13R0102-0002 Atch 1 Task Description

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Base Buildings, newest first.
File Type Posted
Questions__ _Answers__2-15_May_13.pdf PDF
1-7_13R0102-0002_Atch_1_SPECS_Section_02_41_00_DEMOLITION_08_APR_13.pdf PDF
1-8_13R0102-0002_Atch_1_SPECS_Section_02_61_13 _EXCAVATION_AND_HANDLING_OF_CONTAMINATED_MATERIAL_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_01_56_00_para_3.14.2_Attachment_2_MAP.pdf PDF
2-0_13R0102-0002_Atch_1_SPECS_Section_02_82_16.00_20 _ENGINEERING_CONTROL_OF_ASBESTOS_CONTAINING_MATERIALS_08_APR_13.pdf PDF
1-2_13R0102-0002_Fill-In_Section_B_thru_K.doc DOC document
1-0_13R0102-0002_Amendment_2_DEMO_IDC.pdf PDF
2-2_13R0102-0002_Atch_1_SPECS_Section_03_30_00 _CAST-IN-PLACE_CONCRETE_08_APR_13.pdf PDF
2-8_13R0102-0002_Questions__ _Answers_1_dated_06_May_13.pdf PDF
1-4_13R0102-0002_Atch_1_SPECS_Section_01000_GENERAL_REQUIREMENTS_08_APR_13.pdf PDF
1-1_13R0102-0002_DEMO_Conformed_Solicitation.pdf PDF
2-4_13R0102-0002_Atch_1_SPECS_Section_32_12_16_HOT-MIX_ASPHALT_(HMA)_FOR_ROADS_08_APR_13.pdf PDF
2-1_13R0102-0002_Atch_1_SPECS_Section_02_82_33.13_20 _REMOVAL_CONTROL_AND_DISPOSAL_OF_PAINT_WITH_LEAD_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_01_56_00_para_3.14.2_Attachment_1_Temporary_Staging_of_Contaminated_Soil.pdf PDF
2-7_13R0102-0002_Atch_3_Wage_Determination_Applicability.pdf PDF
1-5_13R0102-0002_Atch_1_SPECS_Section_01_33_00 _SUBMITAL_PROCEDURES_08_APR_13.pdf PDF
2-5_13R0102-0002_Atch_1_SPECS_Section_32_92_19_SEEDING_08_APR_13.pdf PDF
1-3_13R0102-0002_Atch_1_SPECS_COVER_and_INDEX_08_APR_13.pdf PDF
2-3_13R0102-0002_Atch_1_SPECS_Section_32_12_10_BITUMINOUS_TACK_ _PRIME_COATS_08_APR_13.pdf PDF
1-9_13R0102-0002_Atch_1_SPECS_Section_02_65_00 _UNDERGROUND_STORAGE_TANK_REMOVAL_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_Section_01_56_00 _ENVIRONMENTAL_GENERAL_REQUIREMENTS_08_APR_13.pdf PDF
Demo-_Amendment_01-14_Mar_13.pdf PDF
Demo-SV-PPConference-12Mar13.pdf PDF
0-7_FA4427-13R0102_Atch_1_SPECS_Section_02_65_00.doc DOC document
1-1_FA4427-13R0102_Atch_5_Past_Perf_Ltr-Questionnaire.doc DOC document
1-0_FA4427-13R0102_Atch_3_Wage_Determination_Applicability.doc DOC document
0-2_FA4427-13R0102_Atch_1_SPECS_COVER_and_INDEX.doc DOC document
0-6_FA4427-13R0102_Atch_1_SPECS_Section_02_41_00.doc DOC document
0-3_FA4427-13R0102_Atch_1_SPECS_SECT_01000_-_GENERAL_REQUIREMENTS_30_JAN_13.doc DOC document
0-0_FA4427-13R0102_DEMO_IDC_SOLICITATION.pdf PDF
0-5_FA4427-13R0102_Atch_1_SPECS_Section_01_56_00.doc DOC document
1-2_FA4427-13R0102_Atch_6_Subcontractor_Consent_Form.doc DOC document
0-8_FA4427-13R0102_Atch_1_SPECS_02_82_16.00_20.doc DOC document
0-4_FA4427-13R0102_Atch_1_SPECS_Section_01_33_00.doc DOC document
0-9_FA4427-13R0102_Atch_1_SPECS_02_82_33.13_20.doc DOC document
0-1_FA4427-13R0102_FILL_IN_Section_B_thru_K.doc DOC document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4427-13-R-0102-0002

Demo IDC TASK LIST

Atch #1

30 APR 2013

TASK FOR FACILITY DEMOLITION IDC

Provide all equipment, labor and materials to complete the demolition project in accordance with contract plans, specifications, and all applicable laws, codes and regulations for Items 0001AA –

0015AN

Task # 1, Building Demolition, Not include Foundation & Footing:

It includes equipment and labor to the demolition of everything above the concrete floor slab. Dispose all debris off base. This contract includes handling or disposal of hazardous materials.

