1-9_13R0102-0002_Atch_1_SPECS_Section_02_65_00 _UNDERGROUND_STORAGE_TANK_REMOVAL_08_APR_13.pdf

PDF 91 KB Posted

Attached to
Demolition of Base Buildings
Solicitation number
FA4427-13-R-0102
Issued by

About this file

13R0102-0002 Atch 1 Specs Section 02 65 00 Underground Storage Tank Removal

View the file

Other files

File Type Posted
Questions__ _Answers__2-15_May_13.pdf PDF
1-0_13R0102-0002_Amendment_2_DEMO_IDC.pdf PDF
2-6_13R0102-0002_Atch_1_Task_Description_30_Apr_13.pdf PDF
2-5_13R0102-0002_Atch_1_SPECS_Section_32_92_19_SEEDING_08_APR_13.pdf PDF
1-2_13R0102-0002_Fill-In_Section_B_thru_K.doc DOC document
1-1_13R0102-0002_DEMO_Conformed_Solicitation.pdf PDF
2-4_13R0102-0002_Atch_1_SPECS_Section_32_12_16_HOT-MIX_ASPHALT_(HMA)_FOR_ROADS_08_APR_13.pdf PDF
2-1_13R0102-0002_Atch_1_SPECS_Section_02_82_33.13_20 _REMOVAL_CONTROL_AND_DISPOSAL_OF_PAINT_WITH_LEAD_08_APR_13.pdf PDF
1-3_13R0102-0002_Atch_1_SPECS_COVER_and_INDEX_08_APR_13.pdf PDF
2-3_13R0102-0002_Atch_1_SPECS_Section_32_12_10_BITUMINOUS_TACK_ _PRIME_COATS_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_01_56_00_para_3.14.2_Attachment_1_Temporary_Staging_of_Contaminated_Soil.pdf PDF
1-7_13R0102-0002_Atch_1_SPECS_Section_02_41_00_DEMOLITION_08_APR_13.pdf PDF
2-7_13R0102-0002_Atch_3_Wage_Determination_Applicability.pdf PDF
1-8_13R0102-0002_Atch_1_SPECS_Section_02_61_13 _EXCAVATION_AND_HANDLING_OF_CONTAMINATED_MATERIAL_08_APR_13.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_01_56_00_para_3.14.2_Attachment_2_MAP.pdf PDF
1-6_13R0102-0002_Atch_1_SPECS_Section_01_56_00 _ENVIRONMENTAL_GENERAL_REQUIREMENTS_08_APR_13.pdf PDF
1-5_13R0102-0002_Atch_1_SPECS_Section_01_33_00 _SUBMITAL_PROCEDURES_08_APR_13.pdf PDF
2-0_13R0102-0002_Atch_1_SPECS_Section_02_82_16.00_20 _ENGINEERING_CONTROL_OF_ASBESTOS_CONTAINING_MATERIALS_08_APR_13.pdf PDF
2-2_13R0102-0002_Atch_1_SPECS_Section_03_30_00 _CAST-IN-PLACE_CONCRETE_08_APR_13.pdf PDF
1-4_13R0102-0002_Atch_1_SPECS_Section_01000_GENERAL_REQUIREMENTS_08_APR_13.pdf PDF
2-8_13R0102-0002_Questions__ _Answers_1_dated_06_May_13.pdf PDF
Demo-_Amendment_01-14_Mar_13.pdf PDF
Demo-SV-PPConference-12Mar13.pdf PDF
0-0_FA4427-13R0102_DEMO_IDC_SOLICITATION.pdf PDF
0-5_FA4427-13R0102_Atch_1_SPECS_Section_01_56_00.doc DOC document
1-0_FA4427-13R0102_Atch_3_Wage_Determination_Applicability.doc DOC document
0-4_FA4427-13R0102_Atch_1_SPECS_Section_01_33_00.doc DOC document
0-8_FA4427-13R0102_Atch_1_SPECS_02_82_16.00_20.doc DOC document
0-7_FA4427-13R0102_Atch_1_SPECS_Section_02_65_00.doc DOC document
0-9_FA4427-13R0102_Atch_1_SPECS_02_82_33.13_20.doc DOC document
1-2_FA4427-13R0102_Atch_6_Subcontractor_Consent_Form.doc DOC document
0-1_FA4427-13R0102_FILL_IN_Section_B_thru_K.doc DOC document
1-1_FA4427-13R0102_Atch_5_Past_Perf_Ltr-Questionnaire.doc DOC document
0-3_FA4427-13R0102_Atch_1_SPECS_SECT_01000_-_GENERAL_REQUIREMENTS_30_JAN_13.doc DOC document
0-2_FA4427-13R0102_Atch_1_SPECS_COVER_and_INDEX.doc DOC document
0-6_FA4427-13R0102_Atch_1_SPECS_Section_02_41_00.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDC FACILITY DEMOLITION

08 APR 2013

SECTION 02 65 00 Page 1

SECTION 02 65 00

UNDERGROUND STORAGE TANK REMOVAL

02/10

PART 1 GENERAL

1.1 UNIT PRICES (NOT USED)

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN PETROLEUM INSTITUTE (API)

API PUBL 1628S (1996) A Guide to the Assessment and

Remediation of Underground Petroleum Releases

API RP 1604 (1996; R 2001) Closure of Underground

Petroleum Storage Tanks

API RP 2003 (2008; 7th Ed) Protection Against Ignitions

Arising out of Static, Lightning, and Stray Currents

API RP 2219 (2005) Safe Operation of Vacuum Trucks in

Petroleum Service

API STD 2217A (2005; R 2009) Guidelines for Safe Work in

Inert Confined Spaces in the Petroleum and Petrochemical Industries

API Std 2015 (2001) Safe Entry and Cleaning of Petroleum

Storage Tanks

ASTM INTERNATIONAL (ASTM)

