This is the addendum for the specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4497-11-R-0007 Amendment 5.pdf | ||
| Questions.pdf | ||
| FA4497-11-R-0007 Amedment 4.pdf | ||
| FA4497-11-R-0007 Amendment 3.doc | DOC document | |
| SPECIFICATIONS TOC.pdf | ||
| FA4497-11-R-0007 Conformed.pdf | ||
| Pre-Proposal Minutes 2.pdf | ||
| Pre-Proposal Minutes 1.pdf | ||
| FA4497-11-R-0007 RFP Ammendment 2.pdf | ||
| Sample Questionnaire Ltr.pdf | ||
| FA4497-11-R-0007 RFP Ammendment.pdf | ||
| FA4497-11-R-0007 RFP.pdf | ||
| precip days.pdf | ||
| verif.pdf | ||
| perf.pdf | ||
| GFP.pdf | ||
| Specifications.pdf | ||
| submit.pdf | ||
| SURVEY.pdf | ||
| Climatic Data.pdf | ||
| WD - DE00014.pdf | ||
| Survey Cover Letter.pdf | ||
| FA4497-11-R-0007 Solicitation.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield & Heavy Duty Paving IDC Solicitation Number: FA4497-11-R-0007 Project Number: 111099 Contract Number:
ADDENDUM NO. 1
TO
SPECIFICATIONS FOR
PROJECT 111099
AIRFIELD & HEAVY DUTY PAVEMENTS IDC
AT
DOVER AIR FORCE BASE, DELAWARE
26 Jun 2011
The following changes are made to the above referenced specifications:
1. Delete in their entirety the following sections:
01000 01020A 01001 01002
2. Replace with the following:
01000 01001 01002 01003
Project Number: 111099 Contract Number:
01000 - 1
SECTION 01000
DOVER AFB GENERAL REQUIREMENTS
1.1 SUMMARY OF WORK: Furnish all plant, equipment, supervision, labor, supplies, services, and materials required to accomplish the work indicated in these specifications, the related drawings and as otherwise set forth in the contract.
1.2 SUMMARY OF PROJECT: The project consists essentially of, but is not limited to, the construction of airfield and heavy duty asphalt and concrete pavements, including demolition and removal of same, and other miscellaneous appurtenances. Heavy duty pavements can be located on the airfield or off the airfield on the base side where conditions warrant. Examples of heavy duty pavement activities include, but are not limited to, large piping projects, crack and seating of concrete, large paving projects and base-wide striping projects.
1.3 WORK SCHEDULE:
1.3.1 Work shall be performed between 7:30 A.M. and 4:30 P.M. daily, Monday through Friday, excluding federal legal holidays as outlined by Public Law Number 98-144 (or days not worked on Dover Air Force Base due to the observance of such holidays). Unless otherwise specifically authorized herein or in writing by the Contracting Officer, the scheduling of work for times other than as set forth above, is not permitted.
1.3.2 Power outages, limited utility interruptions for hookups, and street/parking lot closures will be permitted in accordance with a previously arranged schedule. The Contractor is responsible for notifying and coordinating all outages and closures with the Base Civil Engineer Project Management Section at least two weeks in advance of the intended outage.
1.4 WORK CLEARANCE REQUEST FOR EARTHWORK:
1.4.1 Approval of an AF Form 103, Work Clearance Request, is required to be obtained from the Government prior to initiating any ground disturbing activity on the site. The contractor shall follow the procedure as indicated below.
1.4.1.1 The contractor shall submit to the Government Inspector the Work Clearance Request no earlier than 10 and no later than 7 working days prior to any proposed ground disturbing activity. The contractor shall obtain from the Government Inspector a blank copy of the Work Clearance Request and shall complete the form with the necessary information.
1.4.1.2 The contractor shall contact Miss Utility and obtain a Miss Utility Ticket Number and include that information on the submitted form. The Government Inspector will provide the contractor with the Miss Utility grid map page number, grid coordinates, and nearest intersection information.
NOTE: It is the responsibility of the contractor to coordinate with, and obtain clearance from, Miss Utility (phone 1-800-282-8555) for utility services not owned by Dover AFB (i.e. Chesapeake Utility’s steel gas lines, Verizon communication lines, Comcast Cablevision lines, and Kent County sanitary sewer lines). Call Miss Utility prior to submitting the request to the Government Inspector. Adequately describe the exact location and type of excavation work involved to Miss Utility in lieu of, perhaps, just the job title. The Government process makes this communication solely the responsibility of the contractor.
Project Number: 111099 Contract Number:
01000 - 2
1.4.1.3 The contractor shall submit the completed form to the Government Inspector for processing within Base Civil Engineering for Government owned utilities. The contractor shall return the completed form along with an 8.5” x 11” site map showing limits of proposed excavation and the surrounding existing facilities to the Government Inspector. The Government Inspector will notify the contractor when the Work Clearance Request has been approved and is ready to be picked-up.
