Attachment 11 Protective Coating Sample Project.pdf

PDF 113 KB Posted

Attached to
Facility Enhancement and Maintenance IDIQ Federal contract opportunity
Solicitation number
FA441820R0004
Issued by
Department of the Air Force Air Mobility Command

About this file

This document outlines a solicitation for facility enhancement and maintenance services on an indefinite delivery/indefinite quantity (IDIQ) contract at Joint Base Charleston in South Carolina. The contractor will provide all labor, equipment, materials, and supervision necessary to complete facility enhancement and maintenance projects throughout all locations of Joint Base Charleston for the Air Force. The solicitation is issued as a 100% small business set-aside using trade-off procedures. The projected contract value is over $10 million with a minimum guarantee of $1,000 to be satisfied through attendance at a post-award conference. Questions regarding the solicitation should be directed to the point of contact provided.

View the file

Other files for this federal contract opportunity

Other files attached to Facility Enhancement and Maintenance IDIQ, newest first.
File Type Posted
Questions and Answers FEM (Revised).pdf PDF
Solicitation Amendment FA441820R00040003 SF 30.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Attachment 23 - SEED PROJECT Bldg 112 Floorplan.pdf PDF
Attachment 20 - SIGN POST TEMPLATE.pdf PDF
Attachment 15 - GEN REQ ATTACH Green Pro.pdf PDF
Attachment 18 - GEN REQ ATTACH Waste Manage.pdf PDF
Solicitation Amendment FA441820R00040002 SF 30.pdf PDF
Questions and Answers FEM.pdf PDF
Attachment 22 - Paint Sample Guidelines.pdf PDF
Attachment 17 - GEN REQ ATTACH Temp Env.pdf PDF
Attachment 4 - Schedule B.pdf PDF
Attachment 14 -General Requirements FEM IDIQ.pdf PDF
Attachment 16 - GEN REQ ATTACH Environmental.pdf PDF
Attachment 19 - Technical Exhibit 6.pdf PDF
Attachment 21 - USAF Carpet Program Ordering Guide.pdf PDF
Solicitation Amendment FA441820R00040001 SF 30.pdf PDF
Attachment 4 - Schedule B.pdf PDF
Attachment 2 - Protective Coating SOW.pdf PDF
Attachment 8 - Dorchester County WD SC24.pdf PDF
Attachment 5 - Orangeburg County WD SC16.pdf PDF
Solicitation - FA441820R0004.pdf PDF
Attachment 9 -Green Procurement Form.pdf PDF
Attachment 10 Floorcovering Sample Project.pdf PDF
Attachment 12 - Maintenance and Repairs Sample Project.pdf PDF
Attachment 13 - PPQ.pdf PDF
Attachment 7 - Charleston County WD SC23.pdf PDF
Attachment 1 - Floor Covering SOW.pdf PDF
Attachment 3- Maintenance and Repairs SOW.pdf PDF
Attachment 6 - Berkeley County WD SC22.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Protective Coating

Building 112, E. McCaw St.

Joint Base Charleston, SC (Air Base)

June 2020

GENERAL: The work to be performed is the preparation, priming and painting of approximately 20,142 square feet of wall, doors and trim within the facility. Areas identified include: 15 classrooms, 1 breakroom, 2 office areas, entryways and hallway. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for protective coating materials to perform the work requested. (Section 1.1.4)

LOCATION: Building 112, E. McCaw St., Joint Base Charleston, SC.

SCOPE OF WORK: The work includes but is not limited to the following items:

1. Surface Repair & Preparation:

Contractor shall accomplish approximately 52 sq. ft. of surface repairs (mud and/or tape) and prep all surfaces identified to accept paint. Areas not requiring painting shall be protected by the contractor to ensure no damage occurs. (Section 1.2.1.4)

2. Protective Coating Application:

Contractor shall apply approx. 20,142 of paint in accordance with paint product technical installation instructions and specifications. (Section 1.2.1.6) Paint colors will be identified by Facility Manager and COR and in accordance with Air Force Corporate Facility.

The following colors are approved for use per the Sherwin-Williams Paint Pallet:

Wall Colors SW 7073 (Nebulous White) SW 9101 (Tres Naturale)

SW 6385

Trim/Accent Colors SW 6122 (Camelback) SW 6123 (Baguette) SW 7039 (Virtual Taupe) SW 7046 (Anonymous) SW 0032 (Needlepoint Navy) SW 7740 (Messenger Bag)

Applicable Instructions:

Work areas may be occupied by the using activity during the course of work.

Caution must be taken to insure all safe work practices are adhered to while work is performed within the facility.

Contractor shall keep a clean work area daily. Paint spots, oil and stains upon adjacent surfaces shall be removed and the entire job left clean and acceptable. (Section 1.2.1.8)

--End--

File details come from the government source that posted it. Updated .