FA4497-11-R-0007 Solicitation.pdf
PDF 2 MB Posted
- Attached to
- Airfield & Heavy Duty Paving IDC Federal contract opportunity
- Solicitation number
- FA4497-11-R-0007
About this file
FA4497-11-R-0007 - Airfield Heavy Duty Pavements IDC Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ammend 1.pdf | ||
| FA4497-11-R-0007 Amendment 5.pdf | ||
| Questions.pdf | ||
| FA4497-11-R-0007 Amedment 4.pdf | ||
| FA4497-11-R-0007 Amendment 3.doc | DOC document | |
| SPECIFICATIONS TOC.pdf | ||
| FA4497-11-R-0007 Conformed.pdf | ||
| Pre-Proposal Minutes 2.pdf | ||
| Pre-Proposal Minutes 1.pdf | ||
| FA4497-11-R-0007 RFP Ammendment 2.pdf | ||
| Sample Questionnaire Ltr.pdf | ||
| FA4497-11-R-0007 RFP Ammendment.pdf | ||
| FA4497-11-R-0007 RFP.pdf | ||
| precip days.pdf | ||
| verif.pdf | ||
| perf.pdf | ||
| GFP.pdf | ||
| Specifications.pdf | ||
| submit.pdf | ||
| SURVEY.pdf | ||
| Climatic Data.pdf | ||
| WD - DE00014.pdf | ||
| Survey Cover Letter.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4497-11-R-0007
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Base Year
FFP
Airfield & Heavy Duty Paving IDC 12 Sep 2011 or award date, whichever date is later, to 31 Mar 2012 FOB: Destination
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AA 1,400 Square Yard
Remove Existing Asphalt Pavement
FFP
Remove Existing Asphalt Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
PURCHASE REQUEST NUMBER: F1Q3FQ1033A001
SIGNAL CODE: A
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AB 87,500 Square
Remove Existing Asphalt Pavement, Pavement Milling (02115/1.3 & 1.4)
FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AC 1,400 Square
Remove Existing Concrete Pavement
Remove Existing Concrete Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AD 4,350 Square
Remove Existing Concrete Pavement, Pavement Milling (02115/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AE 175 Linear Foot
Saw Cutting, Asphalt Pavement
Saw Cutting, Asphalt Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AF 175 Linear
Saw Cutting, Concrete Pavement
Saw Cutting, Concrete Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AG 8 Cubic
Remove Catch Basins,Manholes,Drain Pipe
Remove Catch Basins, Manholes, and Drainage Pipe (02130/1.4 & 1.5) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AH 250 Linear
Silt Fence
Silt Fence (02220/1.3.1 & 1.4.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AJ 400 Square
Stabilized Construction Entrance
Stabilized Construction Entrance (02220/1.3.2 & 1.4.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AK 8 Each Storm Drain Inlet Protection
FFP
Storm Drain Inlet Protection (02220/1.3.3 & 1.4.3) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AL 140 Cubic
Earthwork Excavation
Earthwork Excavation (02225/1.3.1 &1.4.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AM 250 Cubic
Borrow, Type C
Borrow, Type C (02225/1.3.2 & 1.4.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AN 175 Square
Soil Stabilization Fabric
Soil Stabilization Fabric (02231/1.5.1 & 1.6.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AP 450 Cubic
Crushed-Aggregate Sub-Base Course
Crushed-Aggregate Sub-Base Course (02231/1.5.2 & 1.6.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AQ 450 Cubic
Graded-Crushed-Aggregate Base Course
Graded-Crushed-Aggregate Base Course (02233/1.4.1 & 1.5.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AR 1,500 Square
Preparation of Existing Base Course
Preparation of Existing Base Course (02233/1.4.2 & 1.5.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AS 750 Square
Soil Sterilization
Soil Sterilization (02233/1.4.3 & 1.5.3) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AT 175 Cubic
Excavation & Backfill for Pipe Trenches
Excavation and Backfill for Pipe Trenches (02310/ 1.2.1 & 1.3.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AU 175 Linear
Reinforced Concrete Pipe, 12-Inch
Reinforced Concrete Pipe, 12-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AV 175 Linear