ASTM D 1556 (2007) Density and Unit Weight of Soil in

Place by the Sand-Cone Method

ASTM D 1557 (2009) Standard Test Methods for Laboratory

Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D 2167 (2008) Density and Unit Weight of Soil in

Place by the Rubber Balloon Method

ASTM D 2487 (2006e1) Soils for Engineering Purposes

(Unified Soil Classification System)

ASTM D 4397 (2009) Standard Specification for

Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications

SECTION 02 65 00 Page 2

ASTM D 6938 (2008a) Standard Test Method for In-Place

Density and Water Content of Soil and Soil- Aggregate by Nuclear Methods (Shallow Depth)

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-1-4006 (1998) Engineering and Design -- Removal of

Underground Storage Tanks (USTs)

EM 200-1-1 (1994) Environmental Quality -- Validation of

Analytical Chemistry Laboratories

EM 200-1-3 (2001) Engineering and Design -- Requirements for the Preparation of Sampling and Analysis Plans

EM 200-1-6 (1997) Environmental Quality -- Chemical

Quality Assurance for HTRW Projects

EM 200-1-7 (2001) Environmental Quality - Performance

Evaluation (PE) Program

EM 385-1-1 (2008) Safety and Health Requirements Manual

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 530-R-97-007 (1997) Best Management Practices (BMPs) for

Soils Treatment Technologies;, Suggested Operational Guidelines to Prevent Cross-Media Transfer of Contaminants During Cleanup Activities

EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes

EPA SW-846 (Third Edition; Update IV) Test Methods for

Evaluating Solid Waste: Physical/Chemical Methods

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of

Hazardous Waste

40 CFR 264 Standards for Owners and Operators of

Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and

Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

SECTION 02 65 00 Page 3

40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 279 Standards for the Management of Used Oil

40 CFR 280 Technical Standards and Corrective Action

Requirements for Owners and Operators of Underground Storage Tanks (UST)

CA STATE WATER RESOURCES CONTROL BOARD

23 CCR Division 3 Chapter 16 Underground Tank Regulations

1.3 SYSTEM DESCRIPTION

The work consists of removal, decontamination and disposal of underground storage tanks and associated piping and ancillary equipment, including but not limited to dewatering , disposal of contaminated soil, laboratory testing, providing reports which are required by regulatory agencies, and backfilling. The tanks were used for storing JP8 fuel. Residue remaining in the tank is considered a hazardous waste. Existing native soils are predominantly clay. Groundwater [has been encountered within 5 to 10 feet of the surface.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

SD-01 Preconstruction Submittals

Work Plan.

Site safety and health plan Excavation and material handling plan Field sampling and laboratory testing plan[G] Tank and piping removal and disposal plan[G] Spill and discharge control plan[G] Qualifications Laboratory Services State licensed hazardous waste transporter[G]

SD-06 Test Reports

Laboratory and field testing reports[G] Backfill Material[G].

Tank Contents Verification[G].

Contaminated Water Disposal[G].

Soil Examination, Testing, and Analysis[G].

Backfilling Tank Closure Report[G].

SECTION 02 65 00 Page 4

SD-11 Closeout Submittals

Building permit, inspection permits, and other permits Results of excavation Tank disposal paperwork;[G] Contaminated soil disposal paperwork;[G] Contaminated water disposal paperwork;[G] Identification of tanks removed and disposed of;[G] Salvage Rights Starting and ending dates of reporting period Tank Closure Report;[G] Cumulative quantities of soil excavated

1.5 QUALITY ASSURANCE

1.5.1 Qualifications

Substantiate a minimum of 2 years of tank removal experience, including subcontractors and personnel employed on the project, and certification by the State of California for tank removal work. Experience shall include removal, transportation, and disposal of underground tanks and associated piping, in conformance with the following:

a. API RP 1604

b. 40 CFR 280, State and local regulations and procedures.

c. Applicable safety rules and regulations.

d. Use of equipment and procedures for testing and vapor-freeing tanks.

e. Handling and disposal of types of wastes encountered in underground tank and pipe removal including disposal of underground tanks and associated piping.

f. Excavation, testing, and disposal of petroleum contaminated soils, liquids, and sludge.

g. Project titles, dates performed, owner's names, points of contact for each project with current contact phone numbers.

1.5.2 Laboratory Services

Submit documentation for laboratory services in accordance with State of California certification requirements [EM 1110-1-4006, EM 200-1-1, EM 200-1- 3, EM 200-1-6 and EM 200-1-7].

1.5.3 Support Staff

Identify all staff involved for the various components, including personnel collecting and shipping samples, and detail staff member's qualifications.

1.5.4 Preconstruction Conference and Work Plan

SECTION 02 65 00 Page 5

Prior to the commencement of work, a preconstruction conference will be scheduled by the Contracting Officer. Prepare and submit a comprehensive Work Plan within 30 days of contract award. The work plan shall conform to the requirements of this specification, API RP 1604, API Std 2015, API RP 2003, API STD 2217A and API RP 2219. Allow 14 days in the schedule for the Government's review and approval. No adjustment for time or money will be made for re-submittals required as a result of noncompliance. No work at the site is allowed, with the exception of site inspections and mobilization, until the Work Plan is approved. As a minimum, include the following in the Work Plan:

1.5.4.1 Site Safety and Health Plan

Furnish detailed safety, health, and accident prevention provisions and develop a Site Safety and Health Plan (SSHP). Incorporate the requirements of 29 CFR 1910 and EM 385-1-1 into the SSHP. Include current training certification statement for personnel prior to entry into the work site. Do not commence work until the SSHP is approved by the Contracting Officer. As a minimum, include the following:

a. Health and safety organization, including discussion of distribution of functions and responsibilities.

b. Organization and components of the SSHP.

c. Physical and chemical site hazard identification.

d. Basic toxicology and toxicity information.

e. Discussion of the EZ and CRZ.

f. Protective clothing.

g. Respiratory protection.

h. Air quality monitoring.

i. Personnel exposure guidelines.

j. Decontamination procedures.

k. Basic first aid review.

l. Emergency response and contingency plan.

m. Site entry and exit procedures.

n. Sampling procedures.

