1-8_13R0102-0002_Atch_1_SPECS_Section_02_61_13 _EXCAVATION_AND_HANDLING_OF_CONTAMINATED_MATERIAL_08_APR_13.pdf

PDF 62 KB Posted

Attached to
Demolition of Base Buildings
Solicitation number
FA4427-13-R-0102
Issued by

About this file

13R0102-0002 Atch 1 Sepcs Section 02 61 13 Excavation and Handling of Contaminated Material

View the file

Other files

File Type Posted
Questions__ _Answers__2-15_May_13.pdf PDF
1-0_13R0102-0002_Amendment_2_DEMO_IDC.pdf PDF
2-6_13R0102-0002_Atch_1_Task_Description_30_Apr_13.pdf PDF
2-5_13R0102-0002_Atch_1_SPECS_Section_32_92_19_SEEDING_08_APR_13.pdf PDF
1-2_13R0102-0002_Fill-In_Section_B_thru_K.doc DOC document
1-1_13R0102-0002_DEMO_Conformed_Solicitation.pdf PDF
2-4_13R0102-0002_Atch_1_SPECS_Section_32_12_16_HOT-MIX_ASPHALT_(HMA)_FOR_ROADS_08_APR_13.pdf PDF
2-1_13R0102-0002_Atch_1_SPECS_Section_02_82_33.13_20 _REMOVAL_CONTROL_AND_DISPOSAL_OF_PAINT_WITH_LEAD_08_APR_13.pdf PDF
1-3_13R0102-0002_Atch_1_SPECS_COVER_and_INDEX_08_APR_13.pdf PDF
2-3_13R0102-0002_Atch_1_SPECS_Section_32_12_10_BITUMINOUS_TACK_ _PRIME_COATS_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_01_56_00_para_3.14.2_Attachment_1_Temporary_Staging_of_Contaminated_Soil.pdf PDF
1-7_13R0102-0002_Atch_1_SPECS_Section_02_41_00_DEMOLITION_08_APR_13.pdf PDF
2-7_13R0102-0002_Atch_3_Wage_Determination_Applicability.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_01_56_00_para_3.14.2_Attachment_2_MAP.pdf PDF
1-9_13R0102-0002_Atch_1_SPECS_Section_02_65_00 _UNDERGROUND_STORAGE_TANK_REMOVAL_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_Section_01_56_00 _ENVIRONMENTAL_GENERAL_REQUIREMENTS_08_APR_13.pdf PDF
1-5_13R0102-0002_Atch_1_SPECS_Section_01_33_00 _SUBMITAL_PROCEDURES_08_APR_13.pdf PDF
2-0_13R0102-0002_Atch_1_SPECS_Section_02_82_16.00_20 _ENGINEERING_CONTROL_OF_ASBESTOS_CONTAINING_MATERIALS_08_APR_13.pdf PDF
2-2_13R0102-0002_Atch_1_SPECS_Section_03_30_00 _CAST-IN-PLACE_CONCRETE_08_APR_13.pdf PDF
1-4_13R0102-0002_Atch_1_SPECS_Section_01000_GENERAL_REQUIREMENTS_08_APR_13.pdf PDF
2-8_13R0102-0002_Questions__ _Answers_1_dated_06_May_13.pdf PDF
Demo-_Amendment_01-14_Mar_13.pdf PDF
Demo-SV-PPConference-12Mar13.pdf PDF
0-0_FA4427-13R0102_DEMO_IDC_SOLICITATION.pdf PDF
0-5_FA4427-13R0102_Atch_1_SPECS_Section_01_56_00.doc DOC document
1-0_FA4427-13R0102_Atch_3_Wage_Determination_Applicability.doc DOC document
0-4_FA4427-13R0102_Atch_1_SPECS_Section_01_33_00.doc DOC document
0-8_FA4427-13R0102_Atch_1_SPECS_02_82_16.00_20.doc DOC document
0-7_FA4427-13R0102_Atch_1_SPECS_Section_02_65_00.doc DOC document
0-9_FA4427-13R0102_Atch_1_SPECS_02_82_33.13_20.doc DOC document
1-2_FA4427-13R0102_Atch_6_Subcontractor_Consent_Form.doc DOC document
0-1_FA4427-13R0102_FILL_IN_Section_B_thru_K.doc DOC document
1-1_FA4427-13R0102_Atch_5_Past_Perf_Ltr-Questionnaire.doc DOC document
0-3_FA4427-13R0102_Atch_1_SPECS_SECT_01000_-_GENERAL_REQUIREMENTS_30_JAN_13.doc DOC document
0-2_FA4427-13R0102_Atch_1_SPECS_COVER_and_INDEX.doc DOC document
0-6_FA4427-13R0102_Atch_1_SPECS_Section_02_41_00.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDC FACILITY DEMOLITION

08 APR 2013

SECTION 02 61 13, Page 1

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02/10

PART 1 GENERAL

1.1 MEASUREMENT AND PAYMENT

1.1.1 Measurement

Measurement for excavation and onsite transportation shall be based on the actual number of cubic yards of contaminated material in-place prior to excavation. Determination of the volume of contaminated material excavated shall be based on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Measurement for backfilling of excavated areas shall be based on in-place cubic yards of compacted fill.

