FA4427-13-R-0102 Demolition of Base Buildings Questions and Answers #1 06 May 2013
FA4427-13-R-0102-0002
Demolition of Base Buildings
QUESTIONS and ANSWERS #1 6 May 2013
1. Question: Schedule B, Item 0011AA Excavation and Disposition of Contaminated soil off Base? Disposal of contaminated soil has 3 classifications A, B, and C, what classification do we use to determine the cost of soil disposal.
Answer: See Price Book and Task List dated 30 Apr 13.
2. Question: Division 1 Section 01 56 00 Environmental General Requirements calls out for all PSB ballasts, florescent tubes, Light Bulbs, batteries, mercury switches & thermostats. To be removed but the items are not listed on the schedule B?
Answer: See Task List item 0001 dated 30 Apr 13 and Section 01000, para 1.2 dated 08 Apr 13.
3. Question: 0012AB Hydro seeding, including Seed and Fertilizer. Can Travis AFB supply a Hydro-Seed Spec.?
Answer: See Specifications Section 32 92 19 dated 08 Apr 13.
4. Question: Schedule B Abatement. Due to the age of the buildings at Travis there is a high possibility that the buildings contain ACM sheetrock joint compound and window sealant but there is not a line item on the schedule B for those items.
Answer: See Task List dated 30 Apr 13 items #13 and #15.
5. Question: Demolition Section 02 41 00 page 7 Para. 3.1.2.2 Disconnecting existing utilities.
Spec calls out to terminate existing utilities. Schedule B has a line item for pipe removal but not for utility termination.
Answer: See Price Book dated 30 Apr 13 item 0007AE and Task List dated 30 Apr 2013.
6. Question: Will Travis AFB provide As-built drawings of buildings to be demolished?
Answer: When DO/TO are issued, as-builts, if available will be provided.
7. Question: Is there access to water for dust control on Demolition Site?
Answer: See Specification Section 01000, para 1.4 dated 08 Apr 13.
8. Question: SF 1442, block 13B requires An Offer Warranty-what is the amount of the Warranty?, $5 Million.
Answer: Reference Solicitation, Section H, page 25 of 74, and clause FAR 52.228-1 entitled Proposal Guarantee (Bid Bond) for bid bond information.
9. Question: May we have access to the sign in sheet?
Answer: Site visit/Pre-Proposal attendance sheet uploaded to FBO.gov.
10. Question: Regarding Demolition Plans – the specs call out for a structural PE; if the structures are less than 80'h, can a CA licensed Civil PE provide this service?
Answer: See Specifications Section 02 41 00, para 1.2.1 dated 08 Apr 13.
11. Question: Regarding SWPPP – based on the uncertainty as to how/when SWPPPs will be applicable (i.e. size of each task order, etc.), how will SWPPP-related tasks be accounted for in the bid sheet?
Answer: SWPP costs are to be included in each applicable Task List and Price Book Item as an overhead element. See Specification Section 01 56 00, para 3.4.6.3 dated 08 Apr 13.
12. Question: Regarding SWPPP – Can we have access to the Travis SWPPP plan (to be used for <1 acre sites)?
Answer: Refer to Question #1 and Specifications Section 01 56 00, para 3.4.7 dated 08 Apr 13.
13. Question: Regarding Asbestos - May we have access to the Travis-wide Asbestos Management Plan?
Answer: See Specifications Section 01 56 00, para 3.1.3.1. dated 08 Apr 13.
14. Question: Regarding Asbestos - the bid items for Asbestos are extremely limited. For example, it does not include wall systems such as sheetrock assembly (gyp board, taping mud, skim coat, etc.). The specifications state that these materials have not been sampled.
How will this be addressed?
Answer: See Specifications Section 01 56 00, para 3.1.3 dated 08 Apr 13 and Price Book and Task List #13 and #15 dated 30 Apr 13.
15. Question: Regarding Asbestos/Lead/Haz Mat pre-demolition inspections – the bid item asks for a fixed cost without consideration of size or age of a given structure. There could potentially be a significant range in what is actually required. Could this item be developed a bit more based on square footage of structure (i.e.: <2500sf; 2500-5000; 5001- 10,000; 10,000 – 50,000 and >50,000).
Answer: Refer to min/max quantity provision added to Solicitation, Section B.
16. Question: Regarding Lead Related Construction: Can the CP be an outside entity who has the proper California credentials – much like the PQP/QP person for Asbestos?
