N/A 48 1d Vandenberg AFB Specification 01 00 00 6 January 2017 18 1e Vandenberg AFB Specification 01 57 20 May 2016 42 1f Vandenberg AFB Facilities Excellence Plan 18 April 2017 319 1g Vandenberg AFB CAD Standards (.zip file) Various Various 1h Edwards AFB Design Standards February 2015 97 1i Los Angeles AFB Facility Excellence Plan 2014 126 1j Los Angeles AFB Environmental Specifications N/A 85 1k Los Angeles AFB State Historic Preservation Office

(SHPO) Requirements N/A 2

2 Santa Barbara County Construction Wage Rate Requirements Statute Wage Determination CA170023*

13 October 2017 27

3 Kern County Construction Wage Rate Requirements Statute Wage Determination CA170031*

13 October 2017 31

4 Los Angeles County Construction Wage Rate Requirements Statute Wage Determination CA170033*

10 November 2017 29

5 San Mateo/Monterey County Construction Wage Rate Requirements Statute Wage Determination CA170029*

10 November 2017 84

6 Ventura County Construction Wage Rate Requirements Statute Wage Determination CA170025*

13 October 2017 27

7 Past Performance Information Sheet N/A 2 8 Past Performance Questionnaire N/A 4

8a Past Performance Cover Letter N/A 1 8b Past Performance Consent Letter N/A 1 8c Past Performance Client Authorization Letter N/A 1

9 Seed Project Task Order Request (TOR) 29 November 2017 2 9a Seed Project Task Order Statement of Work 19 December 2016 15 9b Seed Project Concept Design April 2015 8

*The Construction Wage Rate Requirements Statute Wage Determinations for each location will be updated to the most current version at the time of initial contract award and updated annually thereafter when option periods are exercised.

(End of Summary of Changes)

FA4610-17-R-0002

File details come from the government source that posted it. Updated .