verif.pdf

PDF 14 KB Posted

Attached to
Airfield & Heavy Duty Paving IDC Federal contract opportunity
Solicitation number
FA4497-11-R-0007
Issued by
Department of the Air Force Air Mobility Command

About this file

Mandatory Verification Schedule - Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to Airfield & Heavy Duty Paving IDC, newest first.
File Type Posted
Ammend 1.pdf PDF
FA4497-11-R-0007 Amendment 5.pdf PDF
Questions.pdf PDF
FA4497-11-R-0007 Amedment 4.pdf PDF
FA4497-11-R-0007 Amendment 3.doc DOC document
SPECIFICATIONS TOC.pdf PDF
FA4497-11-R-0007 Conformed.pdf PDF
Pre-Proposal Minutes 2.pdf PDF
Pre-Proposal Minutes 1.pdf PDF
FA4497-11-R-0007 RFP Ammendment 2.pdf PDF
Sample Questionnaire Ltr.pdf PDF
FA4497-11-R-0007 RFP Ammendment.pdf PDF
FA4497-11-R-0007 RFP.pdf PDF
precip days.pdf PDF
SURVEY.pdf PDF
Climatic Data.pdf PDF
WD - DE00014.pdf PDF
Survey Cover Letter.pdf PDF
FA4497-11-R-0007 Solicitation.pdf PDF
perf.pdf PDF
GFP.pdf PDF
Specifications.pdf PDF
submit.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Airfield & Heavy Duty Paving IDC Solicitation Number: FA4497-11-R-0007 Project Number: 111099 Contract Number:

13 April 2011 Attachment 5

MANDATORY VERIFICATION SCHEDULE

PROJECT NUMBER: 111099

The work listed herein requires mandatory verification by the Government Inspector before any follow-on work is allowed to start. The Contractor must provide evidence of verification by the individual designated as responsible for the Contractor's inspection program, that the work to be verified by the Government complies with these specifications and drawings. The Contractor shall notify the Government Inspector that the work is ready for verification at least four hours prior to the desired verification date unless indicated otherwise below.

WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION

DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION

COMPLETED

Cold Milling Of Pavements 02115/3.2 24 hours

Select Material 02232/3.9,3.10 24 hours Sub-Base Course

Graded Aggregate 02233/3.8,3.10,3.11 24 hours Base Course

Rigid Concrete Pavement 02513/1.5.2 48 hours Surface for Airfields

Cracking and 02550/3.2 24 hours Seating of Nonreinforced Portland Cement Concrete

Bituminous Pavement 02557/1.3.4 48 hours For Airfields

Bituminous Tack Coat 02558/3.5 24 hours

Fuel-Resistant Sealing 02584/1.7 48 hours

Coal-Tar 02585/1.6,1.13 48 hours Sealer/Rejuvenator

Field Molded Sealant 02592/1.9,3.5 48 hours

Airfield & Heavy Duty Paving IDC Solicitation Number: FA4497-11-R-0007 Project Number: 111099 Contract Number:

13 April 2011 Attachment 5

WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION

DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION

COMPLETED

Preformed Elastomeric 02593/1.6,3.5 48 hours Joint Seals

Sealing of Cracks in 02594/3.4 48 hours Bituminous Pavements

Pavement Markings 02600/1.4 48 hours

File details come from the government source that posted it. Updated .