Att J-14 Underground Utilities Seed Project Questions 01 Rev 01.pdf
PDF 90 KB Posted
- Attached to
- FY25 Underground Utilities IDIQ Federal contract opportunity
- Solicitation number
- FA448424R0026
About this file
This document is a Questions and Answers (Q&A) addendum for the Underground Utilities Solicitation (FA448424R0026) related to a seed project. The Q&A addresses technical and procedural details for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for underground utilities work at JB MDL NJ. Key details include clarifications on bid bond requirements (20% of proposal price or not to exceed $3M), past performance submission guidelines, and specific technical specifications for the project. Technical questions cover soil reuse for backfill, pipe bedding and restoration details, water meter sizing, existing water service line removal, and specific construction requirements such as HMA restoration (8" DGA, 6" HMA base course, 3" HMA surface course). The document confirms no NJDEP permit is required, and provides precise measurements for various project components, including a 50 LF water service line outside the airfield fence and a 30 LF distance from the new water meter to electrical service connection.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA448424R0026
Underground Utilities Solicitation and Seed Project Questions – Part 2
On Form 1442, Section 13.a. indicates an offer guarantee is required. For the Bid Bond Form SF-24, Box 5a addresses the Penal Sum of Bond. Since the job is IDIQ,
i. What “Percent of the Bid Price” is required?
ii. Is there an “Amount not to Exceed”?
20% of the proposal price or Not to exceed $3M whichever is lower.
As per Attachment J-7, Page 4, L-2.2.2 Volume II- Past Performance:
a. L-2.2.2.1 Past Performance Information: Please clarify if we are required to “Submit original and one
(1) copy" with our email proposal or will one copy suffice?
Just the original in the email.
b. L-2.2.2.4 Performance Surveys-
i. Can these surveys be for Past and/or Present Project?
Both.
i. Please clarify these are to be submitted by the Offeror.
By the requirement owner or customer. Not the offeror.
ii. Should these be for projects referenced on the “Performance Questionnaires”?
If you want.
b. L-2.2.2.4 Performance Questionnaires-
i. Can these surveys be for Past and/or Present
Project?
Both.
ii. Confirm these will be submitted by the Rater directly to the Owners POC’s.
By the requirement owner or customer. Not the offeror.
Is the onsite / excavated soil expected to be reused as suitable backfill material?
Yes, on site excavated material is expected to be used as suitable backfill material. The contractor shall refer to backfill/bedding detail on sheet T-3 of the IDIQ drawing set.
Is there a specific pipe bedding and backfill detail or requirements?
Pipe bedding and backfill details are shown on sheet T- 3 of the IDIQ drawing set.
Is there a specific asphalt restoration detail or requirements?
HMA Restoration detail is shown on sheet T-3 of the IDIQ drawing set. For bidding purposes, contractors shall assume 8” of DGA, 6” of HMA base course (19M64) and 3” of HMA surface course (12.5M64).
Is a DEP permit needed for this project? As the length of water main is under 3,000 LF, no NJDEP permit is required.
Is the size of the water meter required to be 2"? As per sheet C-1 of the contract plans, the water meter shall be sized to match the existing pipe diameter.
Included reference drawings indicate that the existing water service line is 2”. The contractor shall verify size of the service line prior to ordering the water meter.
Are any of the water mains to be removed in this project Asbestos cement pipe?
Task 3 requires removing the existing fire service line.
Reference drawings indicate the line a 6” ductile iron pipe.
How long is the current water service to be removed outside of the airfield fence?
The length outside of the airfield fence is approximately 50 LF. The contractor shall verify in the field.
What is the approximate distance from the new water meter to the electrical service connection for AMRS wire?
The approximate distance is 30 LF.