1.4.1.4 The contractor shall mark proposed excavation locations in the field in white paint prior to submission of the Work Clearance Request. Paint markings must be within 18 inches of the proposed excavation. If the location of excavation changes the Work Clearance Request process for the new locations must be reaccomplished and reapproved. The contractor is responsible for protecting the utility markings made by the Government and/or Miss Utility. If the utility markings disappear or become unreadable, all work will stop until all remarking has been accomplished. Remarking may require collection of remarking cost to be paid by the contractor. A new Work Clearance Request must be processed to obtain new markings. The contracror may wish to submit Work Clearance Requests incrementally depending upon the extent of site work in order to avoid having to resubmit or maintain multiple markings. Dover Air Force Base issued Work Clearance Requests will expire 30 days after approval. Contractor shall comply with all Miss Utility permit renewal requirements.
1.4.1.5 In the event any damage occurs to a utility, notify the Government Inspector immediately.
1.5 WORK CONDITIONS: The work to be performed under this project will be on an occupied facility.
1.6 QUALITY CONTROL:
1.6.1 In addition to the requirements specified in the FAR clause "Inspection of Construction", the Contractor shall designate in writing, an individual responsible for managing the Contractor's inspection program. Such designation shall be made to the Contracting Officer prior to commencement of work on the job site.
1.6.2 The Government will require that work progress in stages when verification of the quantity, adequacy and/or accuracy of underlying work is necessary before follow-on work is allowed to start.
When required by these specifications, such verifications shall be mandatory, and an allowance for these verifications shall be made in the Contractor's Contract Progress Schedule. The Contractor shall provide notification that work is ready for verification in accordance with the requirements outlined on the Mandatory Verification Schedule. Required mandatory verifications are as listed by the schedule.
1.7 CONTRACTOR COORDINATION AND COMMUNICATION: : The Contractor shall provide at least a 24 hour advance notification to establish when on-site work will start initially, and prior to restarting on-site work following any discontinuances lasting longer than five normal workdays.
Notification may be provided by phone, in person, or in writing, and shall be given directly to the designated Government Inspector, Building 600 on Dover Air Force Base. The mailing address is 436 CES/CEPM, 600 Chevron Ave, Dover AFB, DE, 19902-5600.The contractor shall keep the Government abreast of all work activities on a routine basis. The Contractor shall coordinate the work of subcontractors and shall ensure the coordination of the work between the various trades. In many instances the contract drawings indicate only the general location and arrangement of equipment, fixtures, piping, conduit, or outlets and may not in all cases show, identify or detail all materials or components that are necessary, usual and customary for proper installation, connection or attachment.
The Contractor shall study, examine and evaluate the contract drawings to establish the work, coordination, or materials required and necessary to provide a product complete in the usual and
Project Number: 111099 Contract Number:
01000 - 3 customary manner, and shall provide for all such requirements as though expressly detailed herein or on the drawings.
1.7.1. On a daily basis, the contractor shall call or email (preferred) the designated inspector of all work in-progress. Likewise the contractor will notify the inspector when there is no work in-progress (i.e. due to adverse weather conditions).
1.7.2. On a weekly basis, the contractor shall provide (email required) a written status report on all open Work Requests (projects) in the format attached to the end of this section, or in a format acceptable to the Contracting Officer. This report shall include projected activities for the following week, including planned project start-ups or Final Inspections. The contractor will continue to report the status of a project until Final Inspection, and all punch list items are completed.
1.7.3. Project Start-Up. In addition to notifying the Inspector, the contractor shall notify the facility manager of planned start-ups and potential disruption of daily operation, and keep them abreast of all activities which may affect them (i.e. blocked parking lot or driveway, etc.).
1.7.4. Basis of Payment. For the purpose of verifying quantities, the contractor shall obtain and maintain in his possession supplier invoices and delivery tickets for all material used on the project, and provide the Government copies upon request.
1.7.5. Partial Payments. The contractor may submit invoices for partial payments during the course of work on larger projects. All invoices must be coordinated with, and agreed upon by the Inspector, prior to submission. In the event of a dispute, a meeting will be held with the Contracting Officer for resolution.
1.7.5.1 When directed by the Contracting Officer, the contractor may also be required to submit a phasing plan for Government approval. The contractor’s proposed phasing plan will provide a logical progression of work with an incremental break out of project quantities verifiable by the Government.
Each phase may also serve as logical point for making partial payments to the contractor.
1.7.6. Project Completion. Prior to submitting the Final Invoice for any project (Work Request), the contractor shall request a Final Inspection and the Government must “Accept” the work for the purpose in which it was intended. Acceptance (BOD - Beneficial Occupancy Date) may include minor punch list
1.8 SECURITY SAFETY AND ACCIDENT PREVENTION:
1.8.1 General: The Contractor shall conform to base regulations and directives pertaining to security, safety, traffic, fire and personnel clearances, insofar as they pertain to the Contractor's activities as directed by the Contracting Officer. Compliance with current regulation AFR 127-101, Ground Accident Prevention Handbook and Public Law 91-156 Occupational Safety and Health Act Standards is mandatory.