Reinforced Concrete Pipe, 15-Inch
Reinforced Concrete Pipe, 15-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AW 175 Linear
Reinforced Concrete Pipe, 18-Inch
Reinforced Concrete Pipe, 18-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AX 175 Linear
Reinforced Concrete Pipe, 24-Inch
Reinforced Concrete Pipe, 24-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AY 175 Linear
Reinforced Concrete Pipe, 30-Inch
Reinforced Concrete Pipe, 30-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AZ 75 Linear
Reinforced Concrete Pipe, 36-Inch
Reinforced Concrete Pipe, 36-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BA 75 Linear
Reinforced Concrete Pipe, 42-Inch
Reinforced Concrete Pipe, 42-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BB 75 Linear
Reinforced Concrete Pipe, 48-Inch
Reinforced Concrete Pipe, 48-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BC 25 Linear
Reinforced Concrete Pipe, 54-Inch
Reinforced Concrete Pipe, 54-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BD 25 Linear
Reinforced Concrete Pipe, 60-Inch
Reinforced Concrete Pipe, 60-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BE 25 Linear
Reinforced Concrete Pipe, 66-Inch
Reinforced Concrete Pipe, 66-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BF 25 Linear
Reinforced Concrete Pipe, 72-Inch
Reinforced Concrete Pipe, 72-Inch (02410/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BG 25 Linear
PVC Pipe, Schedule 80, 4-Inch
PVC Pipe, Schedule 80, 4-Inch (02420/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BH 35 Linear
PVC Pipe, Schedule 80, 8-Inch
PVC Pipe, Schedule 80, 8-Inch (02420/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BJ 35 Linear
PVC Pipe, Schedule 80, 12-Inch
PVC Pipe, Schedule 80, 12-Inch (02420/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BK 35 Linear
PVC Pipe, Schedule 80, 16-Inch
PVC Pipe, Schedule 80, 16-Inch (02420/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BL 35 Cubic
Concrete
Concrete (Up to 75 CY per Work Request) (02513/1.3.11 & 1.3.2.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BM 900 Cubic
Concrete (Greater than 75 CY per Work Request) (02513/1.3.1.1 & 1.3.2.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BN 88 Each Dowels
FFP
Dowels (02513/1.3.1.6 & 1.3.2.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BP 88 Each Tie-Bars
FFP
Tie-Bars (02513/1.3.1.6 & 1.3.2.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BQ 5 Each Drainage Inlet, Type 1
FFP
Drainage Inlet, Type 1 (02520/1.4 & 1.5.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BR 5 Each Drainage Inlet, Type 2
FFP
Drainage Inlet, Type 2 (02520/1.4 & 1.5.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BS 5 Each Drainage Inlet, Type 3
FFP
Drainage Inlet, Type 3 (02520/1.4 & 1.5.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BT 5 Each Manhole
FFP
Manhole (02520/1.4 & 1.5.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BU 5 Each Drainage Inlet Adjustment
FFP
Drainage Inlet Adjustment (02525/1.5.1 & 1.6.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BV 5 Each Manhole Adjustment
FFP
Manhole Adjustment (02525/1.5.1 & 1.6.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BW 5 Each Drainage Inlet Casting
FFP
Drainage Inlet Casting (02525/1.5.2 & 1.6.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BX 5 Each Manhole Casting
FFP
Manhole Casting (02525/1.5.2 & 1.6.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BY 5 Each Water Valve Box Adjustment
FFP
Water Valve Box Adjustment (02525/1.5.3 & 1.6.3) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BZ 1 Each Drainage Inlet & Manhole Frame Extension
FFP
Drainage Inlet and Manhole Frame Extension (02525/1.5.4 & 1.6.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CA 1 Each Water Valve Box Extension Ring
FFP
Water Valve Box Extension Ring (02525/1.5.4 & 1.6.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CB 35 Cubic
Concrete for Concrete Structures