1.5.4.2 Excavation and Material Handling Plan

Describe methods, means, equipment, sequence of operations and schedule to be employed in excavation, transport, handling, borrowing source and stockpiling of soil during underground tank removal. Include shoring requirements. Fifteen days before beginning tank removal work, submit to the Contracting Officer, for approval, a material handling plan that

SECTION 02 65 00 Page 6 describes phases of dealing with the contaminated soil and water as it relates to the proposed tank[s] and piping removal, including methods of excavating, a material handling plan for the contaminated material, soil testing requirements, and water pumping and collection requirements.

1.5.4.3 Field Sampling and Laboratory Testing Plan

Submit a detailed Sampling and Analysis Plan in accordance with Section 01

35 45.00 10 CHEMICAL DATA QUALITY CONTROL.

Describe field sampling methods and quality control procedures. Identify laboratory and laboratory methods to be used for contamination testing.

Include sample reports showing sample identification for location, date, time, sample method, contamination level, name of individual sampler, identification of laboratory, and quality control procedures.

1.5.4.4 Tank and Piping Removal and Disposal Plan

Describe methods, means, sequence of operations, and schedule to be employed in the testing, pumping, cleaning, de-vaporizing, inspecting, cutting and removal, and disposal of underground storage tanks and piping. Include methods to be employed for product, sludge, vapor, and pumpable liquid removal; purging and inerting; and storage methods proposed for control of surface water. Also address the following:

a. Treatment Options

b. Identification of waste, tank and contaminated soil transporters and means of transport.

c. Disposal and alternate facilities, disposal or remediation.

d. Decontamination procedures and coordination with SSHP.

1.5.4.5 Spill and Discharge Control Plan

Develop a comprehensive spill and discharge control plan. Consider and provide contingency measures for potential spills and discharges from handling and transportation of contaminated soils and water. A possible source of guidance for assessment and remediation is API PUBL 1628S.

1.5.4.6 Site Safety And Health Officer

Identify an individual to serve as the Site Safety and Health Officer (SSHO) to report problems and concerns regarding health and safety to the Contracting Officer. Provide documentation that the SSHO possesses working knowledge of local and Federal occupational safety and health regulations, and provide training, in accordance with 29 CFR 1910 to Contractor employees in air monitoring practices and techniques. The SSHO shall remain onsite to provide day to day industrial hygiene support, including air monitoring, training, and daily site safety inspections. The SSHO may be assigned other duties, such as project foreman or quality control manager.

1.5.5 Permits and Licenses

As required or as directed by the Contracting Officer, obtain local, state, or federal permits and licenses that directly impact the Contractor's ability to perform the work prior to commencing removal operations.

SECTION 02 65 00 Page 7

1.5.6 Statutes and Regulations

Perform tank closures, removal, and disposal in accordance with 40 CFR 280, 40 CFR 262, 40 CFR 264, and 40 CFR 265 as well as the applicable local, State of California, and Federal regulations.

1.6 PROJECT/SITE CONDITIONS

Notify the Installation Environmental Coordinator (IEC) and the Contracting Officer 14 days prior to tank removal. The Contractor is responsible for contacting the Implementation Agency (IA) in accordance with the applicable reporting requirements.

PART 2 PRODUCTS

2.1 BACKFILL MATERIAL

Obtain backfill material from [the location indicated on the drawings] [offsite]. Classify backfill in accordance with ASTM D 2487 as GW, GP, GM, GC, SW, SP, SM, SC, MH, CL, or CH and free from roots and other organic matter, trash, debris, snow, ice or frozen materials. Secure and submit approved soil classification test results, including the chain-of-custody records,.prior to bringing offsite materials onsite. The testing frequency for backfill material is 1 per 1000 cubic yards or a minimum of 1 test. Use non-contaminated material removed from the excavation for backfill in accordance with Paragraph BACKFILLING.

2.2 PLASTIC SHEETING

Provide plastic sheeting conforming to ASTM D 4397.

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Furnish labor, materials, necessary permits, laboratory tests, and reports and equipment to remove and dispose of products remaining in the underground tanks; clean and vapor free the underground tanks and connecting piping.

3.1.1 Safety Guidelines

Comply with personnel safety guidelines in accordance with federal, state and local regulations.

3.1.2 Exclusion Zone (EZ) And Contamination Reduction Zone (CRZ)

Do not permit personnel, not directly involved with the project, to enter work zones, called the EZ and CRZ. The EZ is an area around the tank a minimum of 10 feet from the limits of the tank excavation. At the perimeter of the EZ, establish a CRZ. Clean equipment and personnel within the CRZ, as stated in the paragraph titled "Personnel and Equipment Decontamination."

Locate the Contractor's site office, parking area, and other support facilities outside the EZ and CRZ. Clearly mark and post boundaries of the

SECTION 02 65 00 Page 8

EZ and CRZ. Include a site map, outlining the extent of work zones and location of support facilities, in the SSHP.

3.1.3 Onsite Training

Prior to starting onsite work, conduct a health and safety training class directed by the SSHO [CIH] to discuss the implementation of the SSHP.

Notify the Contracting Officer 24 hours prior to beginning the training class.

3.1.4 Personnel Protection

Furnish appropriate personal safety equipment and protective clothing to personnel and ensure that safety equipment and protective clothing is kept clean and well maintained. Furnish three clean sets of personal protective equipment and clothing for use by the Contracting Officer or official visitors as required for entry into the EZ.

3.1.5 Respiratory Protection Program

Fully employ respiratory protection program, addressing respirator usage and training, in accordance with 29 CFR 1910 and EM 385-1-1.

3.1.6 Decontamination

Decontaminate or properly dispose of personal protective equipment and clothing worn in contaminated areas at the end of the work day. The SSHO [CIH] is responsible for ensuring that personal protective clothing and equipment are decontaminated before being reissued.