1.8.1.1 All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.
Project Number: 111099 Contract Number:
01000 - 4
1.8.1.2 At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.
1.8.1.3 The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Investigation (CBI).
1.8.1.4 Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.
1.8.1.5 The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.
1.8.1.6 All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.
1.8.2 Security: Restricted and Controlled Areas. Restricted and Controlled Areas on Dover AFB have a higher level of security and require additional entry authorization and procedures.
1.8.2.1 Restricted Area (RA). The contractor shall implement and comply with all local base procedures and those contained in AFI 31-101. The contractor will use one of the following methods to gain access and perform project work in the RA:
1.8.2.1.1 Unescorted Entry. This method of entry is the most preferred in which all the contractor’s work force personnel possess a valid RA Badge (Entry Control Card). The contractor must make every effort to obtain RA Badges (RAB) for all his personnel that will work in the RA. Suitability determinations are in accordance with AFI 31-501. The RAB will be prominently displayed at all times while working in the RA.
1.8.2.1.2 Escorted Entry. Contractor personnel possessing a RAB may escort other members of the work force that do not possess a RAB. Escorts are fully responsible for the whereabouts and actions of the individuals they are escorting. This method of entry is intended for smaller projects with limited elements of work and the escort may perform work so long as they can maintain positive surveillance and control of individuals they are escorting at all times.
1.8.2.1.3 Free Zone Monitors. On large projects where it is not practical or possible for the contractor to use the 2 above methods of entry (due to large area worked, large work force, use of subcontractors and delivery truck drivers without badges, etc.) the contractor will request a Free Zone and haul route be established, and will provide full time personnel with RAB to monitor the boundaries of these areas.
These monitors are referred to as Immediate Visual Assessment (IVA) monitors and will read and comply with procedures for performing this task. The IVA will checkout a Government radio from SFS and maintain radio contact with SFS at all times. The IVA will be equipped with a vehicle and cell phone provided by the contractor. Since the IVA’s sole responsibility will be to monitor boundaries
Project Number: 111099 Contract Number:
01000 - 5
(they will not be permitted to perform any work) for security purposes the Government will pay for this service. Method and amount of payment will be negotiated and built into the contract.
1.8.2.2 Controlled Area (CA). Contractor personnel with a RAB are also authorized to enter and escort other contractor personnel in a CA. On larger projects in a CA, where the contractor will have personnel without RABs the contractor will gain authorization to work from the user/owner of the CA.
Similar to the request for a Free Zone, the contractor will provide a work plan and schedule, sketch of the work location, and a list of personnel and vehicles for approval.
1.8.3 Contractor Badge Policies:
1.8.3.1 All requests for contractor badges will be submitted through the Base Contracting Squadron Office and/or the requesting agencies Base point of contact. The contractor must provide the name, date of birth, Social Secutiry number, driver’s liscense number and state of issue, for each individual requesting a contractor badge. The Contracting Squadron Office or Base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW DAFBI 31-101. As a minimum the ORM will be submitted 72-hours prior to the requested date of employment.
1.8.3.2 All contactor employees who’ll be granted unescorted access to the installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation.
Continued employment is contingent upon successful completion and favorable reporting of the criminal background check.
1.8.3.3 Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to Pass and Registration for destruction. Also before a new badge will be issued an ORM must be resubmitted to the Pass and Registration section for approval again. In the event a badge is lost or stolen, the badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th Security Forces Squadron and submit a new request for badge renewal per paragraph 1.9.2.1. before a new badge can be reissued.
1.8.3.4 Base Contracting Office or base point of contact will immediately notify Security Forces, Pass and Registration when a contractor’s employment has been terminated. The Agency Chief or Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial;
they need to contact the Contracting Squadron.
1.8.4 Installation Access:
1.8.4.1 The contractor shall obtain personal contractor identification badges for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from Pass and Registration, for the duration of the contract. Employees are only permitted to enter the installation during the date and time periods indicted on their contractor badge.
1.8.4.2 Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the installation. All vehicles entering the installation or sensitive areas are subject to search. Any refusal or non consent by an employee will result in termination of their Base access and immediate confiscation of this access badge.
Project Number: 111099 Contract Number:
01000 - 6
1.8.4.3 During Force Protection Condition (FPCON) Normal and Alpha, personnel without Base issued badges must be sponsored onto the installation.
1.8.4.4 During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
1.8.4.5 During Higher FPCONs (Charlie and Delta) the Base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended as the direction of the Installation Commander.
1.8.5 Safety:
1.8.5.1 For the protection of Government personnel and property, the Contractor shall comply with the following minimum safety requirements while performing work under this contract. These requirements are additional to and do not replace the standards promulgated by the Department of Labor under the Occupational Safety and Health Act (OSHA). In the event of a conflict between the OSHA Standards and these requirements, the most stringent shall apply.
1.8.5.2 The Contractor, before starting work, shall request a briefing from the Base Operations Officer and the Safety Office. The briefing will review safety requirements and cover any additional local safety precautions related to the work under this contract. All Contractor vehicle operators, before driving on the flight line, shall obtain special instructions on standard flight line traffic controls and become familiar with the particular hazards involved.
