Section_J _Attachment_17 _C2SES_III_System_Sustainment_TO_0001_PWSs.doc

DOC document 779 KB Posted

Attached to
C2SESIII Award
Solicitation number
FA4600-16-R-0007
Issued by

About this file

C2SESIII RFP - Section J Attachment 17 System Sustainment TO0001 PWS

View the file

Other files

File Type Posted
C2SES_III_Q&A_III.pdf PDF
FA4600-16-R-0007_Amend_4.docx DOCX document
Section_J,_Attachment_16,_Small_Business_Subcontracting_Plan_Review_Checklist_Revised.xls XLS spreadsheet
FA4600-16-R-0007_Amend_3.docx DOCX document
FA4600-16-R-0007_Amend_3.docx DOCX document
C2SES_III_RFP_Q A_II.pdf PDF
FA4600-16-R-0007_Amend_2_C.docx DOCX document
FA4600-16-R-0007_Amend_2.docx DOCX document
Section_J _Attachment_18 _C2SES_III_System_Sustainment_TO_0001_CPIF_Plan_Amended.docx DOCX document
C2SES_III_RFP_Q A_I.pdf PDF
C2SES_III_Technical_Library_NDA.pdf PDF
C2SES_III_Technical_Library_Notification.pdf PDF
Section_J _Attachment_13 _CostPriceModel.xlsx XLSX spreadsheet
FA4600-16-R-0007_Amend_1.docx DOCX document
Section_J _Attachment_16 _Small_Business_Subcontracting_Plan_Review_Checklist.xls XLS spreadsheet
Section_J _Attachment_12 _Client_Authorization_Ltr.docx DOCX document
FA4600-16-R-0007.docx DOCX document
Section_J _Attachment_15 _Technical_Cross_Matrix.docx DOCX document
Section_J _Attachment_8 _PPQ_cover_ltr.docx DOCX document
Section_J _Attachment_3 _QASP_Attch_4_CTIP_Checklist.pdf PDF
Section_J _Attachment_5 _Contract_ID_Request.doc DOC document
Section_J _Attachment_16 _Small_Business_Subcontracting_Plan_Review_Checklist.xls XLS spreadsheet
Section_J _Attachment_3 _QASP_Attch_2_CCR.docx DOCX document
Section_J _Attachment_18 _C2SES_III_System_Sustainment_TO_0001_CPIF_Plan.docx DOCX document
Section_J _Attachment_6 _Insurance_Requirements_Certif.doc DOC document
Section_J _Attachment_2 _Integrated_Team_Process_User's_Guide.docx DOCX document
Section_J _Attachment_13 _CostPriceModel.xlsx XLSX spreadsheet
Section_J _Attachment_9 _PP_Questionnaire_-_24May.docx DOCX document
Section_J _Attachment_10 _PP_Tracking_Record.docx DOCX document
Section_J _Attachment_7 _PP_Information_Inf.docx DOCX document
Section_J _Attachment_4 _C2SES_III_CPIF_Plan.docx DOCX document
Section_J _Attachment_3 _QASP.doc DOC document
Section_J _Attachment_14 _OFCCP_clearance_request_documentation.doc DOC document
Section_J _Attachment_3 _QASP_Attch_3_CAR.docx DOCX document
Section_J _Attachment_11 _Subcontracting_Teaming_Partner_Consent_Ltr.docx DOCX document
Section_J _Attachment_1 _DD_254.doc DOC document
Section_J _Attachment_3 _QASP_Attch_1_PAR.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-XX-X-XXXX-XXXX

PERFORMANCE WORK STATEMENT

SHAPE \* MERGEFORMAT

C2 Software Sustainment

FA4600-XX-X-XXXX-0001

14-Oct-16 11.

Description of Service/General Information

11.1.

Description of Services

11.2.

Background

11.3.

Scope of Work

11.4.

Period of Performance

22.

Requirements

22.1.

Description of requirements

22.2.

Deliverables

22.2.1.

Documents/reports/studies/software

22.2.2.