3.1.7 Emergency Response and First Aid Equipment

a. Prior to commencement of work, thoroughly review emergency response and contingency plan in accordance with 29 CFR 1910. In an emergency, take action to remove or minimize the cause of the emergency, alert the Contracting Officer, and institute necessary measures to prevent repetition of the emergency. Equip site-support vehicles with route maps providing directions to the medical treatment facility.

b. Provide appropriate emergency first aid equipment for treatment of exposure to site physical and chemical hazards. Provide and post a list of emergency phone numbers and points of contact for fire, hospital, police, ambulance, and other necessary contacts. Provide and post a route map detailing the directions to the nearest medical facility.

c. Notify the Contracting Officer of any unforeseen hazard or condition which becomes evident during work.

3.1.8 Burning and Explosives

Use of explosives or burning debris is not allowed. Do not permit ignition sources in the EZ and CRZ.

3.1.9 Protection of Existing Structures and Utilities

SECTION 02 65 00 Page 9

Take all necessary precautions to avoid damage to existing structures, their appurtenances, monitoring wells, or utilities that may be affected by work activities. Repair any damage to utilities, monitoring wells resulting from the Contractor's operations at no expense to the Government. Coordinate with the installation to locate underground utilities prior to beginning construction. Do not disturb utilities encountered which were not previously shown or otherwise located without approval from the Contracting Officer.

3.1.10 Shoring

Provide shoring FOR CONTAMINATED SITES.

3.2 TANK CONTENTS VERIFICATION

Conduct sampling and analysis in accordance with the approved Sampling and Analysis Plan. Submit reports, including the chain-of-custody records.

3.2.1 Sampling

Sample tank , pumpable liquids, tank coatings and sludge. If the data is not adequate, additional sampling and analysis to the extent required by the approved facility receiving the material is the responsibility of the Contractor. Meeting all regulatory requirements, including the preparation of hazardous materials and waste for transportation, is the responsibility of the Contractor.

3.2.2 Analysis

Contractor shall test tank contents for the parameters listed herein.

Include total petroleum hydrocarbons (TPH) [benzene, ethylbenzene, toluene and xylene in the analysis.

3.2.3 Characterization

Prior to removing any of the tank contents, characterize the contents to determine the type of required disposal based on local, state, and Federal disposal regulations. Characterize tank product, pumpable liquids, and sludge] in accordance with 40 CFR 261 and 40 CFR 279. Submit the waste contents determination and accompanying test results for each phase present in the tank to the Contracting Officer. The Contractor is responsible for any additional requirements identified by the disposal facility. Do not remove the tank contents until approval is given by the Contracting Officer.

3.3 CLEARING, GRUBBING AND REMOVALS

Perform clearing and grubbing as required and directed by the Contracting Officer. Saw cut concrete or asphalt pavement at the limits of removal and break, remove and dispose of the resulting debris off Government Property.

3.4 TOPSOIL (NOT USED)

3.5 PREPARATIONS FOR EXCAVATION

SECTION 02 65 00 Page 10

Before excavating, remove residual liquids trapped in the product lines and remove all product from the tank. Purge and vent the tank in accordance with API RP 1604, and as specified herein.

3.5.1 Removal of Product, Pumpable Liquids, and Sludge

Contain and store tank product, pumpable liquids, and sludge onsite, prior to disposal. Treat contaminated water as specified. Analyze and segregate tank product, pumpable liquids, and sludge to recover reusable products prior to being transported to the treatment, storage and disposal (TSD) facility. Use of Government facilities for permanent storage or disposal of the wastes is prohibited. Temporary storage on Government facilities will be allowed only until testing is complete, manifests are complete, and transportation is arranged. The Contractor is responsible for obtaining all required permits. Usable product shall be the property of the Contractor.

Provide approved containers, vehicles, equipment, labor, signs, labels, placards and manifests and associated land disposal restriction notices and notifications, necessary for accomplishment of the work, including materials necessary for cleaning up spills that could occur from tank removal operations.

3.5.2 Contaminated Water Disposal

3.5.2.1 Sampling, Analysis, and Containment

Sample and analyze contaminated water both prior to and after treatment.

Analyze contaminated water produced from excavation operations and tank pumping treated onsite, for pH; benzene, ethylbenzene, toluene, and xylene (BETX); total lead; oil and grease; total petroleum hydrocarbons (TPH).

Provide approved containers, vehicles, equipment, labor, signs, labels, placards and manifests and associated land disposal notices and notifications, necessary for accomplishment of the work.

3.5.2.2 Treatment

If contaminated water is to be treated onsite, specify the proposed treatment in the Work Plan and submit for approval, including the chain-of-custody records. Install temporary storage and treatment equipment in the general vicinity of the tanks at a location approved by the Contracting Officer. Sample and analyze treated effluent and secure approval of results by the Contracting Officer before discharge to the sanitary sewer. Treat and discharge effluent in accordance with the discharge permit.

3.6 PURGING AND INERTING

After the tank and piping contents have been removed, but prior to excavation beyond the top of the tank, disconnect all the piping except the piping needed to purge or inert the tank. Purge flammable and toxic vapors from the tank or make the tank inert in accordance with API RP 1604, with the exception that filling with water is not permitted and, if dry ice is employed, use a minimum of 3 pounds per 100 gallons of tank volume.

Continuously monitor the tank atmosphere for combustible vapors if the tank is purged, or continuously monitor for oxygen, if the tank is inerted.

3.7 EXCAVATION

Mark all excavation areas, as well as work near roadways.

SECTION 02 65 00 Page 11

3.7.1 Exploratory Trenches

Excavate exploratory trenches as necessary to determine the tank location, limits and the location of ancillary equipment. Upon commencing exploratory excavation, utilize organic vapor analyzer/flame ionization device (OVA/FID) equipment to obtain readings for [total petroleum hydrocarbons (TPH), and benzene, tolulene, ethylbenzene, and xylene (BTX), and toxicity characteristic leaching procedure (TCLP).

