Final 23 38 13 Kitchen Ventilator Hood Systems.pdf

PDF 34 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

-

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
SIGN IN SHEET Oct 15 2010.doc DOC document
Seed project Honor guard room.pdf PDF
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 09.dwf DWF file
Sheet 17.dwf DWF file
Sheet 15.dwf DWF file
Sheet 05.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 13.dwf DWF file
amendment4.doc DOC document
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Question and Answers.docx DOCX document
Final 23 05 00 Basic HVAC Materials and Methods.pdf PDF
Sheet 9-9.pdf PDF
Sheet 5-Sheet 5.pdf PDF
Sheet 12-12.pdf PDF
Section 1B AF66 Master Oct 2008.xls XLS spreadsheet
Sheet 16-16.pdf PDF
Sheet 11-11.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 23 05 93 Testing Adjusting and Balancing.pdf PDF
Sheet 10-10.pdf PDF
Performance Period.pdf PDF
final 26 05 33 Raceways.pdf PDF
final 26 05 19 Wires and Cables.pdf PDF
Sheet 2-02.pdf PDF
Final 09 91 00 Painting.pdf PDF
Sheet 3-Sheet 3.pdf PDF
final 07 92 00 Joint Sealers.pdf PDF
Final 05 50 00 Metal Fabrications.pdf PDF
Sheet 11-11.pdf PDF
final 26 05 53 Electrical Identification.pdf PDF
final 23 07 00 HVAC Insulation.pdf PDF
final 23 00 00 General Provisions.pdf PDF
Final 26 05 26 Grounding.pdf PDF
Ntitle.dwg DWG drawing
Rpr Wing XP.dwg DWG drawing
SITE PLAN.dwg DWG drawing
Site Visit Sign In Sheet.pdf PDF
Attachment 5.docx DOCX document
Attachment 2.docx DOCX document
Preconstruction Conference Attachment 4.doc DOC document
Attachment 1.docx DOCX document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT AIR FORCE BASE

(092036) 23 38 13-1 (Repair AHU O-Club, B462)

2010 by FEI

SECTION 23 38 13

KITCHEN VENTILATOR HOOD SYSTEMS

PART 1 - GENERAL

1.1 WORK INCLUDED

A. Extent of kitchen ventilator hood and make-up system work required by this section is indicated on drawings and schedules and by requirements of this section.

B. Types of ventilators and make-up system required for Project include the following:

1. Kitchen Hood and Make Up Air Unit Control System.

C. Provide the following electrical work as work of this section, in compliance with electrical specifications.

1. Control and interlock wiring between operating controls, indicating devices and ventilators.

1.2 QUALITY ASSURANCE

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of kitchen ventilators and make-up air system, of types and sizes required, whose products have been in satisfactory use in similar service for not less than three (3) years.

B. Codes and Standards:

1. NSF Compliance: Provide ventilators, which have been tested and rated in accordance with

NSF Standards and bear NSF Certified Ratings Seal.

2. UL Compliance: Provide power ventilators and grease filters, which are listed by UL and have

UL Label affixed.

3. NFPA 96 Compliance: Provide ventilators and exhaust system complying with NFPA 96

Standards.

1.3 SUBMITTALS

A. Product Data: Submit manufacturer's technical data for ventilators, including specifications, capacity ratings, dimensions, weights, materials, accessories furnished and installation instructions.

B. Shop Drawings: Submit assembly-type shop drawings showing unit dimensions, construction details, methods of assembly of components and field connection details.

C. Wiring Diagrams: Submit manufacturer's electrical requirements for power supply wiring to power ventilators. Submit manufacturer's ladder-type wiring diagrams for interlock and control wiring. Clearly differentiate between portions of wiring that are factory-installed and portions to be field-installed.

D. Maintenance Data: Submit maintenance data and parts list for each ventilator, accessory and control.

Include this data, product data, shop drawings and wiring diagrams in Maintenance Manual.

PART 2 - PRODUCTS

(092036) 23 38 13-2 (Repair AHU O-Club, B462)

2.1 ACCEPTABLE MANUFACTURERS

A. Manufacturer: Subject to compliance with requirements, provide products of one (1) of the following:

1. Melink Intelli-Hood Controls.

2. Approved Equal.

2.2 KITCHEN HOOD AND MAKE UP AIR UNIT CONTROLS

A. General: Control system shall be pre-engineered system to automatically control the speed of the exhaust and make-up fan to ensure optimal hood performance. The system shall include the following components:

1. I/O Processor, with 0-10VDC or 4-20mA signal out for VFDs.

2. Keypad

3. Temperature Sensors

4. Optic Sensor with Air Purge Units

5. Cables.

B. Sequence of Operation: See drawings

PART 3 - EXECUTION

3.1 EXAMINATION

A. General: Examine areas and conditions under which control system is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.

3.2 INSTALLATION KITCHEN HOOD AND MAKE-UP CONTROL SYSTEM

A. General: Except as otherwise indicated or specified, install in accordance with manufacturer's installation instructions and recognized industry practices to insure that ventilators serve their intended function.

B. Coordinate work with work of roofing, walls and ceilings, as necessary for proper interfacing.

C. Ductwork: Connect ducts to ventilators in accordance with manufacturer's installation instructions.

Exhaust ductwork shall be 18-gage stainless steel where exposed and 16-gage welded black steel where concealed as required by NFPA 96.

D. Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to be factory mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical Installer.

1. Verify that electrical wiring installation is in accordance with manufacturer's submittal and installation requirements of electrical specifications. Verify proper rotation direction of fan wheels. Do not proceed with equipment startup until wiring installation is acceptable to equipment installer.

2. Install all wiring in conduit. See Specification Section 26.

3. Keypad shall be mounted in location noted on drawings.

4. I/O Processors shall be mounted near the Keypad.

(092036) 23 38 13-3 (Repair AHU O-Club, B462)

5. Temperature Sensors shall be mounted in each exhaust collar.

6. Optic Sensors shall be mounted inside the ends of each Type 1 hood with air purge units mounted on top.

7. Variable Frequency Drives shall be installed for exhaust and make-up fans.

E. Interlocks: Provide all wiring and controls to automatically activate the hood exhaust fan whenever cooking operations occur. Provide an interlock with the cooking appliances, including heat sensors or other approved methods. Provide link to fire control panel to shutdown the make-up air unit per

NFPA.

3.3 FIELD QUALITY CONTROL

A. Testing: After installation of controls has been completed, test the ventilator, and make-up systems to demonstrate proper operation of units at performance requirements specified. When possible, field correct malfunctioning units, then retest to demonstrate compliance. Replace units which cannot be satisfactorily corrected.

END OF SECTION

File details come from the government source that posted it. Updated .