final 26 05 29 Supporting Devices.pdf

PDF 80 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

-

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
Amendment8.doc DOC document
SIGN IN SHEET Oct 15 2010.doc DOC document
Question and Answers 15 Oct 2010.docx DOCX document
Seed project Honor guard room.pdf PDF
Amendment7.doc DOC document
Attachment 3 Convert Honor Guard to VTC.doc DOC document
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Sheet 09.dwf DWF file
Sheet 17.dwf DWF file
Sheet 15.dwf DWF file
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Sheet 12.dwf DWF file
Sheet 02.dwf DWF file
Sheet 14.dwf DWF file
Sheet 03.dwf DWF file
sitevisitattendancesheet.pdf PDF
Final 23 05 00 Basic HVAC Materials and Methods.pdf PDF
Sheet 9-9.pdf PDF
Sheet 5-Sheet 5.pdf PDF
Sheet 12-12.pdf PDF
Section 1B AF66 Master Oct 2008.xls XLS spreadsheet
Sheet 16-16.pdf PDF
Sheet 11-11.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
amendmentsolicitation.doc DOC document
Final 26 24 16 Panelboards.pdf PDF
final 07 84 13 Firestopping.pdf PDF
Final 09 51 00 Acoustical Ceilings.pdf PDF
Sheet 14-14.pdf PDF
Sheet 1-01.pdf PDF
Sheet 18-Sheet 18.pdf PDF
final 26 28 13 Fuses.pdf PDF
Final 09 21 16 Gypsum Board Assemblies.pdf PDF
Sheet 4-Sheet 4.pdf PDF
Sheet 17-17.pdf PDF
final 26 51 13 Lighting Fixtures.pdf PDF
final 26 27 26 Wiring Devices.pdf PDF
final 26 05 00 General Electrical.pdf PDF
Solicitation.doc DOC document
Ntitle.dwg DWG drawing
Rpr Wing XP.dwg DWG drawing
Attachment 5.docx DOCX document
Attachment 2.docx DOCX document
Attachment 6.docx DOCX document
Solicitation.doc DOC document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT AIR FORCE BASE

(092036) 26 05 29-1 (Repair AHU O-Club, B462)

2010 by FEI

SECTION 26 05 29

SUPPORTING DEVICES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes secure support from the building structure for electrical items by means of hangers, supports, anchors, sleeves, inserts, seals and associated fastenings.

1. Refer to other Division 26 Sections for additional specific support requirements that may be applicable to specific items.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by the following:

1. Slotted Metal Angle and U-Channel Systems:

a. Allied Tube & Conduit.

b. American Electric.

c. B-Line Systems, Inc.

d. Cinch Clamp Co., Inc.

e. GS Metals Corp.

f. Haydon Corp.

g. Kin-Line, Inc.

h. Unistrut Diversified Products.

2. Conduit Sealing Bushings:

a. Bridgeport Fittings, Inc.

b. Cooper Industries, Inc.

c. Elliott Electric Mfg. Corp.

d. GS Metals Corp.

e. Killark Electric Mfg. Co.

f. Madison Equipment Co.

g. L.E. Mason Co.

h. O-Z/Gedney.

i. Producto Electric Corp.

j. Raco, Inc.

k. Red Seal Electric Corp.

l. Spring City Electrical Mfg. Co.

m. Thomas & Betts Corp.

2.2 COATINGS

A. Coating: Supports, support hardware, and fasteners shall be protected with zinc coating or with treatment of equivalent corrosion resistance using approved alternative treatment, finish or inherent material characteristic.

(092036) 26 05 29-2 (Repair AHU O-Club, B462)

2.3 MANUFACTURED SUPPORTING DEVICES

A. Raceway Supports: Clevis hangers, riser clamps, conduit straps, threaded C-clamps with retainers, ceiling trapeze hangers, and wall brackets.

B. Fasteners: Types, materials and construction features as follows:

1. Expansion Anchors: Carbon steel wedge or sleeve type.

2. Toggle Bolts: All steel springhead type.

3. Powder-Driven Threaded Studs: Not Allowed.

C. Conduit Sealing Bushings: Factory-fabricated watertight conduit sealing bushing assemblies suitable for sealing around conduit or tubing passing through concrete floors and walls. Construct seals with steel sleeve, malleable iron body, neoprene sealing grommets or rings, metal pressure rings, pressure clamps and cap screws.