If BTEX indicates gasoline, then provide TCLP.

3.7.2 Tank Excavation

a. Provide Contracting Officer with written documentation, no later than 30 days before work begins, that proper State or local authorities have been notified. Notify the Contracting Officer at least 48 hours prior to start of tank removal work. Stage operations to minimize the time that tank excavation is open and the time that contaminated soil is exposed to the weather. Provide protection measures around the excavation area to prevent water runoff and to contain the soil within the excavation area.

b. Perform excavation around the perimeter of the tank to limit the amount of potentially petroleum contaminated soil that could be mixed with previously uncontaminated soil. Segregate petroleum contaminated soil in separate stockpiles.

c. Maintain an excavation around the tank of sufficient size to allow workers ample room to complete the work, but also protect the workers from sliding or cave-ins. Install sheeting, bracing, or shoring in the absence of adequate side slopes if there is a need for workers to enter the excavated area. Divert surface water to prevent direct entry into the excavation.

d. Dewatering of the excavation may require a discharge permit by the State and shall be limited to allow adequate access to the tank and piping, to assure a safe excavation, and to ensure that compaction and moisture requirements are met during backfilling. Dewatering may result in the production of petroleum contaminated water and/or free product. Recover free product from the groundwater only as part of necessary dewatering.

e. Collect and test water generated by dewatering during excavation required for removal of tanks or piping, surface water collected in open excavation, or water used for washing equipment or existing concrete or bituminous surfaces, in accordance with EPA 530-R-97-007, EPA 600/4-79/020, EPA SW-846 and state or locally required analyses.

3.7.3 Temporary Containment of Excavated Soil

Provide temporary containment area near the excavated area. Cover containment area with 30 mil polyethylene sheeting. Place excavated soil on the impervious barrier and cover with 6 mil polyethylene sheeting. Provide straw bale berm around the outer limits of the containment area and cover with polyethylene sheets. Secure edges of sheets to keep the polyethylene sheeting in place.

SECTION 02 65 00 Page 12

3.7.4 Piping Excavation

Perform excavation as necessary to remove tank piping and ancillary equipment in accordance with paragraphs: Shoring, Tank Excavation, and Open Excavations.

3.7.5 Open Excavations

Secure open excavations and stockpile areas while awaiting confirmation test results from the soil beneath the tank. Backfill the excavation as soon as possible after tank and contaminated soil removals have been completed and confirmation samples have been taken. Divert surface water around excavations to prevent water from directly entering into the excavation.

3.7.6 Hidden Structures

During excavation activities, if asphalt pavement, concrete slabs, or other hidden structures are encountered, remove and wash with high pressure water cleaning equipment. Remove and dispose of the pavement, concrete, and other structures as specified in Section 02 41 00 DEMOLITION.

3.7.7 Stockpiles

Uncontaminated excavated soil and petroleum contaminated soil, that is not a state-regulated hazardous waste, shall be stockpiled and used for backfill in the tank excavation prior to using borrow material. Separately stockpile uncontaminated soil from the contaminated soil, a safe distance away from, but adjacent to, the excavation. Place allowable stockpiles of contaminated soil on an impermeable geomembrane a minimum of 3 layers, each 6 mils thick, covered with a 6 mils sheet of geomembrane . Place the geomembrane to prevent the stockpiled soil from coming into contact with surface water run-off. Locate the geomembrane cover to prevent rain or surface water from coming into contact with the contaminated soil, as well as limit the escape of the volatile constituents in the stockpile.

3.7.8 Acceptable Levels of Contamination

Take further samples and test soils with OVA/FID readings for TPH and for BTEX and for Napthalene in accordance with the permit to remove USTs, and for toxicity characteristic leaching procedure (TCLP) for lead if leaded gasoline was stored in or near the underground tank being removed. For stockpiled soils, provide a minimum of one composite sample as 4:1 for every 50 cubic yards for TPH, BTEX, Naphalene and TCLP. Or provide a discrete sample for every 20 cubic yards. Soils that contain 1 ppm or more TPH, 5 ppb or more BTEX and Napthalene or have TCLP reading of 1 ppm lead or virgin petroleum products are considered contaminated materials. Soils which are less than the above may be used as clean fill. Furnish results to the Solano County inspector who will approve to backfill or not. Furnish results to the Contracting Officer within 24 hours after the results are obtained.

3.8 REMOVAL OF PIPING, ANCILLARY EQUIPMENT, AND TANK

3.8.1 Piping and Ancillary Equipment

SECTION 02 65 00 Page 13

Disconnect all piping and ancillary equipment from the tank. Remove the piping completely. Cap all tank ancillary equipment and piping connections, except those connections necessary to inert the tank within the excavation zone. Clean the piping exterior and ancillary equipment to remove all soil and inspect for signs of corrosion and leakage. Ensure no spillage of the piping contents occurs, as specified in the Work Plan, and as required in paragraph SPILLS. If the soil under and around the tank pad is contaminated, remove the tank pad and dispose of offsite at an approved hazardous waste facility.

3.8.2 Tank

Remove the tank from the excavation and clean the exterior to remove all soil and inspect for signs of corrosion, structural damage, or leakage. Use only non-sparking type materials or equipment which comes into contact with the tank, or in the vicinity of the excavation such as shovels, slings and tools. After removal from the excavation, place the tank on a level surface at an approved location and secure it with wood blocks to prevent movement.