0001AA, Steel/Metal Building: Demo existing facility built with steel/metal roof, steel/metal exterior/interior walls, steel and doors steel. Price is per Cubic Foot (Bldg H x W x L)

0001AB, Reinforced Concrete Building: Demo existing facility built with reinforced concrete roof, exterior/interiors walls. Price is per Cubic Foot (Bldg H x W x L)

0001AC, Masonry Building: Demo existing facility built with masonry exterior/interior walls. Price is per Cubic Foot (Bldg H x W x L)

0001AD, Wood Building: Demo existing facility built with wooden exterior/interior walls. Price is per Cubic Foot (Bldg H x W x L)

0001AE, Demolition of Roof: Demo wooden decking roof with metal/wooden rafters. Price is per Square Foot

Task # 2, Demolitions of Footing & Foundation:

It includes equipment and labor to the demolition of concrete slab, footing and disposal the debris off base.

0002AA, Reinforce Concrete Slab on Grade: Demo existing reinforced concrete slab on grade. Price is per Cubic Foot (L x W x Thickness)

0002AB, Reinforced Concrete Spread Footing, 1’ thick, 2’ wide: Demo existing reinforced concrete spread footing. Price is per Linear Foot

0002AC, Reinforced Concrete Spread Footing, 1’- 6” thick, 2’ wide: Demo existing reinforced concrete spread footing. Price is per Linear Foot

0002AD, Reinforced Concrete Spread Footing, 1’- 6” thick, 3’ wide: Demo existing reinforced concrete spread footing. Price is per Linear Foot

0002AE, Reinforced Concrete Spread Footing, 2’ thick, 2’ wide: Demo existing reinforced concrete spread footing. Price is per Linear Foot

Task # 3, Remove Pavement and Curb:

It includes equipment and labor to the removal of existing AC/concrete pavement and disposal of debris off base.

0003AA, Reinforced Concrete Pavement: Demo existing reinforced concrete pavement. Price is per Cubic Yard (L x W x Thickness)

0003AB, Asphalt Concrete Pavement: Demo existing asphalt concrete pavement. Price is per Cubic Yard (L x W x Thickness)

0003AC, Concrete Curb & Gutter: Demo existing concrete curb & gutter. Price is per Linear Foot

0003AD, Saw-Cut Concrete Pavement 3”-5”: Saw-cut existing concrete pavement. Price is per Linear Foot

30 APR 2013

0003AE, Saw-Cut Asphalt Concrete Pavement: Saw-cut existing asphalt concrete pavement. Price is per Cubic Yard (L x W x Thickness)

0003AF, Un-reinforced Concrete Pavement: Demo existing reinforced concrete pavement. Price is per Cubic Yard (L x W x Thickness)

Task # 4, Remove Manhole & Catch Basin:

It includes equipment, labor and materials to the removal of existing manhole & catch basin and caps storm or sewer pipe. Dispose all debris off base.

0004AA, 4 FT to 8 FT Deep Manhole or Catch Basin: Demo existing manhole or catch basin from 4Ft to 8Ft deep. Price is per Each

0004AB, Over 8 FT deep Manhole or Catch Basin: Demo existing manhole or catch basin over 8Ft deep. Price is per Each

Task # 5, Remove Fire Hydrant:

It includes equipment and labor to the removal of fire hydrant assembly, bollards and cap the water line. Dispose the debris off base.

0005AA, Fire Hydrants: Demo fire hydrants assembly without bollards. Price is per Each

0005AB, Fire Hydrants: Demo fire hydrants assembly with bollards. Price is per Each

Task # 6, Remove Steel Guard Rail:

It includes equipment and labor to the removal of steel guard rail and disposition of debris off base. It does not include the LBP abatement of flaking paint which covered under task 14.

