This task order request solicits proposals for the repair of a dormitory facility at Vandenberg Air Force Base, California. The scope of work includes design and construction services to repair Bomarc Dormitory, Facility No. 13123, with a budget between $1 million and $5 million. Proposals are due by January 12, 2018 and must include a technical proposal demonstrating understanding of requirements, a construction schedule, and a redacted cost estimate. Evaluation will be based on technical acceptability criteria defined in the request. The successful offeror must be awarded an indefinite-delivery, indefinite-quantity contract under the VELA MACC, and work will be awarded on a lowest-price technically acceptable basis. Liquidated damages of $1,336.47 per day will apply, and bonds are required.

Attachment 9 to include Liquidated Damages value

View the file

Other files for this federal contract opportunity

Other files attached to VELA MACC, newest first.
File Type Posted
Q&A_Attachment_04_13123_Furnishings.pdf PDF
QA_RE_Solicitation_8Jan2018.pdf PDF
Q&A_Attachment_03_Bomarc_Bed_Office_Mod_May15.pdf PDF
QA_RE_Solicitation_19Dec2017.pdf PDF
Site_Visit_Sign-in_19Dec2017.pdf PDF
FA4610-17-R-0002-0003.pdf PDF
FA4610-17-R-0002_Conformed_Through_Amendment_0003.pdf PDF
Site_Visit_Sign-in_Compiled.xlsx XLSX spreadsheet
Q&A_Attachment_2_As-Built_Drawings.pdf PDF
FA4610-17-R-0002-0002.pdf PDF
QA_RE_Solicitation_8Dec2017.pdf PDF
FA4610-17-R-0002_Conformed_Through_Amendment_0002.pdf PDF
Attch_9b_-_Sample_Project_TO_Concept_Design_Rev_Dec17.pdf PDF
FA461017R0002_Conformed_to_Amend_01.pdf PDF
Q&A_RE_Solicitation_29Nov2017.pdf PDF
Q&A,_Attachment_1_Environment_Report_Bldg_13123.pdf PDF
FA461017R0002-0001.pdf PDF
Attch_1_-_VELA_MACC_SOW_11-21-2017.pdf PDF
Attch_9b_-_Sample_Project_TO_Concept_Design.pdf PDF
Attch_9a_-_Sample_Project_TO_SOW.pdf PDF
Attch_5_-_SM-Monterey_County_WD_Mod_25_2017-11-10.pdf PDF
Attch_1f_-_VAFB_Facility_Excellence_Standards_Apr_17.pdf PDF
Attch_8b_-_PP_Consent_Ltr.docx DOCX document
Attch_1c_-_CCEB.xls XLS spreadsheet
Attch_1d_-_VAFB_Spec_01_00_00.doc DOC document
Attch_1a_-_AF103.pdf PDF
Attch_8c_-_PP_Authorization_Ltr.docx DOCX document
Attch_3_-_Kern_County_WD_Mod_14_2017-10-13.pdf PDF
Attch_7_-_PPIS.pdf PDF
Attch_1_-_VELA_MACC_SOW_08-23-2017.pdf PDF
Attch_4_-_LA_County_WD_Mod_14_2017-11-10.pdf PDF
Attch_1g_-_VAFB_CAD_Standards_2013.zip ZIP file
Attch_1i_-_LAAFB_Facilities_Excellence_Plan_2014.pdf PDF
Attch_8_-_PPQ.pdf PDF
Attch_2_-_SB_County_WD_Mod_15_2017-10-13.pdf PDF
Attch_9_-_Sample_Project_TOR_08-02-2017.pdf PDF
Attch_1h_-_EAFB_Design_Standards_2015.pdf PDF
FA461017R0002.pdf PDF
Attch_8a_-_PP_Cover_Letter.pdf PDF
Attch_1b_-_Submittal_Schedule.xls XLS spreadsheet
Attch_1e_-_VAFB_Enviro_Spec_01_57_20.docx DOCX document
Attch_1j_-_LAAFB_Env_Specs.pdf PDF
Attch_1k_-_LAAFB_SHIP_Requirements.pdf PDF
Attch_6_-_Ventura_County_WD_Mod_15_2017-10-13.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4610-17-R-0002