Answer: See Specifications Section 02 82 33.13 20 para 1.5.2.1 dated 08 Apr 13.
17. Question: Are there any other existing conditions or reports for hazardous materials associated with structures or soil conditions that are applicable to this project that can be made available now or at a later date?
Answer: Refer to Question #14.
18. Question: Should cost associated with all excavation or fill material needed on item 0001 - 0010 be allocated in item 0012 -site restoration? (i.e. removal of underground pipe- 0007 will require excavation, or the removal of manhole and catch basin-0004 will require fill material, etc…) Part I - Price.
Answer: See Task List and Price Book dated 30 Apr 13.
19. Question: For item 0011AA - Excavation and Disposition of Contaminated soil off base, please specify the type of soil (Class II, non-RCRA, RCRA, etc…). Part I – Price.
Answer: See Specifications Section 02 61 13 dated 08 Apr 13, Task List and Price Book dated 30 Apr 13.
20. Question: There isn't a line item for dewatering in excavation if groundwater is encountered during underground storage tank removal work, should contractor disregard that assumption in the bid? Part I – Price.
Answer: See Task List, item 0010AD and Price Book dated 30 Apr 13.
21. Question: There is no line item for treatment of contaminated water, as discussed in Specifications Section 02 41 00 para. 3.5.1 "water used in tank removal is normally disposed of …." Disregard that assumption in the bid? Part I – Price.
Answer: See Specifications Sections 01 56 00, and 02 61 13 dated 08 Apr 13 and Task List dated 30 Apr 13.
22. Question: Award Basis - "The purpose of the past performance evaluation is to allow the Government to assess the offeror's ability to perform the effort described in this RFP, based on the offeror's demonstrated present and past performance." Can contractor use an on-going project for past performance evaluation purposes? Part II – PPI.
Answer: See Section L, Proposal Preparation Instructions, paragraph C.2.a.
23. Question: Will projects with CCASS ratings satisfy the requirements of Past Performance Questionnaires letter or contractor is still required to submit the PPQ? If acceptable, does CCASS pages count toward page limit requirement? Part II – PPI.
Answer: See Section L, paragraph C.2.c.
24. Question: Is cover letter allowed and does it count toward page limit? Part II – PPI.
Answer: See Section L, clause entitled Proposal Preparation Instructions, paragraph C.2.a.
25. Question: Should value of Offer Guarantee be based on basic period or total contract value to include all option years? General.
Answer: Refer to Question #8.
26. Question: Where is the general termination point of utility capping? 5 feet from structure? General.
Answer: See Specifications Section 02 41 00, 3.1.2.2 dated 08 Apr 13, Task List item 0007AE and Price Book dated 30 Apr 13.
27. Question: Will fencing with fabric be required for sites near runway or standard chain-link fence meets the requirements? General.
Answer: See Specifications Section 01000 para 1.6 dated 08 Apr 13.
28. Question: Spec. 02 41 00, Paragraph 3.1 - Is recycling/reuse a mandatory consideration in project planning or only to the extent practical? Specifications.
Answer: See Specifications, Sections 01000, para 1.30 and 01 56 00 para 3.2.3.1 dated 08 Apr 13.
29. Question: Spec. 02 41 00, Paragraph 3.1.1 Should contractor assume all structures to be removed to 3 FT below grade? If properly broken, can basement slabs be used as fill?
Specifications.
Answer: See Specifications Section 02 41 00, para 2.1 dated 08 Apr 13.
30. Question: Item 0002AA – Reinforced Concrete, Slab on Grade. Is the unit of measurement, cubic foot (CF) correct for this line item? Should the unit of measurement be square foot (SF)?
Answer: “CF” is the correct unit of measurement. See Price Book and Task List dated 30 Apr 13.
31. Question: Item 0008AC – CMU, 8” thick. What is the unit of measurement AF stand for?
Answer: Typographical error, see Price Book and Task List dated 30 Apr 13.
32. Question: Does this contract include housing units?
Answer: See Specifications Section 01000 para 1.1 dated 08 Apr 13.
33. Question: Bid items 0001AA – 0001AD. Question: Industry standard when giving unit pricing is $/SF (building footprint or useable square footage). We are being asked to price it at $/CF. How is CF determined (volume that the building will hold, volume of debris ECT)?
Answer: See Price Book and Task List dated 30 Apr 13.
34. Question: Item 0001AB (building). How is this different from the other bid items in this section without giving the type of construction?
Answer: See Price Book and Task List dated 30 Apr 13.
