FA4497-11-R-0007 Amendment 5.pdf
PDF 39 KB Posted
- Attached to
- Airfield & Heavy Duty Paving IDC Federal contract opportunity
- Solicitation number
- FA4497-11-R-0007
About this file
This amendment is being done as an addendum to the specifications. All amendments have also been listed in Section J.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ammend 1.pdf | ||
| Questions.pdf | ||
| FA4497-11-R-0007 Amedment 4.pdf | ||
| FA4497-11-R-0007 Amendment 3.doc | DOC document | |
| SPECIFICATIONS TOC.pdf | ||
| FA4497-11-R-0007 Conformed.pdf | ||
| Pre-Proposal Minutes 2.pdf | ||
| Pre-Proposal Minutes 1.pdf | ||
| FA4497-11-R-0007 RFP Ammendment 2.pdf | ||
| Sample Questionnaire Ltr.pdf | ||
| FA4497-11-R-0007 RFP Ammendment.pdf | ||
| FA4497-11-R-0007 RFP.pdf | ||
| precip days.pdf | ||
| verif.pdf | ||
| SURVEY.pdf | ||
| Climatic Data.pdf | ||
| perf.pdf | ||
| GFP.pdf | ||
| Specifications.pdf | ||
| submit.pdf | ||
| WD - DE00014.pdf | ||
| Survey Cover Letter.pdf | ||
| FA4497-11-R-0007 Solicitation.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOHN M. LYNCH
BUILDING 639 ATLANTIC ST
DOVER AFB DE 19902-4639
F1Q3FQ1033A001 111099
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to:
a-Incorporate Addendum 1 to Specif ications, w ith all the attachments, updates, and deletions.
b-The attached addendum No.1, pages 1-39, to Specif ications are hereby incorporated w ith all of the listed attachments, updates, and deletions c-Section J is hereby updated to list Amendments 0001 through 0005 as attachments to the solicitation d-All other terms and conditions remain the same
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jun-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4497-11-R-0007
X 9B. DATED (SEE ITEM 11)
31-May-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jun-2011
CODE
436 CONTRACTING SQUADRON
BLDG 639 ATLANTIC ST
DOVER AFB DE 19902-5639
FA4497 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE FA4497
FACILITY CODECODE
EMAIL:TEL:
FA4497-11-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
DESCRIPTIONS / SPECIFICATIONS
TITLE DATE PAGES
1. Specifications for Project #111099, Airfield & Heavy Duty Paving IDC 13 April 2011 218
2. Addendum No.1 to Specifications for project 111099 01 May 2011 39
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Table of Contents has been deleted
The following have been added by full text:
The table of contents has been changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Determination General Decision
DE100014
2 21-MAY-2010
Attachment 10 Specifications 218 12-APR-2011 Attachment 11 Table of Contents 'Specifications' 2 23-JUN-2011 Attachment 2 Material Approval Submittals 3 13-APR-2011 Attachment 3 Operational Climatic Data 3 05-SEP-1997 Attachment 4 Mean Number Days Precipitation Trace to .5 inches
1 30-JUN-2003
Attachment 5 Mandatory Verification Schedule 2 13-APR-2011 Attachment 6 Performance Requirements 1 13-APR-2011 Attachment 7 Schedule of Government Furnished Property 1 13-APR-2011 Attachment 8 Past and Present Performance Survey 4 21-MAR-2011 Attachment 9 Past and Present Performance Question Sample
Cover Letter
1 13-APR-2011
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Determination General Decision
DE100014
2 21-MAY-2010
Attachment 2 Material Approval Submittals 3 13-APR-2011
FA4497-11-R-0007
Attachment 3 Operational Climatic Data 3 05-SEP-1997 Attachment 4 Mean Number Days Precipitation Trace to .5 inches
1 30-JUN-2003
Attachment 5 Mandatory Verification Schedule 2 13-APR-2011 Attachment 6 Performance Requirements 1 13-APR-2011 Attachment 7 Schedule of Government Furnished Property 1 13-APR-2011 Attachment 8 Past and Present Performance Survey 4 21-MAR-2011 Attachment 9 Past and Present Performance Question Sample
Cover Letter
1 13-APR-2011
Attachment 10 Specifications 218 12-APR-2011 Attachment 11 Table of Contents 'Specifications' 2 23-JUN-2011 Attachment 12 Amend 0001 2 02-JUN-2011 Attachment 13 Amend 0002 7 08-JUN-2011 Attachment 14 Amend 0003 8 23-JUN-2011 Attachment 15 Amend 0004 2 23-JUN-2011 Attachment 16 Amend 0005 3 28-JUN-2011
(End of Summary of Changes)
File details come from the government source that posted it. Updated .