Concrete for Concrete Structures (02530/1.3.1 & 1.4.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CC 1,750 Pound Reinforcement for Concrete Structures
FFP
Reinforcement for Concrete Structures (02530/1.3.2 & 1.4.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CD 175 Square
Welded Steel Wire Fabric, 6x6
Welded Steel Wire Fabric, 6x6 (02540/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CE 5,000 Square
Cracking & Seating Concrete Pavement
Cracking and Seating Concrete Pavement (02550/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CF 5 Each Ground Rod/Tie-Down Anchor
FFP
Ground Rod/Tie-Down Anchor (02552/1.6 & 1.7) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CG 875 Square
Pavement Fabric
Pavement Fabric (02555/1.4 & 1.5) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CH 35 Net Ton (2,000
LB)
Bituminous Concrete Pavement
Bituminous Concrete Pavement Up to 30 TN per Work Request (02557/1.13) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CJ 88 Net Ton
Bituminous Concrete Pavement 30 to 165 TN per Work Request (02557/1.13) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CK 4,000 Net Ton
Bituminous Concrete Pavement Greater than 165 TN per Work Request (02557/1.13) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CL 88 Square
Spall Repair, Rapid Hardening
Spall Repair, Rapid Hardening (02580/1.4 & 1.5) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CM 900 Square
Spall Repair, Concrete
Spall Repair, Concrete (02580/1.4 & 1.5) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CN 4,350 Square
Fuel-Resistant Sealing
Fuel-Resistant Sealing (02584/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CP 4,500 Square
Coal-Tar Sealer/Rejuvenator
Coal-Tar Sealer/Rejuvenator (02585/1.14 & 1.15) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CQ 2,400 Linear
Field Molded Joint Sealing
Field Molded Joint Sealing, Jet Fuel Resistant, Up to 1/2-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CR 175 Linear
Field Molded Joint Sealing, Jet Fuel Resistant, Up to 3/4-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CS 175 Linear
Field Molded Crack Sealing
Field Molded Crack Sealing, Jet Fuel Resistant, Up to 1/2-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CT 175 Linear
Field Molded Crack Sealing, Jet Fuel Resistant, Up to 3/4-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CU 175 Linear
Preformed Elastomeric Joint Seal
Preformed Elastomeric Joint Seal Up to 1/2-Inch Joint Width (02593/1.9 & 1.10) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CV 88 Linear
Preformed Elastomeric Joint Seal Up to 5/8-Inch Joint Width (02593/1.9 & 1.10) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CW 875 Linear
Crack Sealing Bituminous Pavement
Crack Sealing Bituminous Pavement Up to 1/2-inch (02594/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CX 175 Square
Paint Removal
Paint Removal (02600/3.6.1 & 3.7.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CY 4,500 Square
Pavement Markings, Reflective
Pavement Markings, Reflective (02600/3.6.2 & 3.7.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001CZ 175 Square
Pavement Markings, Non-Reflective
Pavement Markings, Non-Reflective (02600/3.6.2 & 3.7.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001DA 700 Square
Topsoil
Topsoil (02660/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001DB 175 Square
Topsoiling
Topsoiling (02670/1.3 & 1.4) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001DC 900 Square
Seeding
Seeding (02680/1.3.1 & 1.4.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001DD 1,300 Square
Mulching
Mulching (02680/1.3.1 & 1.4.2) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001DE 1,750 Square
Sodding
Sodding (02680/1.3.1 & 1.4.3) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001DF 1,000 Hours Restricted Area Badge Holder/Escort
FFP
The purpose for this CLIN is to identify the responsibility of the contractor to provide an individual that has the capability to provide for escort responsibilities at the work site.