1.8.5.3 Severe Weather Warning Requirements: When notified by the Contracting Officer, the Government Inspector, or the Base Operations Officer that a severe weather warning alert has been issued for the area in which the contract is being executed, the Contractor shall immediately take necessary action to tie down and secure all materials on the job site that could become missiles as a result of strong surface winds, thunderstorms, etc. This requirement also includes all nonregular working periods such as nights, Saturdays, Sundays, and holidays.
1.8.5.4 Fire Prevention: Contractor's operations and personnel shall comply with the requirements of the Base Fire Prevention Standards and the Base Fire Chief.
1.8.6 Accident Prevention:
1.8.6.1 Vehicle Operations: The following standards shall be observed at all times when operating vehicles on the flight line. Careful attention and strict adherence to these precautions will prevent accidental damage to aircraft and possible injury to both flight and ground personnel.
1.8.6.2 Vehicles shall not be driven within 50 feet of an aircraft or under any part of an aircraft.
Vehicles shall not be backed or driven forward in the immediate direction of any aircraft within 50 feet, nor shall a vehicle be driven within 50 feet of aircraft fueling or defueling operation. When parked on the flight line, vehicles and all equipment mounted on wheels, which do not have integral braking systems, shall be chocked when left unattended. Vehicles left unattended and parked on the flight line shall be left unlocked with keys in the ignition system.
1.8.6.3 Under no circumstances shall vehicles be allowed to stand in front of, or be driven into, the path of taxiing aircraft. No vehicle will be parked or driven closer than 25 feet in front or 200 feet to the rear of any aircraft when engines are in operation or about to be put in operation.
Project Number: 111099 Contract Number:
01000 - 7
1.8.6.4 Vehicle operators shall obey the flightline speed limits set by local officials. In no case shall vehicles be operated in excess of 15 MPH on aircraft parking aprons and 40 MPH on taxiways and runways.
1.8.6.5 Vehicle operations on the flight line or airfield are under the control of tower personnel. Control tower radio instructions shall be observed and obeyed by vehicle operators at all times while performing work on the airfield. The Contractor shall assign the Government furnished radio to one of his personnel on the airfield whose responsibility shall be to maintain contact with control tower personnel and coordinate all Contractor movement on the airfield.
1.8.6.6 Before airfield operations, vehicle operators shall insure that all equipment carried on their vehicles is properly stowed and secured and that the vehicles are inspected for objects that could damage aircraft. After vehicles are operated on unpaved surfaces, operators shall stop when reaching the airfield pavement and remove any rocks that are wedged between the tires or treads.
1.8.6.7 Parking of Equipment: At the end of each day's work the contractor shall move all of his equipment to an area designated on the drawings or by the Contracting Officer for overnight parking.
1.8.6.8 Traffic Control Devices: The Contractor shall be responsible for providing all signaling, lighting, safety devices and airfield barricades in the immediate work area conforming to the provisions of the Manual of Uniform Traffic Control Devices (OSHA Standards 1926.201 and 1926.202). Airfield barricades shall be supplied by the contractor and erected at the commencement of work. The barricades shall be placed in areas of aircraft movement. Barricades shall not be removed until so directed by the Contracting Officer or his designated representative. Traffic cones or other similar devices may be used to control vehicular traffic only.
1.8.6.9 Airfield Barricades: Barricades shall consist of reflective orange and white painted timbers, barrels, or similar devices as may be approved by the Contracting Officer, spaced at 50 feet on center, with two amber-yellow lights on each barricade. Reflective stripes shall be 6 to 12 inches wide. Timbers shall be 12 by 12 inches minimum, 10 feet long, solid wood or sand filled plywood boxes, barrels shall be 2 feet minimum high. All barricades shall be either anchored or of sufficient mass to retain an established position where they are placed, in all types of weather conditions. Flashing lights shall be at least 5 candelas effective intensity and flash at a rate of 55 to 75 flashes per minute. Continuous burning lights must have an effective intensity of 10 candelas.
1.9 MANUFACTURER'S INSTALLATION INSTRUCTIONS: Manufacturer's instructions pertaining to the use or installation of products, materials, or equipment used or installed in the prosecution of work under this contract, whether furnished as a normal, usual or customary practice of the manufacturer or if furnished in response to a requirement stipulated herein, form a part of these specifications as though specifically set forth herein. In the event of conflict between the specifications or drawings and manufacturers' instructions, the Contractor shall bring such conflict to the attention of the Contracting Officer for resolution before proceeding with the work involved.
1.10 COORDINATION OF WORK: The Contractor shall coordinate the work of subcontractors and shall ensure the coordination of the work between the various trades. In many instances the contract drawings indicate only the general location and arrangement of equipment, fixtures, piping, conduit, or outlets and may not in all cases show, identify or detail all materials or components that are necessary, usual and customary for proper installation, connection or attachment. The Contractor shall study, examine and evaluate the contract drawings to establish the work, coordination, or materials required
Project Number: 111099 Contract Number:
01000 - 8 and necessary to provide a product complete in the usual and customary manner, and shall provide for all such requirements as though expressly detailed herein or on the drawings.