3.8.3 Contaminated Soil, Tank and Piping Excavation Examination

a. After the tank has been removed from the ground, examine and test the adjacent and underlying soil for any evidence of leakage. Visually inspect the soil for staining after removal of all obviously contaminated soil, then screen for the presence of volatile and/or semi-volatile contamination using a real time vapor monitoring instrument or immunoassay field kits.

b. If tank is 20 feet or less in length, take two samples. Take each sample 2 feet from each end of the tank and 2 feet below the bottom of the excavation. If groundwater is encountered, follow the instruction from the permit to remove USTs for sampling.

c. If the tank is greater than 20 feet, take three samples. Take two samples 2 feet from each end of the tank and 2 feet below the bottom of the excavation. Take a third sample from the middle of the tank area and 2 feet below the bottom of the excavation. If groundwater is encountered, follow the instruction from the permit to remove USTs for sampling.

d. Analyze samples for TPH, BTEX, Napthalene and TCLP. Perform sampling and analysis conforming to standards specified above for stockpiled soils. Soils that contain 1 ppm or more TPH, 5 ppb or more BTEX and Napthalene, or have TCLP reading of 1 ppm of lead or virgin petroleum products are considered contaminated materials. Soils which are less than the above may be used as clean fill. Furnish results to the Solano County inspector who will approve to backfill or not.

Furnish results to the Contracting Officer within 24 hours after the results are obtained. Along with the results furnish a sketch showing underground tank, sampling location, and extent of excavations.

e. Transport offsite for disposal uncontaminated soil or petroleum contaminated soil not regulated by the state as hazardous waste.

Stockpile contaminated soil or suspected contaminated soil, or, if the site is a RCRA-designated CAMU, containerized until further disposition.

SECTION 02 65 00 Page 14

f. The Contracting Officer will determine the extent of the contaminated soil to be removed from each site per site. Report any evidence indicating that the amount of contaminated soil may exceed the individual site limit specified, to the Contracting Officer the same day it is discovered. If minimal additional excavation is required, the Contracting Officer may allow the Contractor to proceed. If extensive contamination is encountered, sample the excavation and backfill in accordance with paragraph BACKFILLING.

g. After the known contaminated soil is removed, sample and analyze the excavation.

3.8.4 Testing Along Piping

For every 20 linear feet of product delivery piping, take one soil sample and analyze for TPH, BTEX, and TCLP. Conform sampling and analysis of soil materials to EPA standards specified above.

3.9 TANK CLEANING

Provide clean and vapor free tank in accordance with API RP 1604 and the following:

a. Table of Tank History

b. Fuel Removal

All possible fuel will be pumped or otherwise removed from the tank by the Government. Consider remaining fuel contaminated or waste fuel;

pump into 55 gallon drums or other suitable containers for disposal in accordance with approved procedures meeting local, State, and Federal regulations. Dispose of remaining fuel emulsions in accordance with applicable local, State, and Federal regulations. Drums or tanks used for containerizing waste fuel will be furnished by the Contractor.

3.9.1 Exterior

Remove soil from the exterior of the tank, piping, and associated equipment to eliminate soil deposition on roadways during transportation to a temporary storage area, ensure markings will adhere to the surfaces, and simplify tank cutting. Use non-sparking tools to remove soil. Recover removed uncontaminated soil and soil not regulated by the state as a hazardous waste and use them as backfill in the former tank excavation.

Remove and containerize soil believed to be contaminated, or if the site is a RCRA designated CAMU, collect it on 3 layers of 6 mil impermeable geomembrane and stockpile it with other contaminated soil removed from the excavation.

3.9.2 Temporary Storage

If the tank is stored after the tank exterior is cleaned and ancillary equipment is removed, and prior to being cut into sections, label the tank as directed in API RP 1604, place it on blocks, and temporarily store it on a flat area adjacent to the excavation in the area of the existing tank site. Prior to cleaning the tank interior, monitor the tank atmosphere for

SECTION 02 65 00 Page 15 combustible vapors and purge or inert it if combustible vapors are detected.

Provide warning labels as follows:

"TANK HAS CONTAINED LEADED GASOLINE

NOT VAPOR FREE

NOT SUITABLE FOR STORAGE OF FOOD OR LIQUIDS

INTENDED FOR HUMAN OR ANIMAL CONSUMPTION

DATE OF REMOVAL: MONTH/DAY/YEAR"

Make tank unusable for future use, then transport and dispose of tank at an EPA approved disposal site in accordance with applicable local, State, and Federal regulations.

3.9.3 Interior

Clean tank interior using a high pressure (greater than 500 psi), low volume (less than 2 gpm) water spray or Steam clean tank interior until all loose scale and sludge is removed, and contamination, in the form of a sheen, is no longer visible in the effluent stream. Also clean the interior surfaces of piping, to the extent possible, using the same method used for cleaning the tank.

3.10 SOIL EXAMINATION, TESTING, AND ANALYSIS

3.10.1 Tank Excavation Sampling Procedures

After soil known to be contaminated has been removed or after soil excavation is complete, sample the excavation with procedures, number, location, and methodology in accordance with state regulations.

3.10.2 Stockpiled Material Sampling

Stockpiled contaminated soil shall be sampled and preserved in accordance with the approved Sampling and Analysis Plan. Sampling locations, number and specific procedures are as required by the State of CA implementing agency and the disposal facility.

3.10.3 Analysis

Test soil samples from the excavation and stockpiled material in accordance with the approved Sampling and Analysis Plan, and CHEMICAL DATA QUALITY CONTROL for the following parameters: total petroleum hydrocarbon (TPH) benzene, ethylbenzene, toluene, xylene (BETX). Submit copies of all test results, including the chain-of-custody records, to the Contracting Officer.

3.11 BACKFILLING

a. Backfill the tank area and any other excavations after the soil test results have been approved. Complete contaminated soil removal after the bottom of the tank excavation is determined to have soil contamination levels below the detection level of 1 ppm TPH approval by Contracting Officer.