UNIT UNIT PRICE ESTIMATED AMOUNT
Option Year 1
FFP
Airfield & Heavy Duty Paving IDC Option Year 1 (1 Apr 2012 to 31 Mar 2013)
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AA 2,800 Square
Remove Existing Asphalt Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
MILSTRIP: F1Q3FQ1033A001
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AB 175,000 Square
Remove Existing Asphalt Pavement, Pavement Milling (02115/1.3 & 1.4)
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AC 2,800 Square
Remove Existing Concrete Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AD 8,700 Square
Remove Existing Concrete Pavement, Pavement Milling (02115/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AE 350 Linear
Saw Cutting, Asphalt Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AF 350 Linear
Saw Cutting, Concrete Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AG 15 Cubic
Remove Catch Basins, Manholes, and Drainage Pipe (02130/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AH 500 Linear
Silt Fence (02220/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AJ 900 Square
Stabilized Construction Entrance (02220/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AK 15 Each Storm Drain Inlet Protection
FFP
Storm Drain Inlet Protection (02220/1.3.3 & 1.4.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AL 280 Cubic
Earthwork Excavation (02225/1.3.1 &1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AM 500 Cubic
Borrow, Type C (02225/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AN 350 Square
Soil Stabilization Fabric (02231/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AP 900 Cubic
Crushed-Aggregate Sub-Base Course (02231/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AQ 900 Cubic
Graded-Crushed-Aggregate Base Course (02233/1.4.1 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AR 3,000 Square
Preparation of Existing Base Course (02233/1.4.2 & 1.5.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AS 1,500 Square
Soil Sterilization (02233/1.4.3 & 1.5.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AT 350 Cubic
Excavation and Backfill for Pipe Trenches (02310/ 1.2.1 & 1.3.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AU 350 Linear
Reinforced Concrete Pipe, 12-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AV 350 Linear
Reinforced Concrete Pipe, 15-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AW 350 Linear
Reinforced Concrete Pipe, 18-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AX 350 Linear
Reinforced Concrete Pipe, 24-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AY 350 Linear
Reinforced Concrete Pipe, 30-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AZ 150 Linear
Reinforced Concrete Pipe, 36-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BA 150 Linear
Reinforced Concrete Pipe, 42-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BB 150 Linear
Reinforced Concrete Pipe, 48-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BC 50 Linear
Reinforced Concrete Pipe, 54-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BD 50 Linear
Reinforced Concrete Pipe, 60-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BE 50 Linear
Reinforced Concrete Pipe, 66-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BF 50 Linear
Reinforced Concrete Pipe, 72-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BG 50 Linear
PVC Pipe, Schedule 80, 4-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BH 70 Linear
PVC Pipe, Schedule 80, 8-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BJ 70 Linear
PVC Pipe, Schedule 80, 12-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BK 70 Linear
PVC Pipe, Schedule 80, 16-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BL 70 Cubic
Concrete (Up to 75 CY per Work Request) (02513/1.3.11 & 1.3.2.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BM 1,800 Cubic
Concrete (Greater than 75 CY per Work Request) (02513/1.3.1.1 & 1.3.2.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BN 175 Each Dowels
FFP
Dowels (02513/1.3.1.6 & 1.3.2.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BP 175 Each Tie-Bars
FFP
Tie-Bars (02513/1.3.1.6 & 1.3.2.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BQ 10 Each Drainage Inlet, Type 1
FFP
Drainage Inlet, Type 1 (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BR 10 Each Drainage Inlet, Type 2
FFP
Drainage Inlet, Type 2 (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BS 10 Each Drainage Inlet, Type 3
FFP
Drainage Inlet, Type 3 (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BT 10 Each Manhole
FFP
Manhole (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BU 10 Each Drainage Inlet Adjustment
FFP
Drainage Inlet Adjustment (02525/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BV 10 Each Manhole Adjustment
FFP
Manhole Adjustment (02525/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BW 10 Each Drainage Inlet Casting
FFP
Drainage Inlet Casting (02525/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BX 10 Each Manhole Casting
FFP
Manhole Casting (02525/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BY 10 Each Water Valve Box Adjustment
FFP
Water Valve Box Adjustment (02525/1.5.3 & 1.6.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BZ 2 Each Drainage Inlet & Manhole Frame Extension
FFP
Drainage Inlet and Manhole Frame Extension (02525/1.5.4 & 1.6.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CA 2 Each Water Valve Box Extension Ring
FFP
Water Valve Box Extension Ring (02525/1.5.4 & 1.6.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CB 70 Cubic