1.11 AS-BUILT DRAWINGS: The Contractor shall maintain and keep current one set of drawings which shall be annotated in red pencil to show all as-built construction. These as-built drawings shall be submitted to the Contracting Officer at Final Inspection. The as-built drawings shall clearly and accurately depict any deviations or changes to both existing and new construction from that which is indicated on the construction drawings.
1.11.1 As-Built Data: The Contractor shall also enter specific as-built data in the designated information blocks provided adjacent to various equipment or other items on the drawings. This as-built data may include information such as manufacturer's name, model, size, horsepower etc., of the equipment physically installed under the project, or elevations and locations of underground utilities.
1.11.2 Government Review: Time allowed for Government review of the as-built drawings will be, exclusive of day of receipt by the Contracting Officer and the day of return, 10 working days.
Government comments and reasons in the event of disapproval will be in writing.
1.12 TEMPORARY UTILITY CONNECTIONS AND CHARGES: As outlined in FAR Clause 52.236-14 “Availability and Use of Utility Services”, the Government will make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies. Electric and gas utility service for contractor-furnished office/storage facilities and for actual construction activities will be charged to the contractor at prevailing rates prescribed by the FAR and Air Force regulation. The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. The cost of water utility service will not be charged to the contractor.
1.12.1 For temporary electric service, the contractor shall provide all necessary, cable, transformers, hardware, miscellaneous items and all labor necessary to obtain service from the nearest electric source.
The Government will make the final connection to the electric source.
1.12.2 For temporary water service, the contractor shall not connect to any fire hydrant on Dover Air Force Base without prior authorization from the Contracting Officer or designated representative.
Tampering with a fire hydrant on Dover Air Force Base is a federal offense per US CODE Title 42, Section 300i-1.
1.12.2.1 When authorized to obtain water from a fire hydrant for construction or other purposes, the contractor shall provide and install a connection assembly consisting of a ASSE (American Society of Sanitary Engineering) approved backflow prevention device and a throttling device. The assembly shall be connected only to the fire hydrant 2-1/2 outlet nozzle. Prior to use, the fire hydrant connection assembly must be inspected and tested by DAFB Base Civil Engineer personnel to insure proper installation and function. Regardless of the intended use, under no circumstance shall the contractor use a fire hydrant without an attached and approved connection assembly.
1.12.2.2 Contractor personnel authorized by DAFB will be permitted to open and close the main operating nut of fire hydrants. Only appropriate hydrant wrenches specifically designed for the hydrant operating nut will be used. Fire hydrants will be opened completely to prevent weep holes located in the hydrant boot from discharging and undermining the hydrant foundation. Fire hydrant main operating nut shall not be used to throttle the water pressure of volume. When contractor use of a fire hydrant will exceed one hour the hydrant number located on the hydrant barrel shall be forwarded to the DAFB Base Civil Engineer to notify the Base Fire Department of the service status.
Project Number: 111099 Contract Number:
01000 - 9
1.12.2.3 Operation of a fire hydrant during freezing temperatures may cause damage to the hydrant.
During freezing temperature conditions the contractor shall make necessary provisions to prevent the hydrant barrel and attached backflow prevention/meter assembly from freezing and causing damage to the hydrant.
1.12.2.4 Damaged fire hydrants resulting from contractor abuse or failure to comply with these requirements shall be repaired or replaced at the contractor’s expense.
1.12.3 The contractor shall provide billing information to the project inspector who will prepare a Contractor Utility Connection Worksheet for the contractor’s signature which will serve as the source document for billing of utility service. At the completion of the project a Contractor Utility Disconnection Worksheet will be processed in a similar manner to terminate billing for utility service.
Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
1.12.4 Contractor is responsible for all costs associated with telephone service. Telephone service will not be Government furnished.
1.13 REFERENCED PUBLICATIONS:
1.13.1 Specifications: The document titled "Delaware Standard Specifications, Specifications for Road and Bridge Construction" and “Supplemental Specifications” (latest editions as of the date of this contract), hereinafter referred to as the Standard Specifications, shall govern the work performed as required by this specification or as shown on the drawings, and form a part of this specification or the drawings to the extent indicated by the references thereto. For the purposes of this project, all references to the "Director", "Inspector", or "Engineer" in the Standard Specifications shall be construed to mean "Contracting Officer". In the event of conflict between this specification or the drawings and the Standard Specifications, this specification or the drawings shall govern.
1.13.2 Standards: The document titled "Delaware Erosion and Sediment Control Handbook" (available on-line), hereinafter referred to as the Delaware Handbook, shall govern the work performed as required by this specification or as shown on the drawings, and form a part of this specification or the drawings to the extent indicated by the references thereto. In the event of conflict between this specification or the drawings and the Delaware Handbook, this specification or the drawings shall govern.
1.13.3 Drawings: The document titled "The State of Delaware Department of Transportation Standards" (latest edition as of the date of this contract), hereinafter referred to as the Standard Drawings, shall govern the work performed as required by this specification or as shown on the drawings, and form a part of this specification or the drawings to the extent indicated by the references thereto. In the event of conflict between this specification or the drawings and the Standard Drawings, this specification or the drawings shall govern.