SECTION 02 65 00 Page 16

b. Dewater the excavation if necessary. Use stockpiled material, subjected to chemical confirmation testing as backfill, if it is found to contain less than 1 ppm of total petroleum hydrocarbons (TPH), contain less than 5 ppb of BETX and Napthalene. Place clean backfill in layers with a maximum loose thickness of 8 inches, compacted to 90 percent maximum density for cohesive soils and 95 percent maximum density for cohesionless soils. Perform density tests using an approved commercial testing laboratory or by facilities furnished by the Contractor. Attach test results to Contractor's Quality Control Report; submit 3 copies of the report for each UST site opened, prepared in a standard 3-ring binder, within 14 days of completing work at each site. Label each binder with contract number, project name, location and tank number; each binder shall be indexed. Furnish a copy of the report to the Contracting Officer. Perform a minimum of 1 density test on each lift. Determine laboratory tests for moisture density relations in accordance with ASTM D 1557, Method B, C, or D, or ASTM D 6938. A mechanical tamper may be used, provided that the results are correlated with those obtained by the hand tamper.

Determine field in-place density shall be in accordance with ASTM D 1556, ASTM D 6938, or ASTM D 2167.

3.12 DISPOSAL REQUIREMENTS

3.12.1 Treatment, Disposal, and Recycling

Perform disposal of hazardous wastes in accordance with all local, State, and Federal solid and hazardous waste laws and regulations; the RCRA. This work includes all necessary personnel, labor, transportation, packaging, detailed analyses , manifesting or completing waste profile sheets, equipment, and reports. Recycle product and pumpable liquids removed from the tank to the greatest extent practicable. Provide manifest for each tank disposed of in this manner as required by the State of CA to document delivery and acceptance at the disposal facility.

3.12.2 Tank and Ancillary Equipment Disposal

After the tank, piping, and ancillary equipment have been removed from the excavation and the tank cleaned, cut the tank into sections with no dimension greater than 5 feet. Dispose of tank and piping sections in a State approved offsite disposal facility.

3.12.3 Transportation of Wastes

Provide transportation in accordance with Department of Transportation (DOT) Hazardous Material Regulations and State and local requirements, including obtaining all necessary permits, licenses, and approvals. Submit evidence that a State licensed [hazardous ]waste transporter is being used.

3.12.4 Salvage Rights

The Contractor retains the rights to salvage value of recycled or reclaimed product and metal not turned in to the DRMO or otherwise identified, so long as the requirements of 40 CFR 266 and 40 CFR 279, or the applicable State requirements are met. At the end of the contract, provide documentation on the disposition of salvaged materials.

SECTION 02 65 00 Page 17

3.12.5 Manifest Records

Maintain records of all waste determinations, including appropriate results of analyses performed, substances and sample location, the time of collection, and other pertinent data as required by 40 CFR 280, Section 74 and 40 CFR 262 Subpart D. Also record transportation, treatment, disposal methods and dates, the quantities of waste, the names and addresses of each transporter and the disposal or reclamation facility, shall and available for inspection, as well as copies of the following documents:

a. Manifests.

b. Waste analyses or waste profile sheets.

c. Certifications of final treatment/disposal signed by the responsible disposal facility official.

d. Land disposal notification records required under 40 CFR 268for hazardous wastes.

Upon contract close out, the records will become the property of the Government.

3.12.6 Hazardous/Special Waste Manifests

Provide manifesting conforming to the requirements of TRANSPORTATION AND

DISPOSAL OF HAZARDOUS MATERIALS.

3.12.7 Documentation of Treatment or Disposal

Take wastes, other than recyclable or reclaimable product or metal, to a treatment, storage, or disposal facility which has EPA or appropriate state permits and hazardous waste identification numbers and complies with the provisions of the disposal regulations. Furnish the original return copy of the hazardous waste manifest, signed by the owner or operator of a facility legally permitted to treat or dispose of those materials shall be furnished to the Contracting Officer not later than 5 working days following the delivery of those materials to the facility; and include a copy in the Tank Closure Report. Furnish a statement of agreement from the proposed treatment, storage or disposal facility and certified transporters to accept hazardous wastes to the Contracting Officer not less than 14 days before transporting any wastes. If the Contractor selects a different facility than is identified in the Work Plan, provide documentation for approval to certify that the facility is authorized and meets the standards specified in

40 CFR 264.

3.13 SPILLS

Use appropriate vehicles and operating practices to prevent spillage or leakage of contaminated materials from occurring during operations. Inspect vehicles leaving the area of contamination to ensure that no contaminated materials adhere to the wheels or undercarriage. Take immediate containment actions as necessary to minimize effect of any spill or leak. Cleanup in accordance with applicable Federal, State, local laws and regulations, and district policy at no additional cost to the Government. Refer to Section 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS for spill response and reporting requirements.

SECTION 02 65 00 Page 18

3.14 INSPECTIONS

Arrange for and perform required inspections. Provide copies of inspections to Contracting Officer.

3.15 TANK CLOSURE REPORT

Provide the Contracting Officer a Site Assessment/Tank Closure Report in a single binder notebook containing a collection of reports, records, starting and ending dates of reporting period, inspections, documentation, and data as follows:

a. Complete UST Notification Form (within 30 days of closure).

b. Description of work, including removal procedures, number of tanks removed, identification of tanks removed and disposed of (include site map showing location of tank and piping), cubic yards of excavated soil, location of disposal sites, and dates of excavation.

c. Site plan, including location of tanks and piping, limits of excavation, sampling points, results of excavation, and depths.

d. Laboratory and field testing reports, copies of data and test results from testing laboratory and the chain-of-custody records.

e. Tank disposal paperwork 3 copies of UST Notification Form and method of conditioning tank for disposal, contaminated soil disposal paperwork (include laboratory testing reports), and contaminated water disposal paperwork (include laboratory testing reports).

f. Certifications required by implementing agency.

g. Building permit, inspection permits, and other permitsrequired for underground tank removal, notifications, and inspection reports.

Include in Tank Closure Reports the following information as a minimum:

a. A cover letter signed by a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of this specification.

b. A narrative report describing what was encountered at each site, including:

(1) condition of the UST.

(2) any visible evidence of leaks or stained soils.

(3) results of vapor monitoring readings.

(4) actions taken including quantities of materials treated or removed.