Concrete for Concrete Structures (02530/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CC 3,500 Pound Reinforcement for Concrete Structures
FFP
Reinforcement for Concrete Structures (02530/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CD 350 Square
Welded Steel Wire Fabric, 6x6 (02540/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CE 10,000 Square
Cracking and Seating Concrete Pavement (02550/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CF 10 Each Ground Rod/Tie-Down Anchor
FFP
Ground Rod/Tie-Down Anchor (02552/1.6 & 1.7) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CG 1,750 Square
Pavement Fabric (02555/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CH 70 Net Ton
Bituminous Concrete Pavement Up to 30 TN per Work Request (02557/1.13) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CJ 175 Net Ton
Bituminous Concrete Pavement 30 to 165 TN per Work Request (02557/1.13) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CK 8,000 Net Ton
Bituminous Concrete Pavement Greater than 165 TN per Work Request (02557/1.13) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CL 175 Square
Spall Repair, Rapid Hardening (02580/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CM 1,800 Square
Spall Repair, Concrete (02580/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CN 8,700 Square
Fuel-Resistant Sealing (02584/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CP 9,000 Square
Coal-Tar Sealer/Rejuvenator (02585/1.14 & 1.15) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CQ 4,800 Linear
Field Molded Joint Sealing, Jet Fuel Resistant, Up to 1/2-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CR 350 Linear
Field Molded Joint Sealing, Jet Fuel Resistant, Up to 3/4-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CS 350 Linear
Field Molded Crack Sealing, Jet Fuel Resistant, Up to 1/2-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CT 350 Linear
Field Molded Crack Sealing, Jet Fuel Resistant, Up to 3/4-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CU 350 Linear
Preformed Elastomeric Joint Seal Up to 1/2-Inch Joint Width (02593/1.9 & 1.10) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CV 175 Linear
Preformed Elastomeric Joint Seal Up to 5/8-Inch Joint Width (02593/1.9 & 1.10) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CW 1,750 Linear
Crack Sealing Bituminous Pavement Up to 1/2-inch (02594/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CX 350 Square
Paint Removal (02600/3.6.1 & 3.7.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CY 9,000 Square
Pavement Markings, Reflective (02600/3.6.2 & 3.7.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001CZ 350 Square
Pavement Markings, Non-Reflective (02600/3.6.2 & 3.7.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001DA 1,400 Square
Topsoil (02660/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001DB 350 Square
Topsoiling (02670/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001DC 1,800 Square
Seeding (02680/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001DD 2,600 Square
Mulching (02680/1.3.1 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001DE 3,500 Square
Sodding (02680/1.3.1 & 1.4.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001DF 4,000 Hours Restricted Area Badge Holder/Escort
FFP
The purpose for this CLIN is to identify the responsibility of the contractor to provide an individual that has the capability to provide for escort responsibilities at
UNIT UNIT PRICE ESTIMATED AMOUNT
Option Year 2
FFP
Airfield & Heavy Duty Paving IDC Option Year 2 (1 Apr 2013 to 31 Mar 2014)
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AA 2,800 Square
Remove Existing Asphalt Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AB 175,000 Square
Remove Existing Asphalt Pavement, Pavement Milling (02115/1.3 & 1.4)
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AC 2,800 Square
Remove Existing Concrete Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AD 8,700 Square
Remove Existing Concrete Pavement, Pavement Milling (02115/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AE 350 Linear
Saw Cutting, Asphalt Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AF 350 Linear
Saw Cutting, Concrete Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AG 15 Cubic
Remove Catch Basins, Manholes, and Drainage Pipe (02130/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AH 500 Linear
Silt Fence (02220/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AJ 900 Square
Stabilized Construction Entrance (02220/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AK 15 Each Storm Drain Inlet Protection
FFP
Storm Drain Inlet Protection (02220/1.3.3 & 1.4.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AL 280 Cubic
Earthwork Excavation (02225/1.3.1 &1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AM 500 Cubic
Borrow, Type C (02225/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AN 350 Square
Soil Stabilization Fabric (02231/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AP 900 Cubic
Crushed-Aggregate Sub-Base Course (02231/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AQ 900 Cubic
Graded-Crushed-Aggregate Base Course (02233/1.4.1 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AR 3,000 Square
Preparation of Existing Base Course (02233/1.4.2 & 1.5.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AS 1,500 Square
Soil Sterilization (02233/1.4.3 & 1.5.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AT 350 Cubic
