Attachment 18 - GEN REQ ATTACH Waste Manage.pdf

PDF 49 KB Posted

Attached to
Facility Enhancement and Maintenance IDIQ Federal contract opportunity
Solicitation number
FA441820R0004
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains a section on construction and demolition waste management requirements for a project and the related federal contract opportunity solicitation. The construction and demolition waste management section outlines requirements for waste analysis and management planning, salvage and reuse, recycling, and reporting. It requires at least 40% diversion of non-hazardous solid waste from landfills through recycling of construction and demolition debris.

The related federal contract opportunity is a solicitation for an Indefinite Delivery Indefinite Quantity contract for Facility Enhancement and Maintenance at Joint Base Charleston locations. The solicitation is set aside entirely for small businesses using tradeoff procedures. The estimated contract value is over $10 million with a minimum guarantee of $1,000 to be satisfied by attending a post-award conference. A pre-proposal site visit will also be conducted.

View the file

Other files for this federal contract opportunity

Other files attached to Facility Enhancement and Maintenance IDIQ, newest first.
File Type Posted
Solicitation Amendment FA441820R00040003 SF 30.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Questions and Answers FEM (Revised).pdf PDF
Attachment 14 -General Requirements FEM IDIQ.pdf PDF
Attachment 16 - GEN REQ ATTACH Environmental.pdf PDF
Attachment 19 - Technical Exhibit 6.pdf PDF
Attachment 21 - USAF Carpet Program Ordering Guide.pdf PDF
Attachment 23 - SEED PROJECT Bldg 112 Floorplan.pdf PDF
Attachment 20 - SIGN POST TEMPLATE.pdf PDF
Attachment 15 - GEN REQ ATTACH Green Pro.pdf PDF
Solicitation Amendment FA441820R00040002 SF 30.pdf PDF
Questions and Answers FEM.pdf PDF
Attachment 22 - Paint Sample Guidelines.pdf PDF
Attachment 17 - GEN REQ ATTACH Temp Env.pdf PDF
Attachment 4 - Schedule B.pdf PDF
Solicitation Amendment FA441820R00040001 SF 30.pdf PDF
Attachment 1 - Floor Covering SOW.pdf PDF
Attachment 3- Maintenance and Repairs SOW.pdf PDF
Attachment 6 - Berkeley County WD SC22.pdf PDF
Attachment 11 Protective Coating Sample Project.pdf PDF
Attachment 4 - Schedule B.pdf PDF
Attachment 2 - Protective Coating SOW.pdf PDF
Attachment 8 - Dorchester County WD SC24.pdf PDF
Attachment 5 - Orangeburg County WD SC16.pdf PDF
Solicitation - FA441820R0004.pdf PDF
Attachment 9 -Green Procurement Form.pdf PDF
Attachment 10 Floorcovering Sample Project.pdf PDF
Attachment 12 - Maintenance and Repairs Sample Project.pdf PDF
Attachment 13 - PPQ.pdf PDF
Attachment 7 - Charleston County WD SC23.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project # Project Title

Section 01 74 19.00 31 Page 1

SECTION 01 74 19.00 31

CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT (JB CHS-7/2014)

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Construction and Demolition Waste

Solid wastes such as building materials, packaging and rubble resulting from construction, remodeling, demolition and repair of buildings/facilities, paving and infrastructure.

1.1.2 Recyclable Materials

Products and materials that can be recovered and remanufactured into a new product. Recyclable materials include, but are not limited to, the following:

a. Metals (ferrous and non-ferrous), including banding, metal studs, ductwork, piping

b. Asphaltic concrete paving

c. Portland cement concrete

d. Land clearing debris including trees and plant materials

e. Native rock and granular fill

f. Gypsum products

g. Paper and cardboard

h. Wood products, including structural, finish, crates and pallets

i. Brick and masonry

j. Carpet and padding

k. Plastics

l. Copper wiring

m. Mechanical and electrical products and equipment

1.1.3 Recycling Facility

A business that specializes in collecting, handling, processing, distributing, or remanufacturing waste materials generated by demolition and new construction projects, into products or materials that can be used for this project or by others.

Section 01 74 19.00 31 Page 2

1.1.4 Salvage and Reuse

Existing usable product or material that can be saved and reused in some manner on the project site. Materials that can be salvaged and reused must comply with the applicable technical specifications and include, but are not limited to, the following:

a. Dimensional lumber and other wood products

b. Structural steel

c. Soil

d. Masonry products

1.1.5 Salvage for Resale

Existing usable product or material that can be saved and removed intact (as

is) from the project site to another site for resale to others without remanufacturing.

1.1.6 Trash

Product or material unable to be salvaged for resale, salvaged and reused, returned, or recycled.

1.1.7 Waste Material

Product or material that can be salvaged for resale, salvaged and reused, returned to vendors, or recycled.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33

00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Construction Waste Management Plan; G,

1.3 CONSTRUCTION WASTE MANAGEMENT

1.3.1 General Intent

The Contractor shall use all means available to divert to the greatest extent practical and economically feasible, construction and demolition waste from landfills and incinerators.