D. U-Channel Systems: 16-gage steel channels, with 9/16-inch diameter holes, at a minimum of 8-inches on center, in top surface. Provide fittings and accessories that mate and match the U-channel and are of the same manufacturer.

2.4 FABRICATED SUPPORTING DEVICES

A. General: Shop- or field-fabricated supports or manufactured supports assembled from U-channel components.

B. Steel Brackets: Fabricated of angles, channels and other standard structural shapes. Connect with welds and machine bolts to form rigid supports.

C. Pipe Sleeves: Provide pipe sleeves of one (1) of the following:

1. Sheet Metal: Fabricate from galvanized sheet metal; round tube closed with snaplock joint, welded spiral seams or welded longitudinal joint. Fabricate sleeves from the following gage metal for sleeve diameter noted:

a. 3-inches and smaller: 20-gage.

b. 4-inch to 6-inches: 16-gage.

c. Over 6-inches: 14-gage.

2. Steel Pipe: Fabricate from Schedule 40 galvanized steel pipe.

3. Plastic Pipe: Fabricate from Schedule 80 PVC plastic pipe.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install supporting devices to fasten electrical components securely and permanently in accordance with

NEC requirements.

B. Coordinate with the building structural system and with other electrical installation.

C. Raceway Supports: Comply with the NEC and the following requirements:

1. Conform to manufacturer's recommendations for selection and installation of supports.

(092036) 26 05 29-3 (Repair AHU O-Club, B462)

2. Strength of each support shall be adequate to carry present and future load multiplied by a safety factor of at least four (4). Where this determination results in a safety allowance of less than 200 lbs, provide additional strength until there is a minimum of 200 lbs safety allowance in the strength of each support.

3. Install individual and multiple (trapeze) raceway hangers and riser clamps as necessary to support raceways. Provide U-bolts, clamps, attachments, and other hardware necessary for hanger assembly and for securing hanger rods and conduits.

4. Support parallel runs of horizontal raceways together on trapeze-type hangers.

5. Attach raceways directly to building structure (structural concrete, structural wood, or steel red iron), or to unistrut trapeze supported directly from building structure with 3/8-inch minimum threaded rods. Wire type supports and click-type hangers shall not be allowed. Do not fasten to roof decking.

6. Support exposed and concealed raceway within 1-foot of an unsupported box and access fittings. In horizontal runs, support at the box and access fittings may be omitted where box or access fittings are independently supported and raceway terminals are not made with chase nipples or threadless box connectors.

7. In vertical runs, arrange support so that load produced by the weight of the raceway and the enclosed conductors is carried entirely by the conduit supports with no weight load on raceway terminals.

D. Miscellaneous Supports: Support miscellaneous electrical components as required to produce the same structural safety factors as specified for raceway supports. Install metal channel racks for mounting cabinets, control enclosures, contactors, VFD’s, pull boxes, junction boxes, transformers and other devices.

E. Support sheet metal boxes directly from the building structure or by bar hangers.

F. Sleeves: Install in concrete slabs and walls and all other firerated floors and walls for raceways and cable installations. For sleeves through fire rated-wall or floor construction, apply UL Listed firestopping sealant in gaps between sleeves and enclosed conduits and cables.

G. Conduit Seals: Install seals for conduit penetrations of slabs on grade and exterior walls below grade and where indicated. Tighten sleeve seal screws until sealing grommets have expanded to form watertight seal.

H. Fastening: Unless otherwise indicated, fasten electrical items and their supporting hardware securely to the building structure, including but not limited to conduits, raceways, cables, cable trays, cabinets, transformers, boxes, and control components in accordance with the following:

1. Fasten by means of wood screws or screw-type nails on wood, toggle bolts on hollow masonry units, concrete inserts or expansion bolts on concrete or solid masonry, and machine screws, welded threaded studs, or spring-tension clamps on steel. Threaded studs driven by a powder charge shall not be allowed. Do not weld conduit, pipe straps or items other than threaded studs to steel structures. In partitions of light steel construction, use sheet metal screws.

2. Holes cut to depth of more than 1-1/2-inch in reinforced concrete beams or to depth of more than 3/4-inch in concrete shall not cut the main reinforcing bars. Fill holes that are not used.

(092036) 26 05 29-4 (Repair AHU O-Club, B462)

3. Ensure that the load applied to any fastener does not exceed 25% of the proof test load. Use vibration- and shock-resistant fasteners for attachments to concrete slabs.

END OF SECTION