Excavation and Backfill for Pipe Trenches (02310/ 1.2.1 & 1.3.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AU 350 Linear
Reinforced Concrete Pipe, 12-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AV 350 Linear
Reinforced Concrete Pipe, 15-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AW 350 Linear
Reinforced Concrete Pipe, 18-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AX 350 Linear
Reinforced Concrete Pipe, 24-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AY 350 Linear
Reinforced Concrete Pipe, 30-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AZ 150 Linear
Reinforced Concrete Pipe, 36-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BA 150 Linear
Reinforced Concrete Pipe, 42-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BB 150 Linear
Reinforced Concrete Pipe, 48-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BC 50 Linear
Reinforced Concrete Pipe, 54-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BD 50 Linear
Reinforced Concrete Pipe, 60-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BE 50 Linear
Reinforced Concrete Pipe, 66-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BF 50 Linear
Reinforced Concrete Pipe, 72-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BG 50 Linear
PVC Pipe, Schedule 80, 4-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BH 70 Linear
PVC Pipe, Schedule 80, 8-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BJ 70 Linear
PVC Pipe, Schedule 80, 12-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BK 70 Linear
PVC Pipe, Schedule 80, 16-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BL 70 Cubic
Concrete (Up to 75 CY per Work Request) (02513/1.3.11 & 1.3.2.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BM 1,800 Cubic
Concrete (Greater than 75 CY per Work Request) (02513/1.3.1.1 & 1.3.2.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BN 175 Each Dowels
FFP
Dowels (02513/1.3.1.6 & 1.3.2.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BP 175 Each Tie-Bars
FFP
Tie-Bars (02513/1.3.1.6 & 1.3.2.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BQ 10 Each Drainage Inlet, Type 1
FFP
Drainage Inlet, Type 1 (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BR 10 Each Drainage Inlet, Type 2
FFP
Drainage Inlet, Type 2 (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BS 10 Each Drainage Inlet, Type 3
FFP
Drainage Inlet, Type 3 (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BT 10 Each Manhole
FFP
Manhole (02520/1.4 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BU 10 Each Drainage Inlet Adjustment
FFP
Drainage Inlet Adjustment (02525/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BV 10 Each Manhole Adjustment
FFP
Manhole Adjustment (02525/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BW 10 Each Drainage Inlet Casting
FFP
Drainage Inlet Casting (02525/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BX 10 Each Manhole Casting
FFP
Manhole Casting (02525/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BY 10 Each Water Valve Box Adjustment
FFP
Water Valve Box Adjustment (02525/1.5.3 & 1.6.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BZ 2 Each Drainage Inlet & Manhole Frame Extension
FFP
Drainage Inlet and Manhole Frame Extension (02525/1.5.4 & 1.6.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CA 2 Each Water Valve Box Extension Ring
FFP
Water Valve Box Extension Ring (02525/1.5.4 & 1.6.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CB 70 Cubic
Concrete for Concrete Structures (02530/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CC 3,500 Pound Reinforcement for Concrete Structures
FFP
Reinforcement for Concrete Structures (02530/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CD 350 Square
Welded Steel Wire Fabric, 6x6 (02540/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CE 10,000 Square
Cracking and Seating Concrete Pavement (02550/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CF 10 Each Ground Rod/Tie-Down Anchor
FFP
Ground Rod/Tie-Down Anchor (02552/1.6 & 1.7) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CG 1,750 Square
Pavement Fabric (02555/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CH 70 Net Ton
Bituminous Concrete Pavement Up to 30 TN per Work Request (02557/1.13) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CJ 175 Net Ton
Bituminous Concrete Pavement 30 to 165 TN per Work Request (02557/1.13) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CK 8,000 Net Ton
Bituminous Concrete Pavement Greater than 165 TN per Work Request (02557/1.13) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CL 175 Square
Spall Repair, Rapid Hardening (02580/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CM 1,800 Square
Spall Repair, Concrete (02580/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CN 8,700 Square
Fuel-Resistant Sealing (02584/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CP 9,000 Square
Coal-Tar Sealer/Rejuvenator (02585/1.14 & 1.15) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CQ 4,800 Linear
Field Molded Joint Sealing, Jet Fuel Resistant, Up to 1/2-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CR 350 Linear
Field Molded Joint Sealing, Jet Fuel Resistant, Up to 3/4-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CS 350 Linear
Field Molded Crack Sealing, Jet Fuel Resistant, Up to 1/2-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CT 350 Linear
Field Molded Crack Sealing, Jet Fuel Resistant, Up to 3/4-Inch Joint Width (02592/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CU 350 Linear