Measurement for construction of stockpile areas shall be based on the number of square yards of stockpile liner constructed.

1.1.2 Payment

1.1.2.1 Excavation and Transportation

Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. This unit cost shall include any other items incidental to excavation and handling not defined as having a specific unit cost.

1.1.2.2 Backfilling

Compensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical testing will be paid as a single unit cost.

1.1.2.3 Stockpiling

Compensation for construction of stockpile areas will be paid for as a unit cost. This unit cost shall include all aspects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

SECTION 02 61 13, Page 2

ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method

ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method

ASTM D422 (1963; R 2007) Particle-Size Analysis of Soils

ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock

ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

ASTM D698 (2012) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;

Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926 Safety and Health Regulations for Construction

40 CFR 302 Designation, Reportable Quantities, and Notification

1.3 DESCRIPTION OF WORK

The work consists of excavation and temporary storage of approximately cubic yards of contaminated material. Notify the Contracting Officer within 24 hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Backfill material is not available onsite. Ground water is approximately 3 feet below pre-excavation ground surface. Required sampling and chemical analysis shall be conducted in accordance with Section

01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL.

1.3.1 Scheduling

Notify the Contracting Officer 7 calendar days prior to the start of excavation of contaminated material. The Contractor shall be responsible

SECTION 02 61 13, Page 3 for contacting regulatory agencies in accordance with the applicable reporting requirements.

1.3.2 Work Plan

Submit a Work Plan within 21 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. Allow 14 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Work Plan shall include:

a. Schedule of activities.

b. Method of excavation and equipment to be used.

c. Shoring or side-wall slopes proposed.

d. Dewatering plan.

e. Storage methods and locations for liquid and solid contaminated material.

e. Borrow sources and haul routes.

f. Decontamination procedures.

g. Spill contingency plan.

1.3.3 Other Submittal Requirements

Submit separate cross-sections of each area before and after excavation and after backfilling, test results, and 5 copies of the Closure Report within 14 calendar days of work completion at the site.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Surveys; G

SD-03 Product Data

Work Plan; G

Closure Report; G

SD-06 Test Reports

Backfill; G

SECTION 02 61 13, Page 4

Surveys; G

Confirmation Sampling and Analysis; G Sampling of Stored Material; G

Sampling Liquid; G

Compaction; G

1.5 REGULATORY REQUIREMENTS

1.5.1 Permits and Licenses

Obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government.

1.5.2 Air Emissions

Air emissions shall be monitored and controlled in accordance with Section

01 57 20.00 10 ENVIRONMENTAL PROTECTION.

PART 2 PRODUCTS

2.1 SPILL RESPONSE MATERIALS

Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.

2.2 BACKFILL

Backfill material shall be obtained from offsite sources approved by the Contracting Officer. Backfill shall be classified in accordance with ASTM D2487 as GW, GP, GM, GC, SW, SP, SM, SC, ML, MH, CL, or CH and shall be free from roots and other organic matter, trash, debris, snow, ice or frozen materials. Backfill material shall be tested for the parameters listed below at a frequency of once per 3000 cubic yards. A minimum of one set of classification tests shall be performed per borrow source. One backfill sample per borrow source shall also be collected and tested for the chemical parameters listed below.

Do not use material for backfill until borrow source chemical and physical test results have been submitted and approved.

PART 3 EXECUTION

3.1 SURVEYS

Surveys shall be performed immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed. Surveys shall also be performed immediately after backfill of

SECTION 02 61 13, Page 5 each excavation. Provide cross-sections on 25 foot intervals and at break points for all excavated areas. Locations of confirmation samples shall also be surveyed and shown on the drawings. Surveys shall be performed by California Surveyor.

3.2 EXISTING STRUCTURES AND UTILITIES

No excavation shall be performed until site utilities have been field verified and located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.

3.3 CLEARING

Clearing shall be performed to the limits specified by Contracting Officer.