35. Question: Bid item 0002 AA. Question: Industry standard would be to price this out as $/SF for a given thickness (example 20,000 SF SOG @ 4” thickness or 5,000 SF SOG @ 8” thickness).
Answer: Formula for calculating CF (Length x Width x Thickness). See Task List dated 30 Apr 13.
36. Question: Bid items 0003AA, and 0003AB, SF vs thickness.
Answer: Formula for calculating CF (Length x Width x Thickness). See Task List dated 30 Apr 13.
37. Question: 0003AF – Pavement. What defines pavement other than concrete and asphalt?
Answer: See Task List dated 30 Apr 13.
38. Question: Bid item 0005AA. Question: Are we to assume, water shutdown and simply unbolt the hydrant or more limits of removal?
Answer: See Specifications Section 02 41 00, para 1.3.4 dated 08 Apr 13 and Task List dated 30 Apr 13.
39. Question: Bid items 0007AA – 0007AD. Question: Even though the pipe diameter is important, more importantly how deep is the excavation (even if we exclude the excavation)?
Answer: See Price Book and Task List dated 30 Apr 13.
40. Question: Are we to assume that the excavation will be shored or sloped back to allow personnel to enter?
Answer: See Specifications Sections 02 65 00, para 1.5 and 3.7.2 dated 08 Apr 13
41. Question: Are we to assume ample access for hoisting equipment?
Answer: Refer to Question #40.
42. Question: Bid items 0009AA – 0009AC. 3 items need to be addressed which will determine how it is priced. Question: Depth of the tank?
Answer: See Price Book and Task List dated 30 Apr 13.
43. Question: Composition of the tank (steel, fiberglass ECT).
Answer: See Specifications Section 02 65 00, para. 1.3 and 2.1 dated 08 Apr 13.
44. Question: Does the void need to be backfilled?
Answer: See Specifications Section 02 65 00, para. 1.3 and 2.1 dated 08 Apr 13.
45. Question: Bid items 0010AA – 0010AC. I am used to working in the private sector which has very specific procedures for U/G tank removal(s). What does or did the tank contain? Various materials differ in price for disposal.
Answer: See Specifications Section 02 65 00, para 1.3 dated 08 Apr 13 and Price Book and Task List dated 30 Apr 13.
46. Question: How much sludge, water or remaining fluid is to be removed (gallons)?
Answer: See Specifications Section 02 65 00, para 3.2 dated 08 Apr 13 and Price Book and Task List dated 30 Apr 13.
47. Question: Does the tank need to be triple washed and does a baker tank need to be used to capture the triple rinse material?
Answer: See Specifications Section 02 65 00, para 3.9 dated 08 Apr 13.
48. Question: Who is responsible for testing the triple rinse product?
Answer: See Specifications Section 02 65 00, para 3.9 dated 08 Apr 13.
49. Question: Bid item 0011AA. In order to determine value, the type of contaminants and degree of contamination need to be determined. Who is responsible for this testing?
Answer: See Specifications Section 02 65 00, para 1.3 dated 08 Apr 13.
50. Question: Before a class 1 or class 2 landfill will accept the material it needs to be profiled (a above). Once it is profiled and accepted, waste-stream manifests have to be created and accompany each load. Who will be listed as the generator of the waste on said manifest (TAFB, federal government ECT)?
Answer: See Specifications Section 015600, para 3.8.11 dated 08 Apr 13.
51. Question: Will there be a point of contact for signature of the manifest?
Answer: See Specifications Section 015600, para 3.8.11 dated 08 Apr 13.
52. Question: Bid items 0012AC & 0012AD. These items go hand in hand. Primarily it is a matter of depth and width. Depth is the key factor when it comes to the excavation (whether the trench needs to be shored or slopped for safety. Method of compaction is determined by depth as well. The deeper the excavation the more lifts the material has to be placed to achieve a certain compaction requirement.
Answer: See Price Book and Task List dated 30 Apr 13.
53. Question: On bid item 0012AB, what does the unit MSF stand for?
Answer: Typographical error. See Price Book and Task List dated 30 Apr 13.
54. Question: On bid item 0008AC, what does the unit AF stand for?
Answer: Typographical error. See Price Book and Task List dated 30 Apr 13.
55. Question: Bid items 0014AF – 0014AH. Is the dimension given window size?
56. Question: Are we to assume ground floor? If there are windows above the ground floor, there needs to be a bid item for rental lifting equipment and / or scaffolding.