Preformed Elastomeric Joint Seal Up to 1/2-Inch Joint Width (02593/1.9 & 1.10) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CV 175 Linear
Preformed Elastomeric Joint Seal Up to 5/8-Inch Joint Width (02593/1.9 & 1.10) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CW 1,750 Linear
Crack Sealing Bituminous Pavement Up to 1/2-inch (02594/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CX 350 Square
Paint Removal (02600/3.6.1 & 3.7.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CY 9,000 Square
Pavement Markings, Reflective (02600/3.6.2 & 3.7.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001CZ 350 Square
Pavement Markings, Non-Reflective (02600/3.6.2 & 3.7.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001DA 1,400 Square
Topsoil (02660/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001DB 350 Square
Topsoiling (02670/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001DC 1,800 Square
Seeding (02680/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001DD 2,600 Square
Mulching (02680/1.3.1 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001DE 3,500 Square
Sodding (02680/1.3.1 & 1.4.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001DF 4,000 Hours Restricted Area Badge Holder/Escort
FFP
The purpose for this CLIN is to identify the responsibility of the contractor to provide an individual that has the capability to provide for escort responsibilities at
UNIT UNIT PRICE ESTIMATED AMOUNT
Option Year 3
FFP
Airfield & Heavy Duty Paving IDC Option Year 3 (1 Apr 2014 to 31 Mar 2015)
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AA 2,800 Square
Remove Existing Asphalt Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AB 175,000 Square
Remove Existing Asphalt Pavement, Pavement Milling (02115/1.3 & 1.4)
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AC 2,800 Square
Remove Existing Concrete Pavement, Full Depth (02110/1.8.1 & 1.9.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AD 8,700 Square
Remove Existing Concrete Pavement, Pavement Milling (02115/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AE 350 Linear
Saw Cutting, Asphalt Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AF 350 Linear
Saw Cutting, Concrete Pavement (02110/1.8.3 & 1.9.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AG 15 Cubic
Remove Catch Basins, Manholes, and Drainage Pipe (02130/1.4 & 1.5) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AH 500 Linear
Silt Fence (02220/1.3.1 & 1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AJ 900 Square
Stabilized Construction Entrance (02220/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AK 15 Each Storm Drain Inlet Protection
FFP
Storm Drain Inlet Protection (02220/1.3.3 & 1.4.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AL 280 Cubic
Earthwork Excavation (02225/1.3.1 &1.4.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AM 500 Cubic
Borrow, Type C (02225/1.3.2 & 1.4.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AN 350 Square
Soil Stabilization Fabric (02231/1.5.1 & 1.6.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AP 900 Cubic
Crushed-Aggregate Sub-Base Course (02231/1.5.2 & 1.6.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AQ 900 Cubic
Graded-Crushed-Aggregate Base Course (02233/1.4.1 & 1.5.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AR 3,000 Square
Preparation of Existing Base Course (02233/1.4.2 & 1.5.2) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AS 1,500 Square
Soil Sterilization (02233/1.4.3 & 1.5.3) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AT 350 Cubic
Excavation and Backfill for Pipe Trenches (02310/ 1.2.1 & 1.3.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AU 350 Linear
Reinforced Concrete Pipe, 12-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AV 350 Linear
Reinforced Concrete Pipe, 15-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AW 350 Linear
Reinforced Concrete Pipe, 18-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AX 350 Linear
Reinforced Concrete Pipe, 24-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AY 350 Linear
Reinforced Concrete Pipe, 30-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AZ 150 Linear
Reinforced Concrete Pipe, 36-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BA 150 Linear
Reinforced Concrete Pipe, 42-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BB 150 Linear
Reinforced Concrete Pipe, 48-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BC 50 Linear
Reinforced Concrete Pipe, 54-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BD 50 Linear
Reinforced Concrete Pipe, 60-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BE 50 Linear
Reinforced Concrete Pipe, 66-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BF 50 Linear
Reinforced Concrete Pipe, 72-Inch (02410/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BG 50 Linear
PVC Pipe, Schedule 80, 4-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BH 70 Linear
PVC Pipe, Schedule 80, 8-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BJ 70 Linear
PVC Pipe, Schedule 80, 12-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BK 70 Linear
PVC Pipe, Schedule 80, 16-Inch (02420/1.3 & 1.4) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BL 70 Cubic
Concrete (Up to 75 CY per Work Request) (02513/1.3.11 & 1.3.2.1) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BM 1,800 Cubic
Concrete (Greater than 75 CY per Work Request) (02513/1.3.1.1 & 1.3.2.1) FOB: Destination
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .