Attachment 3.docx

DOCX document 19 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 3 Statement of Objectives

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
Amendment8.doc DOC document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 05.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 13.dwf DWF file
amendment4.doc DOC document
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Question and Answers.docx DOCX document
sitevisitattendancesheet.pdf PDF
amendedsolicitation2.doc DOC document
final 23 05 93 Testing Adjusting and Balancing.pdf PDF
Sheet 10-10.pdf PDF
Performance Period.pdf PDF
final 26 05 33 Raceways.pdf PDF
final 26 05 19 Wires and Cables.pdf PDF
Sheet 2-02.pdf PDF
Final 09 91 00 Painting.pdf PDF
Sheet 3-Sheet 3.pdf PDF
final 07 92 00 Joint Sealers.pdf PDF
Final 05 50 00 Metal Fabrications.pdf PDF
Sheet 11-11.pdf PDF
final 26 05 53 Electrical Identification.pdf PDF
Final 23 38 13 Kitchen Ventilator Hood Systems.pdf PDF
final 23 07 00 HVAC Insulation.pdf PDF
final 23 00 00 General Provisions.pdf PDF
Final 26 05 26 Grounding.pdf PDF
final 23 01 30 HVAC Air-Distribution Cleaning System.pdf PDF
Sheet 19-Sheet 19.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
amendmentsolicitation.doc DOC document
Final 26 24 16 Panelboards.pdf PDF
final 07 84 13 Firestopping.pdf PDF
Final 09 51 00 Acoustical Ceilings.pdf PDF
Sheet 14-14.pdf PDF
Sheet 1-01.pdf PDF
Sheet 18-Sheet 18.pdf PDF
final 26 28 13 Fuses.pdf PDF
Final 09 21 16 Gypsum Board Assemblies.pdf PDF
Sheet 4-Sheet 4.pdf PDF
final 26 05 29 Supporting Devices.pdf PDF
Solicitation.doc DOC document
SITE PLAN.dwg DWG drawing
Site Visit Sign In Sheet.pdf PDF
Preconstruction Conference Attachment 4.doc DOC document
Attachment 1.docx DOCX document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #3

Statement of Objectives

Date: 11 May 2010 Project #: Seed 10-0073 Project Title: Rpr Wing XP

Provide a proposal to turn Wing XP area into Scif and VTC.

Phase I:

a. Detailed Statement of Work

b. List of UPB Line items (minus costs & quantities) and list of Non pre-priced items.

c. Sketch of layout.

Phase II:

a. Detailed Cost Estimate

b. Period of Performance

Objectives:

1. Repair and paint wall above suspended ceiling in all perimeter rooms to meet STC 45 requirements. Tape, mud, paint, and foam where required.

2. Remove all abandoned services and/or penetrations above ceiling in all spaces.

3. Repair all roof deck insulation above suspended ceiling.

4. Any conduit embedded in gypsum wall board shall be removed and surface mounted. Repair walls as required.

5. Man bars, canvas sleeves, and sound baffles shall be installed in penetrating duct work in 104, 105, and 106.

6. Install inspection ports as required.

7. The existing inspection port outside of room 104 in exterior main hallway to be secured and sealed.

8. Remove existing main door and replace with 4’ X 7’ SCT 45 door. Reuse existing metal frame. Door to have closer and “unican” lock. Existing “XO” lock to be reinstalled. Install power for ADT above door along with two penetrations for communications.

9. Wrap door opening in room 102 in oak when exposed concrete exists. Stain and seal as required.

10. All wall surfaces, ceilings, and floors to be protected during project to reduce costs.

11. Room 106 to be turned in STC 50 VTC with the following requirements.

a. All perimeter walls to meet STC 50 rating.

b. Remove all existing door in space removed.

c. (1) STC 50 3’ X 7’ oak door to be main point of entry all other openings shall be infilled to meet STC 50.

d. Door to have closer and standard door hardware.

e. Remove portion of wall between 105/106 in order to construct a new communication closet approximately 14’ X 5’ to support room 106 VTC.

f. Install (2) receptacles in communications room for racks by others.

g. Create vestibule inside STC 50 door to access comm. Room and VTC. Both doors to be Oak.

h. Build a false wall along south wall with hidden conduits for running communication equipment for VTC. Wall to be painted with white projection acceptable paint.

i. Relocate sprinkler heads as required.

j. Install stall new suspended ceiling with VTC acceptable lighting. Install dimmable can lighting around perimeter of room. Dimmable task lighting on table. Dimmable 2X2 VTC lighting. Dimmer controls for all lighting. Pwer as required to support equipment for VTC.

k. Skim coat and paint all remaining walls in 106.

12. All work will be IAW DCID 6/9 or applicable DNI SCIF construction guidance.

General Requirements:

Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the SABER Project Manager and the Contracting Officer. The project is to be designed in accordance with the Base Design Guidelines. Work shall be completed in a neat, substantial and competent manner.

· Item 1: All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, NFPA 72 and any other applicable code requirement.

· Item 2: Maintain work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.

· Item 3: In the event of a conflict between the drawings and the Statement of Work (SOW), the SOW will take precedence.

Kelly J. Korenoski, Civ, USAF SABER Office

File details come from the government source that posted it. Updated .