1.14 RADIOACTIVE MATERIAL ACCESS REQUIREMENTS:
1.14.1 The 436 AMDS/SGPB Bioenvironmental Engineering is the Dover AFB Radioactive Material Access Authority.
1.14.2 The contractor shall not store radioactive material on Dover AFB. The contractor shall remove radioactive material from Dover AFB each day.
Project Number: 111099 Contract Number:
01000 - 10
1.14.3 Contractor use of radioactive material on Dover AFB must be approved in advance. At least 30 days in advance of material being brought onto Dover AFB, the contractor shall submit the following information to the Base Contracting Officer for approval by the Base Radiation Protection Officer.
Dover AFB Radioactive Material Access Authority
436 AMDS Bioenvironmental Engineering
(302) 677-2595; email: 436 AMDS/SGPB@dover.af.mil
(Effective 1 Aug 2010)
1) Government Project Number or Contract Number:
Copy of contract clause w/description of work to be conducted:
Government Agency: (authorizing work i.e. Corp of Engineers):
Agency Point of Contact Name:
Point of Contact Phone Number:
Point of Contact Email Address:
2) Primary Contractor Name
Point of Contact Name:
3) Sub-contractor Name
Point of Contact Name:
4) Dates of Project/description:
5) Location of project: (i.e. location area, building number)
6) Copy of Nuclear Regulatory Commission (NRC) Permit or
State Radioactive Material License with NRC form 241, "Report of Proposed Activities in Non-Agreement States, Areas of Exclusive Federal Jurisdiction, or Offshore Waters".
7) Item name and bill of lading for transportation (i.e. Troxler model and serial number)
Project Number: 111099 Contract Number:
01000 - 11
8) Copy of current swipe sample results
9) Copy of all personnel training certificates
1.15 FIRE PROTECTION DURING CONSTRUCTION: During the performance of on-site construction activities, the contractor shall comply with all requirements of the Army Corps of Engineering Manual (EM), EM 385-1-1, “Safety and Health Requirements Manual”, NFPA 241, “Safeguarding Construction, Alteration, and Demolition Operations”, Dover Air Force Base Instruction DAFBI 32-2001, and all Air Force, AMC, OSHA, CFR, regulations and directives.
1.15.1 Supervisors shall brief all personnel under their direction on fire prevention practices in accordance with the above documents.
1.15.2 The supervisor shall attend a contractor’s briefing on fire safety prior to any work. This is normally conducted at the pre-construction meeting.
1.15.3 Post fire reporting procedures and emergency phone numbers in a conspicuous location.
1.16 KENT COUNTY SEWER PERMIT
1.16.1 The sanitary sewer collection and local transmission system on Dover Air Force Base is owned and maintained by Kent County, Delaware. All work, as shown on the contract drawings and required by the contract specifications, associated with the sanitary sewer collection and local transmission system is subject to permitting and inspection by the Kent County Public Works Department (Department) in accordance with Kent County Code, Chapters 128 and 180, as amended, and will be conducted in accordance with the related Department sewer construction permit. Through agreement between the Department and Dover Air Force Base, this project is exempt from an Impact Fee, however an Inspection Fee of $325 is required by the Department.
1.16.2 The contractor shall obtain a Sewer Permit for all new construction or a Sewer Abandonment Permit for all demolition work associated with the sanitary sewer collection and local transmission system, as applicable, from the Department (302-744-2430). The contractor shall submit to the Department the necessary application documents and make payment of required fees in order to obtain the necessary permits associated with the connection, modification, abandonment, or demolition of the sanitary sewer collection and local transmission system, in accordance with Kent County Code, Chapter 128 and 180, as amended.
1.16.3 The contractor shall submit copies of the obtained permits to the Contracting Officer for approval. No construction activities on the sanitary sewer collection and local transmission system shall be performed by the contractor until the necessary permits have been obtained by the contractor and submitted to the Government for approval.
1.16.4 The contractor shall make all notifications to the Department as required by the County’s permit regarding required inspections of the work by the Department.
1.16.5 The Contractor shall notify the Government Inspector a minimum of 24 hours in advance of all work on the sanitary sewer collection and local transmission system. This is a Mandatory Verification contract requirement as required by the respective contract schedule.
01001 - 1
01001
DOVER AFB SITE MANAGEMENT
PART 1 GENERAL
1.1 GENERAL
1.1.1 The appearance of construction sites at Dover Air Force Base is of paramount importance to the Commander of Dover Air Force Base. A clean and well kept construction site will help ensure proper compliance with the safety and environmental requirements of the contract. The management element of the Contractor’s performance rating will be affected by the compliance with this specification. The Contractor shall comply with all of the requirements specified herein and associated specification sections.