3.4 CONTAMINATED MATERIAL REMOVAL

3.4.1 Excavation

Contractor shall excavate the areas contaminated as directed by the Contracting Officer. Excavation shall be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An excavation log describing visible signs of contamination encountered shall be maintained for each area of excavation.

Excavation logs shall be prepared in accordance with ASTM D5434.

3.4.2 Shoring

If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.

3.4.3 Dewatering

Surface water shall be diverted to prevent entry into the excavation.

Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met. No dewatering shall be performed with prior approval of the Contracting Officer.

3.5 CONFIRMATION SAMPLING AND ANALYSIS

The Contracting Officer shall be present to inspect the removal of contaminated material from each site. After all material suspected of being contaminated has been removed, the excavation shall be examined for evidence of contamination. If the excavation appears to be free of contamination, field analysis shall be used to determine the presence of contamination using a real time vapor monitoring instrument field kits.

Excavation of additional material shall be as directed by the Contracting Officer. After all suspected contaminated material is removed; confirmation samples shall be collected and analyzed for the following contaminants:

Chemical Parameter Action Level Samples shall be collected at a frequency of one per 500 cubic yards from the bottom and each of the side walls or as directed by the Contracting Officer. A minimum of one sample shall be

SECTION 02 61 13, Page 6 collected from the bottom and each side wall of the excavation. Based on test results, propose any additional excavation which may be required to remove material which is contaminated above action levels. Additional excavation shall be subject to approval by the Contracting Officer. Locations of samples shall be marked in the field and documented on the as-built drawings.

3.6 CONTAMINATED MATERIAL STORAGE

Material shall be placed in temporary storage immediately after excavation while awaiting test results. The following paragraphs describe acceptable methods of material storage. Storage units shall be in good condition and constructed of materials that are compatible with the material or liquid to be stored. If multiple storage units are required, each unit shall be clearly labeled with an identification number and a written log shall be kept to track the source of contaminated material in each temporary storage unit.

3.6.1 Stockpiles

Stockpiles shall be constructed to isolate stored contaminated material from the environment. The maximum stockpile size shall be 1000 cubic yards.

Stockpiles shall be constructed to include:

a. A chemically resistant geomembrane liner free of holes and other damage. Non-reinforced geomembrane liners shall have a minimum thickness of 20 mils. Scrim reinforced geomembrane liners shall have a minimum weight of 40 lbs/1000 square feet. The ground surface on which the geomembrane is to be placed shall be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane.

b. Geomembrane cover free of holes or other damage to prevent precipitation from entering the stockpile. Non-reinforced geomembrane covers shall have a minimum thickness of 10 mils. Scrim reinforced geomembrane covers shall have a minimum weight of 26 lbs/1000 square feet.

The cover material shall be extended over the berms and anchored or ballasted to prevent it from being removed or damaged by wind.

c. Berms surrounding the stockpile, a minimum of 12 inches in height. Vehicle access points shall also be bermed. d. The liner system shall be sloped to allow collection of leachate. Storage and removal of liquid which collects in the stockpile, in accordance with paragraph Liquid Storage.

3.6.2 Roll-Off Units

Roll-off units used to temporarily store contaminated material shall be water tight. A cover shall be placed over the units to prevent precipitation from contacting the stored material. Liquid which collects inside the units shall be removed and stored in accordance with paragraph Liquid Storage.

3.6.3 Liquid Storage

Liquid collected from excavations and stockpiles shall be temporarily stored in 500 gallon tanks. Liquid storage containers shall be water-tight and shall be located on site.

SECTION 02 61 13, Page 7

3.7 SAMPLING

3.7.1 Sampling of Stored Material

Samples of stored material shall be collected at a frequency of once per 25 cubic yards. Samples shall be tested for the following:

Chemical Parameter Action Level

Stored material with contaminant levels that exceed the action levels shall be treated [offsite. Analyses for contaminated material to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility.

Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analyses to the extent required by the approved offsite treatment, storage or disposal (TSD) facility shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government

3.7.2 Sampling Liquid

Liquid collected from excavations, storage areas, and decontamination facilities shall be sampled at a frequency of once for every 500 gal of liquid collected. Samples shall be tested for the following: Chemical Parameter Action Level Liquid with contaminant levels that exceed action levels shall be treated offsite. Analyses for contaminated liquid to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility.

Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analysis to the extent required by the approved offsite treatment, storage or disposal (TSD) facility receiving the material shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government.

3.7.3 Sampling Beneath Storage Units

Samples from beneath each storage unit shall be collected prior to construction of and after removal of the storage unit. Samples shall be collected at a frequency of one per each square yards from a depth interval of 0 to 0.5 feet and shall be tested for the following:

Based on test results, soil which has become contaminated above action levels shall be removed at no additional cost to the Government.