Milestones/reviews

22.3.

Travel

22.4.

Mission Essential Service

33.

Government Furnished Property and Services

33.1.

Government Furnished Property

33.1.1.

Government-Furnished Materials/Equipment:

33.1.2.

Facilities

33.1.3.

Supplies

33.1.4.

Contractor Acquired Equipment

44.

Applicable Documents

44.1.

Government Documents

44.2.

Non-Government Documents

44.3.

Standards

44.4.

Contracting

55.

Acronyms

1. Description of Service/General Information

1.1. Description of Services

The purpose of this Command and Control System Engineering Support III (C2SES III) effort is to utilize contractor expertise to ensure the proper development, testing, delivery, installation, and sustainment of C2SES III capability. The office of primary functional responsibility for C2SES III activities, AFLCMC/HBCN, oversees all activity related to this Performance Work Statement (PWS).

1.2. Background

USSTRATCOM requires software maintenance and system engineering support to perform the specific tasks identified in this PWS to meet the mission requirements as identified in the Joint Strategic Capabilities Plan (JSCP), CJCSI 3110.04A (Nuclear Supplement to JSCP), Emergency Action Procedures (EAP)-CJCS Vols IR, VII, & VIII, the C2 Modernization ORD, the NPES ORD, and the USSTRATCOM UCP, none of which are releasable to the contractor.

1.3. Scope of Work

This task order establishes the performance for providing software and system engineering support for the following systems/applications included in C2SES III:

· Force Status and Readiness (FSR)

· Force Survivability, Analysis, and Management (FSAM)

· Global Information Grid (GIG)/ Area of Responsibility (AOR) Decision Support System (GADSS)

· Nuclear Planning and Execution System (NPES)

· NPES Strategic Data Loader (NSDL)

· Low to High (L2H)

The contractor shall provide the requirements outlined in this PWS in accordance with (IAW) the C2SESIII PWS. NPES and NSDL support will be managed as separate WBSs under a combine CLIN within the overall task effort. FSR and L2H support will be managed as separate WBSs under a combine CLIN within the overall task effort. FSAM support will be managed as a separate WBS project, under a separate CLIN, within the overall task effort. GADSS support will be managed as a separate WBS project, under a separate CLIN, within the overall task effort.

1.4. Period of Performance

The contractor shall coincide with the base contract period of performance.

2. Requirements

2.1. Description of requirements

The Contractor shall:

a) Coordinate software change requests, deficiency reports, and projects into scheduled releases in coordination with the Government.

b) Support up to two major releases per year and up to four minor releases per year for each application/system.

c) Support patches as required to address issues identified in the field or to support security findings.

d) Provide system engineering and support services for all software releases as required and for requirements identified by the Government.

e) Maintain utilities and tools required to support the current suite of software.

f) Perform corrective, adaptive, perfective, and preventive maintenance, and provide associated documentation, as required.

g) Modify/enhance software to ensure a strong security posture and address Government security findings and Information Assurance Vulnerability Alert (IAVA), Information Assurance Vulnerability Bulletins (IAVB), technical advisories and Cyber Vulnerability Assessments.

h) Provide to the Government all developed, modified, or converted source modules, processes, programs, scripts, operating instructions, databases, system files, documentation, test files and test conditions, and deficiency reports (DRs) for each software release.

i) Analyze and recommend solutions to change requests (CRs) for Government prioritization and approval.

j) Track, manage, and status all stakeholder requests, software discrepancies, and change requests in a Government provided repository (e.g., JIRA).

k) Oversee all engineering activities and ensure the use of common system engineering processes, software tools, techniques, and where practicable, services/languages/libraries/code.

l) Support the analysis and design of systems and applications and their integration into the overarching enterprise architecture.

m) Participate in periodic Government management board meetings (e.g., IPTs and Requirements Review Boards (RRBs)).