0006AA, Steel Guard Rail: Demo steel guard rail. Price is Linear Foot

Task # 7, Remove Underground Water/Sewer Pipe and Appurtenances (exclude excavation):

It includes equipment and labor to the removal of pipes and disposition of debris off base. Soil excavation and site restoration will be covered under task 11 and task 12.

0007AA, Underground Water/Sewer Pipe less than 7” diameter: Demo Underground Water/Sewer Pipe and Appurtenances (exclude excavation). Price is per Linear Foot

0007AB, Underground Water/Sewer Pipe 7” – 12” diameter: Demo Underground Water/Sewer Pipe and Appurtenances (exclude excavation). Price is per Linear Foot

0007AC, Underground Water/Sewer Pipe 13” – 24” diameter: Demo Underground Water/Sewer Pipe and Appurtenances (exclude excavation). Price is per Linear Foot

0007AD, Underground Water/Sewer Pipe above 25” diameter: Demo Underground Water/Sewer Pipe and Appurtenances (exclude excavation). Price is per Linear Foot

0007AE, Underground Utility Termination: Existing underground water/sewer pipe shall be cap 5 feet away from structure, provide marker with identification. Price per Each

Task # 8, Demolition Fence up to 8 FT high:

It includes equipment and labor to the demolition of fence and footing and disposition of debris off base.

0008AA, Wood Fence: Demo existing wood fence. Price per Linear Foot

0008AB, Chain Link Fence: Demo existing chain link fence. Price per Linear Foot

30 APR 2013

0008AC, CMU 8” Thick Fence: Demo existing CMU 8” thick fence. Price per Square Foot

Task # 9, Remove Underground Storage Tank:

It includes equipment and labor to the removal of underground storage tank and disposition of debris off base. It does not include removal of sludge, water and remaining product from tank which is covered under task 10.

0009AA, Underground Storage Tank 3000 – 5000 Gallon: Demo existing underground storage tank located one to 3 feet below ground. Price per Each

0009AB, Underground Storage Tank 6000 – 8000 Gallon: Demo existing underground storage tank located one to three ft below ground. Price per Each

0009AC, Underground Storage Tank 9000 – 12000 Gallon: Demo existing underground storage tank located one to three ft below ground. Price per Each

Task # 10, Remove Sludge, Water and Remaining Product from Tank:

It includes equipment and labor to the removal of sludge and other product from tank and disposition the debris off base.

0010AA, Underground Storage Tank 3000 – 5000 Gallon: Remove sludge, water and remaining product from existing underground storage tank. Price per Each

0010AB, Underground Storage Tank 6000 – 8000 Gallon: Remove sludge, water and remaining product from existing underground storage tank. Price per Each

0010AC, Underground Storage Tank 9000 – 12000 Gallon: Remove sludge, water and remaining product from existing underground storage tank. Price per Each

0010AD, Dewatering During UST Removal: Price is per Day

Task # 11, Excavation and Disposition of Contaminated and non-contaminated Soil:

It includes equipment and labor to the excavation and disposition of contaminated and non-contaminated soil off base. Price per Cubic Foot

0011AA, Excavation and Disposition of Contaminated Soil off Base utilizing A classification: Excavate and remove contaminated soil off base with “A” Classification. Price per Cubic Yard

0011AB, Excavation and Disposition of Contaminated Soil off Base utilizing B classification: Excavate and remove contaminated soil off base with “B” Classification. Price per Cubic Yard

0011AC, Excavation and Disposition of Contaminated Soil Off Base utilizing C classification: Excavate and remove contaminated soil off base with “C” Classification. Price per Cubic Yard

0011AD, Excavation and Disposition of Non-Contaminated Soil off Base: Excavate and remove non-contaminated soil off base. Price per Cubic Yard

Task # 12, Site Restoration:

It includes equipment, labor and materials to the site restoration of the demolition area with 90% compaction on base course.

0012AA, General Fill/Spread Materials: Restore site to conform to existing grade to prevent site from water pooling. Price per Cubic Yard

0012AB, Hydro Seeding/Spread Materials: Restore site by hydro seeding to include seed and fertilizer. Price per Cubic Yard

30 APR 2013

0012AC, Trench Excavation for Underground Pipe Removal: Restore site and backfill with approved imported materials and conform to existing grade to prevent site from water pooling at 4 ft or less depth. Price per Cubic Yard

0012AD, Trench Backfill with Imported Materials, Include Compaction: Restore site and backfill with approved imported materials, compacted to 90% and conform to existing grade to prevent site from water pooling at 4 ft or less depth. Price per Cubic Yard

0012AD, Asphalt Cement Paving: Restore site using asphalt cement concrete pavement and conform to existing grade, prevent site from water pooling. Price per Cubic TON

0012AE, Portland Cement Concrete: Restore site using Portland Cement Concrete and conform existing grade, prevent site from water pooling. Price per Cubic Yard

Task # 13, Sample Test:

It includes equipment and labor to conduct sample taking, transporting sample to independent Laboratory and cost for testing and result. Submit laboratory test result to Contracting Officer.