Contaminated material which is removed from beneath the storage unit shall be handled in accordance with paragraph Sampling of Stored Material. As directed by the Contracting Officer and at no additional cost to the Government, additional sampling and testing shall be performed to verify areas of contamination found beneath stockpiles have been cleaned up to below action levels.

3.8 SPILLS

In the event of a spill or release of a hazardous substance as designated in 40 CFR 302, pollutant, contaminant, or oil as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq., notify the Contracting Officer immediately. If the spill exceeds the reporting threshold, follow

SECTION 02 61 13, Page 8 the pre-established procedures as described in the RCRA Contingency Plan Base Wide Contingency Plan for immediate reporting and containment. Immediate containment actions shall be taken to minimize the effect of any spill or leak. Cleanup shall be in accordance with applicable federal, state, and local regulations. As directed by the Contracting Officer, additional sampling and testing shall be performed to verify spills have been cleaned

up. Spill cleanup and testing shall be done at no additional cost to the Government.

3.9 BACKFILLING

3.9.1 Confirmation Test Results

Excavations shall be backfilled immediately after all contaminated materials have been removed and confirmation test results have been approved. Backfill shall be placed and compacted to the lines and grades shown on the drawings.

3.9.2 Compaction

Approved backfill shall be placed in lifts with a maximum loose thickness of 8 inches. Soil shall be compacted to 90 percent of [ASTM D698] [ASTM D1557] maximum dry density. Density tests shall be performed at a frequency of once per 10,000 square feet per lift. A minimum of one density test density tests shall be performed on each lift of backfill placed. Field in-place dry density shall be determined in accordance with ASTM D1556, ASTM D2167, or ASTM D6938. If ASTM D6938 is used, a minimum of one in ten tests shall be checked using ASTM D1556 or ASTM D2167. Test results from ASTM D1556 or ASTM D2167 shall govern if there is a discrepancy with the ASTM D6938 test results.

3.10 DISPOSAL REQUIREMENTS

Offsite disposal of contaminated material shall be in accordance with Section 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS.

3.11 CLOSURE REPORT

5 copies of a Closure Report shall be prepared and submitted within 14 calendar days of completing work at the site. The report shall be labeled with the contract number, project name location, date, name of general Contractor, and the Corps of Engineers District contracting for the work. The Closure Report shall include the following information as a minimum:

a. A cover letter signed by a responsible company official Professional Engineer registered in the State of California who is a responsible company official] certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory requirements.

b. A narrative report including, but not limited to, the following:

(1) site conditions, ground water elevation, and cleanup criteria;

(2) excavation logs;

SECTION 02 61 13, Page 9

(3) field screening readings;

(3) quantity of materials removed from each area of contamination;

(4) quantity of water/product removed during dewatering;

(5) sampling locations and sampling methods;

(7) sample collection data such as time of collection and method of preservation;

(8) sample chain-of-custody forms; and

(9) source of backfill.

c. Copies of all chemical and physical test results.

d. Copies of all manifests and land disposal restriction notifications.

e. Copies of all certifications of final disposal signed by the responsible disposal facility official.

f. Waste profile sheets.

g. Scale drawings showing limits of each excavation, limits of contamination, known underground utilities within 15 m 50 feet of excavation, sample locations, and sample identification numbers.

On-site stockpile, storage, treatment, loading, and disposal areas shall also be shown on the drawings.

h. Progress Photographs. Color photographs shall be used to document progress of the work. A minimum of four views of the site showing the location of the area of contamination, entrance/exit road, and any other notable site conditions shall be taken before work begins. After work has been started, activities at each work location shall be photographically recorded weekly. Photographs shall be a minimum of 3 by 5 inches and shall include:

(1) Soil removal and sampling.

(2) Dewatering operations.

(3) Unanticipated events such as spills and the discovery of additional contaminated material.

(4) Contaminated material/water storage, handling, treatment, and transport.

(5) Site or task-specific employee respiratory and personal protection.

(6) Fill placement and grading.

(7) Post-construction photographs. After completion of work at each

SECTION 02 61 13, Page 10 site, take a minimum of four views of each excavation site.

A digital version of all photos shown in the report shall be included with the Closure Report. Photographs shall be a minimum of 3 inches by 5 inches and shall be mounted back-to-back in double face plastic sleeves punched to fit standard three ring binders. Each print shall have an information box attached. The box shall be typewritten and arranged as follows:

Project Name: Direction of View:

Location: Date/Time:

Photograph No.: Description of View:

-- End of Section --

File details come from the government source that posted it. Updated .