n) Assess impacts to C2 systems/applications within the scope of this PWS for communication system/device modernization plans, technical upgrade/refresh, and connectivity changes. Impact assessment includes analysis, determining courses-of-action, and recommend changes or necessary enhancements to sustain the services/capabilities from other communication systems/devices required for C2 systems/applications.

o) Maintain and update communication system drawings, interface control documents, data flows, and connectivity diagrams necessary to maintain and troubleshoot C2 systems/application interfaces to communication systems/devices.

p) Develop and implement Configuration Management (CM) processes and procedures to support the activities described in this PWS in accordance with the J864 C2 Mission Portfolio Configuration Management Plan.

q) Maintain and control the product baseline (all artifacts associated with a release – software, documentation, version descriptions, test results, etc.)

r) As required, develop and deliver technical reports to document the results and recommendations of quality assurance analyses/process improvement recommendations.

s) Ensure all system deliverables comply with applicable DOD, NIST, CNSSI, AF, and USSTRATCOM Information Assurance (IA) Policy.

t) Perform database and data administration for NPES installations in the software support and test environment

u) Manage and maintain system software support and test environments to support the provisioning, installation/configuration, operation, and maintenance of hardware and software and related infrastructure for system software support and test activities.

v) Perform database design and data administration for installations in the software support and test environments.

w) Implement a comprehensive test program and provide test engineering support to ensure proper validation and verification of user requirements for capabilities delivered.

2.2. Deliverables

2.2.1. Documents/reports/studies/software

a) The contractor shall deliver all software documentation IAW the C2SES III PWS paragraph 3.1 and 3.4.

b) The contractor shall deliver all system engineering and support services documentation IAW the C2SES III PWS paragraph 4.

2.2.2. Milestones/reviews

The contractor shall identify all milestones and reviews for all software releases in the IMS for Government approval.

2.3. Travel

Travel will be conducted on a cost reimbursable basis IAW the Joint Federal Travel Regulations. The contractor shall provide all associated costs for conducting the travel.

2.4. Mission Essential Service

None

2.5. Transition Period

The Contractor shall provide a plan outlining their approach to accomplish a smooth transition without degradation of service.

The contractor shall:

a) Provide a schedule covering the duration of the transition period. It shall identify risks and mitigation measures associated with the transition period.

b) Identify key personnel and activities, along with a plan for ensuring appropriately cleared personnel are available by the end of the transition period.

c) Outline how the Contractor will communicate with USSTRATCOM, the offeror’s teaming partners/sub-contractors, and others working with the C2 programs.

3. Government Furnished Property and Services

3.1. Government Furnished Property

3.1.1. Government-Furnished Materials/Equipment:

No unique requirements.

3.1.2. Facilities

All work will be conducted as USSTRATCOM.

3.1.3. Supplies

None.

3.1.4. Contractor Acquired Equipment

None.

4. Applicable Documents The following documents shall form a part of this specification to the extent specified herein. In the event of conflict between the documents referenced and the contents of this specification, the contents of this specification shall be considered a superseding requirement.

4.1. Government Documents

Performance Work Statement for the USSTRATCOM Command and Control Software Engineering and Support III.

4.2. Non-Government Documents

No special guidance.

4.3. Standards

No special guidance.

4.4. Contracting

No special guidance.

5. Acronyms

CR

Change Requests

CM

Configuration Management

DR

Deficiency Reports

FSAM

Force Survivability, Analysis, and Management

FSR

Force Status and Readiness

GADSS

Global Information Grid (GIG)/ Area of Responsibility (AOR) Decision Support System

IA

Information Assurance

IAVA

Information Assurance Vulnerability Alert

IAVB

Information Assurance Vulnerability Bulletins

IAW

In Accordance With

L2H Low to High

TO

Task Order

NPES

Nuclear Planning and Execution System

NSDL

NPES Strategic Data Loader

PMO

Program Management Office

PWS

Performance Work Statement

RRB

Requirements Review Boards

USSTRATCOM

United States Strategic Command

Section J, Attachment 17

Task Order 0001 PWS

PAGE

File details come from the government source that posted it. Updated .