1.3.2 Construction Waste Management Operations

Take a pro-active, responsible role in management of construction waste and require all subcontractors, vendors, and suppliers to participate in the effort.

Establish a construction waste management program that includes the following categories:

Section 01 74 19.00 31 Page 3

a. Minimizing Packaging Waste

b. Salvage and reuse

c. Salvage for resale or donation

d. Recycling

e. Disposal

Salvage and reuse is a better waste management method than recycling because little or no reprocessing is necessary, thus less pollution is created when items are reused in their original form. Therefore, a diligent effort shall be made to salvage and reuse products and materials. Waste materials that cannot be salvaged and reused and have value as being recyclable, shall be recycled. Only trash shall be transported to a landfill or incinerator.

The Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling construction waste for this project. Revenues or other savings obtained for recycling or returns shall accrue to the Contractor.

1.3.3 Construction Waste Management Plan

Perform a waste analysis to determine the types and quantity of construction waste anticipated and identify salvage for resale, salvage and reuse, recycling and disposal options available. Within 30 days after contract award and prior to performing any demolition work, submit a Waste Management Plan for review and approval. The Waste Management Plan shall include the following:

a. Project waste analysis.

b. Projected cost of disposing of all trash and waste materials as if there would be no salvage or recycling on this project.

c. Name, address and phone number for each landfill or incinerator facility to be utilized.

d. Tipping fee for each landfill or incinerator.

e. A list of waste materials that will be salvaged for resale, salvaged and reused, and recycled.

f. Identification of each recycling facility to be utilized.

g. Anticipated net cost savings determined by subtracting the cost of separating and recycling from the following:

1. Savings due to reuse of demolished materials.

2. Revenue from the sale of salvaged and recycled materials.

Section 01 74 19.00 31 Page 4

3. Landfill or incinerator tipping fees saved due to diversion of materials to recycling.

h. Description of the method to be employed in recycling waste materials and description of the method that will be used to protect recycled materials from contamination.

i. Description of the means of transportation of recyclable materials and the destination of the materials.

1.3.4 Recycling

1.3.4.1 General Recycling Requirements

The contractor is required to recycle all recyclable material, not to financially overburden the Contractor. Primary recyclable materials include but are not limited to any concrete, asphalt and metal. Also, the Contractor should submit monthly (submitted with progress schedule used for invoicing) and annual/final Disposal and Recycling Reports for 628 CES/CEIE records (see attached form). The Disposal and Recycling Report shall include type of material recycled, recycled material tonnage, and tonnage of material disposed of in a landfill. This report shall be signed by the contractor prior to submittal. According to DUSD (ES) Letter, 13 May 98, New DOD Pollution Prevention Measure of Merit, sets the diversion rate requirement for non-hazardous solid waste as greater than 40% by recycling C&D Debris, while ensuring integrated non-hazardous solid waste management programs provide an economic benefit. AFI 32-7080 states, increase solid waste diversion rates where economically preferable. Recycling C&D Debris includes waste building materials, packaging, and rubble resulting from construction, remodeling, and demolition of building and structures. Additionally, ensure that the FAR document incorporates the tonnage of the solid waste that went to landfill and the tonnage recycled in the contract for the ESORT criteria.

1.4 PROGRAM IMPLEMENTATION AND MONITORING

Implement and maintain, for the duration of the project, the construction waste management program. Establish a method of monitoring and documenting the program, and submit a periodic report with each application for payment that includes the following:

a. Amount (by weight) and type of waste materials disposed of in a landfill or incinerator, the tip fee per ton, and the total cost of disposal including transportation costs, container rental costs, etc.

b. Amount (by weight) and type of materials salvaged for sale, salvaged for reuse, and recycled. Provide destination, means of transportation, cost of transportation and handling, tipping fee savings and revenue generated for each material.

c. Savings due to salvaging, reusing, and recycling materials.

1.4.1 Hazardous Materials/Hazardous Wastes

Section 01 74 19.00 31 Page 5

If any non-acceptable materials such as hazardous materials or hazardous wastes are encountered, notify the Contracting Officer.

1.5 SALVAGE AND REUSE

Encourage the practice of efficient waste management when, sizing, cutting, and installing products and materials.

1.6 SEPARATION OF RECYCLABLE WASTE MATERIAL

Provide the necessary containers and bins, to facilitate the waste management program, that are clearly and appropriately marked. Prevent contamination of recyclable materials from incompatible products and materials. Separate construction waste at the project site by one of the following methods:

a. Source Separated Method: Waste products and materials, that are recyclable, are separated from trash and sorted into appropriately marked separate containers and then transported to the respective recycling facility for further processing. Trash is transported to a landfill or incinerator.

b. Co-Mingled Method: All construction waste is placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed and the remaining trash is transported to a landfill or incinerator.

c. Other methods proposed by the Contractor and approved by the

Contracting Officer.

2 PART 2 PRODUCTS

Not used.

3 PART 3 EXECUTION

Not used.

-- End of Section --