0013AA, Asbestos Testing: Prior to demo existing facility an asbestos test sample is required. Transport sample to independent laboratory for testing and submit test result to Contracting Officer. Price per Each.

0013AB, Lead Base Paint Testing: Prior to demo existing facility a Lead Base Paint test sample is required.

Transport sample to independent laboratory for testing and submit test result to Contracting Officer. Price per Each.

Task # 14, Remove Lead-Based Paint If It Is Flaking:

It includes equipment, labor and materials for the removal of flaking lead-based paint and disposal of debris off base.

0014AA, Baseboard: Remove existing baseboard with flaking lead base paint and dispose off base. Price Linear Foot

0014AB, Cabinets: Remove existing cabinets with flaking lead base paint and dispose off base. Price Linear Foot

0014AC, Door: Remove existing door with flaking lead base paint and dispose off base. Price Linear Foot

0014AD, Pipes, up to 4” diameter: Remove existing pipe up to 4” diameter with flaking lead base paint and dispose off base. Price Linear Foot

0014AE, Pipes 4” to 8” diameter: Remove existing pipe 4” to 8” diameter with flaking lead base paint and dispose off base. Price Linear Foot

0014AF, Windows, up to 30” W x 60” H: Remove existing flaking lead based paint off of ground floor windows sized up to 30” x 60” and dispose off base. Price per Each

0014AG, Windows, up to 36” W x 72” H: Remove existing flaking lead based paint off of ground floor windows sized up to 36” x 72” and dispose off base. Price per Each

0014AH, Windows, up to 40” W x 80” H: Remove existing flaking lead based paint off of ground floor windows sized up to 40” x 80” and dispose off base. Price per Each

0014AJ, Siding: Remove existing siding with flaking lead base paint and dispose off base. Price per Square Foot

Task # 15, Asbestos Removal:

It includes equipment, labor and materials to the removal of asbestos and disposition the debris off base.

0015AA, Boiler Insulation: Remove existing boiler insulation with asbestos and dispose off base. Price per Square Foot

30 APR 2013

0015AB, Duct or AHU Insulation: Remove existing duct or AHU insulation with asbestos and dispose off base.

Price per Square Foot

0015AC, Pipe Insulation up to 4” diameter: Remove existing pipe insulation up to 4” diameter with asbestos and dispose off base. Price per Linear Foot

0015AD, Pipe Insulation 4” to 8” diameter: Remove existing pipe insulation 4” to 8” diameter with asbestos and

0015AE, Pipe Insulation 8” to 12” diameter: Remove existing pipe insulation 8” to 12” diameter with asbestos and

0015AF, Pipe Insulation over 12” diameter: Remove existing pipe insulation over 12” diameter with asbestos and dispose off base. Price per Square Foot

0015AG, VAT & mastic on Floor: Remove existing VAT & mastic on floor with asbestos and dispose off base.

Price per Square Foot

0015AH, Cement-Asbestos Transited Board: Remove existing cement-asbestos transited board with asbestos and dispose off base. Price per Square Foot

0015AJ, Transited Shingle Siding: Remove existing transited shingle siding with asbestos and dispose off base.

Price per Square Foot

0015AK, Built-up Roof, non-friable: Remove existing built-up roof, non-friable with asbestos and dispose off base.

Price per Square Foot

0015AL, Duct Vibration Joint, up to 24 Square Inches Duct: Remove existing duct vibration joint, up to 24 square inches duct with asbestos and dispose off base. Price per Each

0015AM, Duct Vibration Joint, up to 25 Square Inches to 48 Square Inches Duct: Remove existing duct vibration joint, up to 24 square inches to 48 square inches duct with asbestos and dispose off base. Price per Each

0015AN, Duct Vibration Joint, up to 49 Square Inches to 76 Square Inches Duct: Remove existing duct vibration joint, up to 49 square inches to 76 square inches duct with asbestos and dispose off base. Price per Each