1.1.2 The Contractor is responsible for the collection and disposal of all debris, rubble, residue and waste material generated in the performance of work under this contract. All such materials shall be removed from Dover Air Force Base by the Contractor and disposed of in a State approved permitted landfill. The contractor shall recycle concrete, untreated wood and other demolition debris as required by Executive Order 13101 and other sections of this specification. The Contractor is not permitted to deposit any such materials in Base trash collection containers or at any on-Base location without prior approval of the Contracting Officer. The Contractor is responsible for remediating and/or reimbursing the Base for any spills caused by him, his personnel and/or his equipment.
1.2 SUBMITTALS: The following shall be submitted:
1.2.1 Site Layout Plan
Submit for approval a detailed scaled plan drawing showing the layout of the construction site prior to starting work. As a minimum the drawing shall include the locations of office and storage trailers, required utility connection points, equipment storage and material staging areas, construction entrance(s) including temporary stabilized construction entrance where required, contractor employee parking areas, temporary construction fence including placement of safety signs (i.e. hard hat area, etc.), and trash dumpsters and containers. The submittal shall also include photographs of the site prior to disturbance by the start of work.
1.2.2 Dust Control Plan
Submit a plan for controlling the accumulation of dirt, debris, and dust on roadways and other surfaces adjacent to the construction site. As a minimum the plan shall include the name of the contractor including a designated point of contact, equipment to be used for cleaning the streets of this material, and the measures to be taken to reduce transportation of mud onto adjacent roadways (i.e. rotating or replacing the stones in the temporary stabilized construction entrance to clean the truck tires).
PART 2 PRODUCTS
2.1 DUMPSTERS
01001 - 2
The dumpsters shall be painted to match ICI Devoe #4216-7460 “DAFB Bald Eagle Brown”, free of graffiti, and be equipped with a securable cover. The cover shall be in place at all times except when trash is being deposited or removed.
2.2 TRASH CONTAINERS
Trash containers shall consist of 55 gallon drums painted to match ICI Devoe #4216-7460 “DAFB Bald Eagle Brown”, free of graffiti, and have "TRASH" printed in 10 inch high white lettering on the side of the container at two locations opposite each other. The Contractor shall provide a minimum of one trash container for each 10,000 square feet of construction area.
2.3 OFFICE/STORAGE TRAILERS/SITES
2.3.1 Contractor's office and storage trailers shall be in new or like new condition and be painted ICI Devoe/Glidden color Pastel tintbase: Formula #BLK 1P32 YOX 1P39 OXR19 “DAFB Eagle Feather Tan” or approved equal on the exterior. Each trailer shall have an emergency notification card (5 x 7 or 3 x 5) in a weatherproof holder affixed on the outside of the trailer near the entry door. The card shall indicate the name of the Contractor, and the name and telephone number of the point of contact for emergency notification. Provide trailer foundation skirting of either lattice or metal panel design.
Storage of materials and debris under the trailers is prohibited. The trailer shall be securely fastened to the ground with appropriate fastening devices to adequately brace the structure against hurricane force winds.
2.3.2 The contractor will be provided with storage sites as deemed necessary to support the construction.
The primary site is the construction site. The supplemental site, if needed, may not be in close proximity to the construction site, but will be on Dover Air Force Base.
2.4 TEMPORARY CONSTRUCTION FENCE
2.4.1 As a minimum the temporary construction fence shall be a 6’ high chain link fence constructed of a welded galvanized steel pipe frame and attached woven steel wire mesh attached with wire ties. The fence shall be adequately supported and held securely in place by the use of precast concrete post blocks, stand-off post braces, embedded posts or a combination thereof, as necessary for the particular location and conditions. Stand-off post braces, when used, shall only be installed on the inside of the temporary construction fence. Where temporary construction fence is required to have vision screening, additional support posts at each panel shall be provided and embedded in both turf and paved areas.
(Note to Specifier: Most projects will not require the use of vision screening unless they are in a highly sensitive location. The requirement for vision screening will be determined on an individual project basis and approved by the Chief of Engineering.)
2.4.2 The temporary construction fence shall also be provided with vision screening which shall consist of either fabric or slats. Screening fabric shall have the following minimum material characteristics:
Color Black Shading 70% Weight 6.20 oz/sq yd Burst Strength 475 psi
01001 - 3
Screening fabric shall be provided with hemmed reinforced edges and mid-spans with grommets for attachment to chain link fabric at 24 inch intervals.
2.5 ELECTRICAL SERVICE
Where electrical service is desired at the contractor’s facilities, connection shall be made in accordance with the detail entitled ‘Electrical Service to Contractor Facilities’, located either at the end of this section or on the construction drawings.
2.6 SANITATION FACILITIES
The contractor shall provide portable sanitation facilities. Portable sanitation facilities shall be self-contained units with both urinals and stool capabilities. Units shall be adequately ventilated, cleaned and emptied at least once a week or more if determined necessary and directed by the Contracting Officer.
The doors shall be self-closing and securable. The exterior of the unit shall match “Eagle Feather Tan”.
Locate these facilities out of the view of the public, within the construction fence area.
2.7 CONSTRUCTION ACCESS ROUTE SIGNS
Any construction access route signs which the contractor may wish to erect in order to facilitate location of the site by suppliers or subcontractors must receive prior approval by the Contracting Officer.
