verif.pdf
PDF 14 KB Posted
- Attached to
- Airfield & Heavy Duty Paving IDC Federal contract opportunity
- Solicitation number
- FA4497-11-R-0007
About this file
Mandatory Verification Schedule - Attachment 5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ammend 1.pdf | ||
| FA4497-11-R-0007 Amendment 5.pdf | ||
| Questions.pdf | ||
| FA4497-11-R-0007 Amedment 4.pdf | ||
| FA4497-11-R-0007 Amendment 3.doc | DOC document | |
| SPECIFICATIONS TOC.pdf | ||
| FA4497-11-R-0007 Conformed.pdf | ||
| Pre-Proposal Minutes 2.pdf | ||
| Pre-Proposal Minutes 1.pdf | ||
| FA4497-11-R-0007 RFP Ammendment 2.pdf | ||
| Sample Questionnaire Ltr.pdf | ||
| FA4497-11-R-0007 RFP Ammendment.pdf | ||
| FA4497-11-R-0007 RFP.pdf | ||
| precip days.pdf | ||
| SURVEY.pdf | ||
| Climatic Data.pdf | ||
| WD - DE00014.pdf | ||
| Survey Cover Letter.pdf | ||
| FA4497-11-R-0007 Solicitation.pdf | ||
| perf.pdf | ||
| GFP.pdf | ||
| Specifications.pdf | ||
| submit.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield & Heavy Duty Paving IDC Solicitation Number: FA4497-11-R-0007 Project Number: 111099 Contract Number:
13 April 2011 Attachment 5
MANDATORY VERIFICATION SCHEDULE
PROJECT NUMBER: 111099
The work listed herein requires mandatory verification by the Government Inspector before any follow-on work is allowed to start. The Contractor must provide evidence of verification by the individual designated as responsible for the Contractor's inspection program, that the work to be verified by the Government complies with these specifications and drawings. The Contractor shall notify the Government Inspector that the work is ready for verification at least four hours prior to the desired verification date unless indicated otherwise below.
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION
COMPLETED
Cold Milling Of Pavements 02115/3.2 24 hours
Select Material 02232/3.9,3.10 24 hours Sub-Base Course
Graded Aggregate 02233/3.8,3.10,3.11 24 hours Base Course
Rigid Concrete Pavement 02513/1.5.2 48 hours Surface for Airfields
Cracking and 02550/3.2 24 hours Seating of Nonreinforced Portland Cement Concrete
Bituminous Pavement 02557/1.3.4 48 hours For Airfields
Bituminous Tack Coat 02558/3.5 24 hours
Fuel-Resistant Sealing 02584/1.7 48 hours
Coal-Tar 02585/1.6,1.13 48 hours Sealer/Rejuvenator
Field Molded Sealant 02592/1.9,3.5 48 hours
Airfield & Heavy Duty Paving IDC Solicitation Number: FA4497-11-R-0007 Project Number: 111099 Contract Number:
13 April 2011 Attachment 5
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION
COMPLETED
Preformed Elastomeric 02593/1.6,3.5 48 hours Joint Seals
Sealing of Cracks in 02594/3.4 48 hours Bituminous Pavements
Pavement Markings 02600/1.4 48 hours
File details come from the government source that posted it. Updated .