Attachment 9

GUARDIANS OF THE HIGH FRONTIER

**NOTE: This Task Order Request is for evaluation purposes for the VELA MACC IDIQ contract. An award of the work identified in this task order is not anticipated, however, the Government reserves the right to award this project to the lowest price technically acceptable offeror which has been awarded an IDIQ contract on the VELA MACC if sufficient funding is available at time of award.**

29 Nov 2017

MEMORANDUM FOR: VELA MACC CONTRACTORS

FROM: 30 CONS/LGCA

1515 ICELAND AVE, ROOM 150

VANDENBERG AFB CA 93437-5212

SUBJECT: VELA MACC Task Order Request (TOR), Project XUMU 09-1253B, Repair Bomarc

Dorm, Facility No. 13123, Vandenberg AFB, CA.

1. A site visit will be held on Monday, 12 December 2017, at 09:00 A.M., Pacific Standard

Time (PST).

2. Contractor shall provide a proposal in accordance with the procedures specified in the VELA MACC Statement of Work paragraph 2.d to this office No Later Than (NLT) Friday, 12 January 2018, at 3:00 P.M. PST.

3. The proposal shall include a technical proposal that includes a narrative of the design and construction approach, a construction schedule and redacted construction estimate (i.e. no specific pricing information). The narrative should describe the design and construction processes, without restating the SOW, and include a description of the phases of design and construction, list of design drawings to be included, applicable codes and regulations, and should demonstrate an understanding of the requirements of the sample project. The construction schedule should identify all applicable tasks and reasonable times to complete the project. The construction estimate should identify an appropriate mix of labor and materials in reasonable quantities and use units of measure other than lump sum.

4. Contractor shall acknowledge receipt of each amendment to the titled RFP by stating each amendment on the proposal cover letter. If no Contractor acknowledgment is received, the Government may determine the Contractor’s proposal non-responsive and ineligible for award.

5. This TOR is being issued under CLIN 0001 and the Basis for Award is Lowest Price Technically Acceptable (LPTA). The following criteria will be evaluated for Technical Acceptability:

• The offeror provides a task order proposal:

o Demonstrating a thorough understanding of the project TO SOW to include the construction and design efforts required.

o Demonstrating a thorough understanding of all applicable UFCs, codes, regulations, AFIs, ETLs, etc. that will be applicable to the TO.

o Identifying and providing reasonable time estimates for all applicable tasks on its construction schedule.

o Identifying an appropriate mix of labor and materials in reasonable quantities on its construction cost estimate breakdown.

6. The magnitude of construction for this project is between $1,000,000 and $5,000,000

7. Questions or Request For Information (RFI) must be submitted by Friday, 15 December 2017 at 3:00 P.M. PST

8. This requirement is not subject to the minor construction threshold of $1,000,000.00.

9. LIQUIDATED DAMAGES: IAW the clause at FAR 52.211-12, of the MACC IDIQ, Liquidated Damages will be identified at the task order level on a case by case basis. Liquidated damages will be assessed for this project in the amount of $1,336.47 / Day.

10. Construction Wage General Decision applies: CA170023 13 October 2017, Modification 15.

11. For this project, Performance and Payment bonds are required in accordance with FAR 28.102- 2 and the clause at FAR 52.228-15.

12. Work Order Number: 41352

13. All questions shall be e-mailed to the Contract Specialist, Daniel Brock, at email daniel.brock.5@us.af.mil..

JEFFREY C. GRELCK

Contracting Officer

Attachments:

1. Statement of Work (SOW)

2. 35% Concept Design cc: Jordan Hampton, 30 CES/CENMP

File details come from the government source that posted it. Updated .