Answer: See Price Book and Task List dated 30 Apr 13.
57. Question: Bid item 0015AG. Please clarify the definition of “Pipe VAT”. Normally, VAT is associated with floor tile.
Answer: See Price Book and Task List dated 30 Apr 13.
58. Question: Is it possible to obtain the asbestos survey or any other information about this project?
Answer: Refer to Question #14.
59. Question: Section 01 56 00, paragraph 3.14.2 refers to the following attachments:
ATTACHMENT 1 - Temporary Staging of Contaminated Soil and ATTACHMENT 2 - MAP OF NATURAL RESOURCE PRESERVE AREAS ON TAFB. We are unable to locate. Please advise.
Answer: See revised Specifications Section 02 65 00.
60. Question: Are there plans available for SOL: FA4427-13-R-0102 Demolition of Base Buildings?
Answer: All documents listed are posted on fbo.gov. See Solicitation, Section J, List of Documents, Exhibits and Other Attachments for offerors to download.
61. Question: 1) Section L of the RFP provides the submission requirements for Part II, Past Performance. There seems to be four (4) sub-parts of Part II; (a) Past Performance Information; (b) Subcontractor or Teaming Arrangement; (c) Past Performance Questionnaires; and (d) Subcontractor Consent Form. For (a) Past Performance Information, the RFP states, to provide no more than five (5) projects on the Past Performance Information Sheets. However, the RFP does not provide "Past Performance Information Sheets". Will the Government either provide a Past Performance Information Sheet, or confirm that Offerors may provide the requested information in any format as long as the information requested is provided?
Answer: Refer to Solicitation, Section L, paragraph C.2.a.
62. Question: Regarding Price Book Item Descriptions listed under SLIN 0001 AA and SLIN 0001 AB (For Base Period and all Option Periods, Pages 8, 10, 12, 14, 16), could you please confirm that the building descriptions are accurate. On the surface, it appears that SLIN 0001 AA should read "Steel Building" vice "Steel Building Reinforced Concrete" and SLIN 0001 AB should read "Reinforced Concrete Building" vice "Building" with no further description. In the event the descriptions for SLIN(s) 0001 AA and 0001 AB are correct, could you please describe the type of building called out under SLIN 0001 AB?
Answer: See Price Book and Task List dated 30 Apr 13.
63. Question: Regarding Price Book Item Descriptions listed under SLIN 0004 AA and SLIN 0004 AB (For Base Period and all Option Periods, Pages 8, 10, 12, 14, 16), could you please spell out and define the Unit of Measurement "SF Face"?
Answer: See Price Book and Task List dated 30 Apr 13.
64. Question: Regarding Price Book Item Description listed under SLIN 0002 AE (For Base Period and all Option Periods, Pages 8, 10, 12, 14, 16), could you please confirm that the RC Spread Footing is only 2 Inches thick?
Answer: Price Book Item 0002AE footing is 2 Ft thick - See Price Book and Task List dated 30 Apr 13.
65. Question: Is this contract under the service act wage determination?
Answer: Reference Section I, FAR clause 52.222-6 Davis Bacon Act and Section J Attachment #3 Wage Determination applicability.
66. Question: When I visited the web site for retrieving CA13-0009 Mod 2 Revised 02/08/2013 I could only retrieve CA130013 Mod 0 Revised 02/08/2013, if this is not the correct wage determination please provide a copy of the correct wage determination that is going to be a part of the contract as I can't find the WD referenced.
Answer: Wage Determination Applicability updated. See Section J, Attachment #3.
To obtain prior wage determinations the same site is utilized however documents are in the archive section.
67. Question: Can you provide a copy of the site visit sign in list and meeting minutes?
Answer: Site visit/Pre-Proposal attendance sheet uploaded to FBO.gov.
68. Question: Is the focus of this contract residential structures, commercial structures or a mixture of all structures?
Answer: Refer to Specifications, Section 01000, para 1.1 dated 08 Apr 13.
69. Question: If there was previous demolition contract and if so what was the average annual dollar amount of work performed?
Answer: Information on previous contract has to be requested via Freedom of Information Act (FOIA).
70. Question: Are there any structures identified to be demolished under this new IDIQ contract, if so what are the structures.
Answer: Refer to min/max quantity provision added to Solicitation, Section B.
71. Question: Price Book-Base Year-Item NO. 0003AF, Pavement, 1,000, CY, $- ,$- . It is not clear what is to be demolished under this bid item since concrete pavement removal is bid item 0003AA and asphalt pavement removal is bid item 0003AAB, please clarify.