SECTION 02 65 00 Page 19

(5) reasons for selecting sample locations.

(6) sample locations.

(7) collection data such as time of collection and method of preservation.

(8) reasons for backfilling site.

(9) whether or not groundwater was encountered.

c. Copies of all analyses performed for disposal.

d. Copies of all waste analyses or waste profile sheets.

e. Copies of all certifications of final disposal signed by the responsible disposal installation official.

f. Information on who sampled, analyzed, transported, and accepted all wastes encountered, including copies of manifests, waste profile sheets, land disposal restriction, notification and certification forms, certificates of disposal, and other pertinent documentation.

g. Copies of all analyses performed for confirmation that underlying soil is not contaminated, with copies of chain-of-custody for each sample. Analyses shall give the identification number of the sample used. Sample identification numbers shall correspond to those provided on the one-line drawings.

h. Scaled one-line drawings showing tank locations, limits of excavation, limits of contamination, underground utilities within 50 feet, sample locations, and sample identification numbers.

i. Progress Photographs. Take a minimum of 4 views of the site showing such things as the location of each tank, entrance/exit road, and any other notable site condition before work begins.

After work has been started at the site, photographically record activities at each work location daily. Photographs shall be 3 x 5 inches and shall include:

(1) Soil removal, handling, and sampling.

(2) Unanticipated events such as discovery of additional contaminated areas.

(3) Soil stockpile area.

(4) Tank.

(5) Site or task-specific employee respiratory and personal protection.

(6) Fill placement and grading.

(7) Post-construction photographs. After completion of work at each site, take a minimum of four (4) views of the site. Prints shall illustrate the condition and location of work and the state

SECTION 02 65 00 Page 20 of progress. The photographs shall be mounted and enclosed back-to-back in a double face plastic sleeve punched to fit standard three ring binders. Each color print shall show an information box, 1-1/2 x 3-1/2 inches. The information box for the 3 x 5 inch photographs shall be scaled down accordingly, or taped to the bottom of the photo. The box shall be typewritten and arranged as follows:

j. 3 copies of the report for each UST site opened, prepared in a standard 3-ring binder, within 14 days of completing work at each site. Label each binder with contract number, project name, location and tank number; each binder shall be indexed. Furnish a copy of the report to the Installation Environmental Coordinator.

3.16 COMPACTION, FINISH GRADING, AND SEEDING

Provide backfill, compaction, grading, and paving in accordance with contract. Line the excavation with two plastic sheets before backfilling.

-- End of Section --

PART 1 GENERAL
1.1 UNIT PRICES (Not Used)
1.2 REFERENCES
1.3 SYSTEM DESCRIPTION
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
1.5.2 Laboratory Services
1.5.3 Support Staff
1.5.4 Preconstruction Conference and Work Plan
1.5.4.1 Site Safety and Health Plan
1.5.4.2 Excavation and Material Handling Plan
1.5.4.3 Field Sampling and Laboratory Testing Plan
1.5.4.4 Tank and Piping Removal and Disposal Plan
1.5.4.5 Spill and Discharge Control Plan
1.5.4.6 Site Safety And Health Officer
1.5.5 Permits and Licenses
1.5.6 Statutes and Regulations

1.6 PROJECT/SITE CONDITIONS

PART 2 PRODUCTS
2.1 BACKFILL MATERIAL
2.2 PLASTIC SHEETING
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Safety Guidelines
3.1.2 Exclusion Zone (EZ) And Contamination Reduction Zone (CRZ)
3.1.3 Onsite Training
3.1.4 Personnel Protection
3.1.5 Respiratory Protection Program
3.1.6 Decontamination
3.1.7 Emergency Response and First Aid Equipment
3.1.8 Burning and Explosives
3.1.9 Protection of Existing Structures and Utilities
3.1.10 Shoring
3.2 TANK CONTENTS VERIFICATION
3.2.1 Sampling
3.2.2 Analysis
3.2.3 Characterization
3.3 CLEARING, GRUBBING AND REMOVALS
3.4 TOPSOIL (Not Used)
3.5 PREPARATIONS FOR EXCAVATION
3.5.1 Removal of Product, Pumpable Liquids, and Sludge
3.5.2 Contaminated Water Disposal
3.5.2.1 Sampling, Analysis, and Containment
3.5.2.2 Treatment
3.6 PURGING AND INERTING
3.7 EXCAVATION
3.7.1 Exploratory Trenches
3.7.2 Tank Excavation
3.7.3 Temporary Containment of Excavated Soil
3.7.4 Piping Excavation
3.7.5 Open Excavations
3.7.6 Hidden Structures
3.7.7 Stockpiles
3.7.8 Acceptable Levels of Contamination
3.8 REMOVAL OF PIPING, ANCILLARY EQUIPMENT, AND TANK
3.8.1 Piping and Ancillary Equipment
3.8.2 Tank
3.8.3 Contaminated Soil, Tank and Piping Excavation Examination
3.8.4 Testing Along Piping
3.9 TANK CLEANING
3.9.1 Exterior
3.9.2 Temporary Storage
3.9.3 Interior
3.10 SOIL EXAMINATION, TESTING, AND ANALYSIS
3.10.1 Tank Excavation Sampling Procedures
3.10.2 Stockpiled Material Sampling
3.10.3 Analysis
3.11 BACKFILLING
3.12 DISPOSAL REQUIREMENTS
3.12.1 Treatment, Disposal, and Recycling
3.12.2 Tank and Ancillary Equipment Disposal
3.12.3 Transportation of Wastes
3.12.4 Salvage Rights
3.12.5 Manifest Records
3.12.6 Hazardous/Special Waste Manifests
3.12.7 Documentation of Treatment or Disposal
3.13 SPILLS
3.14 INSPECTIONS
3.15 TANK CLOSURE REPORT
3.16 COMPACTION, FINISH GRADING, and SEEDING

File details come from the government source that posted it. Updated .