Approved signs shall not exceed 12” x 18” in size, shall consist of white letters on a dark brown background (back of sign and post shall be dark brown also), and be mounted at locations approved by the Contracting Officer.
PART 3 EXECUTION
3.1 CONSTRUCTION SITE LAYOUT
The contractor shall arrange the office trailers, storage trailers, construction entrance, temporary construction fence, sanitation facilities, and trash dumpsters to effectively use the area designated on the plans. The contractor shall indicate at least one construction entrance for the project.
3.2 TEMPORARY STABILIZED CONSTRUCTION ENTRANCE
The nature of the project may also require a temporary stabilized construction entrance at non-paved areas when exiting to paved areas. The entrance shall be constructed as required by the Sediment and Stormwater Management Plan permit drawings. The contractor shall maintain the temporary stabilized construction entrance such that it functions adequately in the removal of sediment from construction vehicle tires. Stones in the entrance shall be periodically rotated or changed to ensure construction vehicle tires are clean when leaving the site. (Note to Specifier: The requirement for a temporary stabilized construction entrance should be established in the project design and identified on the Sediment and Stormwater Management Plan obtained for the project.)
3.3 CLEANING ROADWAYS
The contractor shall make special effort to prevent the generation of dirt, debris, or dust as a result of activities related to the work under this contract. All roadways adjacent to the construction site which accumulate construction dirt, debris, dust, or other foreign materials as a result of activities related to this
01001 - 4 contract shall be cleaned at least daily or more often if determined necessary and directed by the Contracting Officer in order to maintain a neat appearance. The method of cleaning shall remove and not just displace the material.
3.4 TRASH REMOVAL
The 55 gallon trash containers shall be emptied a minimum of once a day or more often if directed by the Contracting Officer. The site dumpsters shall be emptied a minimum of once a week or more often if directed by the Contracting Officer in order to keep the site clean of trash. Dumpsters and containers shall not be allowed to overflow and permit trash to enter the site or adjacent areas.
3.5 EROSION CONTROL AND SAFETY FENCE
Erosion control fence and safety fence shall be maintained in a neat and orderly appearance. As a minimum the Contractor shall perform weekly checks of the condition of the erosion control fence and safety fence. Sagging or falling fences shall be immediately repaired.
3.6 TEMPORARY CONSTRUCTION FENCE
Location of temporary construction fence shall be as shown on the approved site layout plan. The fence shall be constructed around the perimeter of all construction, staging, and storage areas prior to the start of any work. Trailers may be on site prior to completion of the fence. The fence shall be maintained in a neat and orderly appearance. Fence panels shall be maintained to within one (1) foot of plan horizontal alignment and within 3-inches of vertical. As a minimum the Contractor shall perform weekly checks of the condition of the fence. Leaning or fallen fences and torn or missing vision screening fabric shall be immediately repaired.
3.7 GRASS CUTTING
Any grass on the construction site shall be cut at least once a week during the growing season. The grass immediately adjacent to both sides of the erosion control fence, safety fence, or construction fence shall also be cut as required above to keep a neat and professional appearance.
3.8 SAFETY SIGNS
Safety signs shall be posted at all entrances to the construction site. The signs shall be ICI Devoe/Glidden color Pastel tintbase: Formula # BLK 1P32 YOX 1P39 OXR 19 “DAFB Eagle Feather Tan” unless safety mandates otherwise.
3.9 RESTORATION
3.9.1 Except as otherwise required by the contract, all disturbed or damaged landscaping, paved areas, curbs or sidewalks shall be restored to the original condition. This condition will be as documented in the photographs of the undisturbed site submitted with the site layout plan.
END OF SECTION
01002 - 1
SECTION 1002
DOVER AFB ENVIRONMENTAL SPECIFICATIONS
Part A. Hazardous Materials Usage Part B. Affirmative Procurement Part C. Recycling of Construction Debris Part D. Excess Soil Requiring Disposal Guidelines Part E. Disposal of Encountered Groundwater Part F. Conformance with Environmental Management System Part G. Air Permitting
Part A. Hazardous Materials Usage by Contractors
1. Purpose. As required by AFI 32-7086, Hazardous Materials Management, paragraphs 2.5.5.2.4, 2.5.5.2.8 and 2.5.5.2.9; requires Dover AFB to account for all hazardous materials (HAZMATs) brought on the facility to include contractors as well as providing procedures for the reporting of those items.
1.1. This part outlines actions to be taken by the contractor in the request for approval of hazardous materials prior to initiating field activities associated with the subject project and the reporting of approved hazardous materials usage during contract performance.
1.2. Compliance with this part is mandatory and contactor failure to comply will result in the contractor not being allowed to bring any hazardous materials on Dover AFB.
Contractors must also comply with mandatory Federal, State and local guidelines, regarding storage and management of hazardous materials, failure to comply can result in legal action by Federal, State or local enforcement officers against the offender.
2. Policy.
This is the start of the file's text. The full file is on GovTribe.