Answer: See Price Book and Task List dated 30 Apr 13.
72. Question: Pertaining to cost sheets page 8, specifically 0001AA, 0001AB, 0001AC and 0001AD, please clarify that this is cubic feet of material hauled away, or is this pertaining to the cubic feet of the actual building to be demolished.
Answer: See Price Book and Task List dated 30 Apr 13.
73. Question: Price Book Bid Item 001AA description is describing a steel building mixed with reinforced concrete please clarify if this is the intent.
Answer: See Price Book and Task List dated 30 Apr 13.
74. Question: Price Book Bid Item 001AB describes a building but does not identify the type of building please clarify.
Answer: See Price Book and Task List dated 30 Apr 13.
75. Question: Price Book Bid Item 0003AF describes Pavement but does not describe the type of pavement, please clarify.
Answer: See Price Book and Task List dated 30 Apr 13.
76. Question: Price Book Bid Item 0008AC describes CMU, 8'' Thick Fence to be removed but the unit of measure appears to have a typo "AF", please clarify.
77. Question: BID FORM: Item 0001AA "Steel Building Reinforced Concrete" should this just read "Steel Building"?
Answer: See Price Book and Task List dated 30 Apr 13.
78. Question: BID FORM: Item 0001AB "Building" What kind? Is this the "Reinforced Concrete" as mentioned in item 0001AA description?
Answer: See Price Book and Task List dated 30 Apr 13.
79. Question: BID FORM: Item 0002AA "Reinforced Concrete, Slab on Grade" Can you provide a Thickness? and "4,000 CF" should this be "CY"?
Answer: See Price Book and Task List dated 30 Apr 13.
80. Question: BID FORM: Item 0003AA "Reinforced Concrete Pavement" Can you provide a Thickness?
Answer: See Task List dated 30 Apr 13.
81. Question: BID FORM: Item 0003AB "Asphalt Pavement" Can you provide a Thickness?
Answer: See Task List dated 30 Apr 13.
82. Question: BID FORM: Item 0003AE Is this also Saw Cutting?
Answer: See Task List dated 30 Apr 13.
83. Question: BID FORM: Item 0003AF "Pavement" Un-reinforced Concrete? What kind of "Pavement"?
Answer: See Task List dated 30 Apr 13.
84. Question: BID FORM: Item 0004AA Unit of "SF Face" What is this? The interior surface contact area?
Answer: See Task List dated 30 Apr 13.
85. Question: BID FORM: Item 0011AB "Excavation & Disposition of Contaminated Soil Off Base" What Classification of Contamination? Class 1 - Non RCRA? Class 2 - Non RCRA?
Class 3 - Non RCRA? Federal - RCRA ?
Answer: See Specifications Section 02 61 13 dated 08 Apr 13, Price Book and Task List dated 30 Apr 13.
86. Question: The Specifications for Demolition of Base Buildings Section 02 41 00 Demolition 05/10 Part 3 EXECUTION. This section is written as to remove components of buildings piece by piece and separate materials such as carpets, ceiling tiles, Wood components and roofing materials. The Bid Units for Building Demolition is by the CF.
There are no quantities or bid items that allows for bidding this type of execution. Is it the intent to perform demolition as described in these specifications or to perform demolition with equipment to remove complete Buildings without separation of materials and be paid for by the Cubic Foot?
Answer: See Specifications Section 01000, para 1.2 and Section 02 41 00, para 1.2.1 dated 08 Apr 13.
87. Question: Please confirm or clarify a bid bond in only required for the base year.
Answer: Reference Solicitation, Section H, page 25 of 74, and clause FAR clause 52.228-1 entitled Proposal Guarantee (Bid Bond) for bid bond information.
88. Question: In Section 02 82 16.00 20; Page 8: 1.3.9: In the event there are any differences between the Asbestos Hazard Abatement Plan and Section 02 82 16.00 20 specification and the less stringent changes proposed in the Asbestos Hazard Abatement Plans meet all Local, State and Air Force, Federal asbestos regulations/environmental regulation, will the changes be automatically approved? Is the Air Force looking to solely meet the applicable laws or is the Air Force requesting any abatement methods used for TOTAL DEMOLITION that exceed the applicable laws and regulations and is willing to pay for those incremental requirements?
Answer: See Specifications, Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5 and para 1.3.9.
89. Question: Pre cleaning – Asbestos. In Section 02 82 16.00 20; Page 18: 3.2.4.1 (Negative Pressure Enclosure): As this project is for TOTAL DEMOLITION, the specifications state to cover any uncontaminated walls, and or ceiling with a continuous membrane of two layers of 6 mil plastic. On a TOTAL DEMOLITION project, pursuant to NESHAPS asbestos regulations, only plastic is required on openings and critical. Is the Air Force requesting an elevated level above and beyond the requirements for asbestos removal for TOTAL DEMOLITION (State, Federal, Local, Air Force) or can this requirement be deleted?
Answer: See Specifications Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5 and para 3.2.4.1.
90. Question: In Section 02 82 16.00 20; Page 18: 3.2.3 (Pre Cleaning): Please advise what is the correct heading for this section? It appears it should be labeled, "Pre Cleaning" not "Visual; ing".
Answer: See Specifications Section 02 82 16 para 3.2.3 dated 08 Apr 13.
91. Question: In Section 02 82 16.00 20; Page 19: 3.2.5 (Removal Procedures): Per NESHAPS asbestos regulations, it stated to thoroughly saturate the asbestos containing material prior to abating the asbestos - in this spec section for TOTAL DEMOLITION, it is requiring a "continuous application" of the amended water. Is the Air Force requesting an elevated level above and beyond the requirements for asbestos removal for TOTAL DEMOLITION (State, Federal, Local, Air Force) or can this requirement be deleted?
Answer: See Specifications Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5 and 3.2.5.
92. Question: In Section 02 82 16.00 20; Page 19: 3.2.5.1 (Sealing Contaminated Items Designated for Disposal): As this is a TOTAL DEMOLITION project a contaminated duct could be encapsulated with a Lock-Down encapsulant and then demolished with the building. In the specifications, it states that contaminated ductwork shall be removed, sprayed with lock down encapsulant and removed from the asbestos control area. Is the Air Force requesting an elevated level above and beyond the requirements for asbestos removal for TOTAL DEMOLITION (State, Federal, Local, Air Force) or can this requirement be deleted?
Answer: See Specifications Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5 and para 3.2.5.1.
93. Question: In Section 02 82 16.00 20; Page 20: 3.2.7.3 (Sampling After Fine Clean-up):
Is aggressive TEM sampling required for this project when the building is planned to be demolished? Is the Air Force requesting an elevated level above and beyond the requirements for asbestos removal for TOTAL DEMOLITION (State, Federal, Local, Air Force) or can this requirement be deleted?
Answer: See Specifications Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5. and para 3.2.7.3.
94. Question: In Section 02 82 16.00 20; Page 21: Item 3.2.7.3 (Sampling After Fine Clean-up): After fine cleaning do you expect all areas inside the containment to be free of all dirt, dust or debris or just the asbestos containing dust or debris? The asbestos regulations require that all visible asbestos residue be removed. The difference is the cleaning of non-asbestos dust or film or residues on the ducts that might have accumulated over the years which would be sprayed with a Lock Down Encapsulant versus cleaning Non-asbestos materials. An example of this would be if during the removal of asbestos floor tile and asbestos floor mastic - would the ducts and ledges from the suspended ceiling system need to be cleaned or can any invisible asbestos fibers be locked down to the substrate and demolished with the building on a TOTAL DEMOLITION project?
Answer: See Specifications Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5 and 3.2.7.3.
95. Question: In Section 02 82 16.00 20; Page 21: 3.3.1 (Housekeeping): Very similar to Question #7 in this section is states that the CO will visually inspect all surfaces within the enclosure for residual material or accumulated dust or debris. Can the accumulated dust or debris be encapsulated and left in place in order to be demolished or is the Air Force requesting that any dust located in an asbestos enclosure be remediated prior to the building be demolished? The same hypothetical example exists: An enclosure to remove asbestos floor tile and asbestos floor mastic with existing walls and ceilings in a building to be demolished - is the Air Force requesting that all non-asbestos materials be removed prior to demolition and asbestos; is the Air Force requesting that if any materials are left that the materials be wet wiped and made dust free; or is the Air Force asking the contractor to lock down any asbestos fibers released during abatement and not requiring a duct 8' from the source to be cleaned? Is the Air Force requesting an elevated level above and beyond the requirements for asbestos removal for TOTAL DEMOLITION (State, Federal, Local, Air Force) or can this requirement be deleted?
Answer: See Specifications Section 02 82 16 dated 08 Apr 13. Must comply with para
1.3.5 and para 3.3.1.