Attachment 10 Floorcovering Sample Project.pdf

PDF 112 KB Posted

Attached to
Facility Enhancement and Maintenance IDIQ Federal contract opportunity
Solicitation number
FA441820R0004
Issued by
Department of the Air Force Air Mobility Command

About this file

This document outlines a floorcovering sample project and related federal contract opportunity. The floorcovering sample project statement of work involves the removal and installation of approximately 12,660 square feet of floorcovering and 2,238 linear feet of cove base at Building 112 on Joint Base Charleston in South Carolina. It specifies preparation of the subfloor, installation of 1,337 square yards of carpet tiles and 630 square feet of luxury vinyl tile in designated areas, and 2,238 linear feet of rubber cove base. The related federal contract opportunity is solicitation number FA441820R0004 for an Indefinite Delivery Indefinite Quantity contract to provide facility enhancement and maintenance services at all Joint Base Charleston locations with a minimum guarantee of $1,000 and projected value over $10 million. It is designated as a 100% small business set-aside using trade-off procedures.

View the file

Other files for this federal contract opportunity

Other files attached to Facility Enhancement and Maintenance IDIQ, newest first.
File Type Posted
Questions and Answers FEM (Revised).pdf PDF
Solicitation Amendment FA441820R00040003 SF 30.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Attachment 23 - SEED PROJECT Bldg 112 Floorplan.pdf PDF
Attachment 20 - SIGN POST TEMPLATE.pdf PDF
Attachment 15 - GEN REQ ATTACH Green Pro.pdf PDF
Attachment 18 - GEN REQ ATTACH Waste Manage.pdf PDF
Solicitation Amendment FA441820R00040002 SF 30.pdf PDF
Questions and Answers FEM.pdf PDF
Attachment 22 - Paint Sample Guidelines.pdf PDF
Attachment 17 - GEN REQ ATTACH Temp Env.pdf PDF
Attachment 4 - Schedule B.pdf PDF
Attachment 14 -General Requirements FEM IDIQ.pdf PDF
Attachment 16 - GEN REQ ATTACH Environmental.pdf PDF
Attachment 19 - Technical Exhibit 6.pdf PDF
Attachment 21 - USAF Carpet Program Ordering Guide.pdf PDF
Solicitation Amendment FA441820R00040001 SF 30.pdf PDF
Attachment 4 - Schedule B.pdf PDF
Attachment 2 - Protective Coating SOW.pdf PDF
Attachment 8 - Dorchester County WD SC24.pdf PDF
Attachment 5 - Orangeburg County WD SC16.pdf PDF
Solicitation - FA441820R0004.pdf PDF
Attachment 9 -Green Procurement Form.pdf PDF
Attachment 12 - Maintenance and Repairs Sample Project.pdf PDF
Attachment 13 - PPQ.pdf PDF
Attachment 7 - Charleston County WD SC23.pdf PDF
Attachment 1 - Floor Covering SOW.pdf PDF
Attachment 3- Maintenance and Repairs SOW.pdf PDF
Attachment 6 - Berkeley County WD SC22.pdf PDF
Attachment 11 Protective Coating Sample Project.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Floorcovering

Building 112, E. McCaw St.

Joint Base Charleston, SC (Air Base)

June 2020

GENERAL: The work to be performed is the removal and installation of approximately 12,660 square feet of floorcovering and approximately 2,238 linear feet of rubber cove base. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for floorcovering materials to perform removal and replacement of floorcovering.

LOCATION: Building 112, E. McCaw St., Joint Base Charleston, SC.

SCOPE OF WORK: The work includes but is not limited to the following items:

1. Contractor shall lift and relocate existing furniture and appliances to facilitate the installation of the new materials. (Section 2.2.3.3)

a. Relocate approx. 470 pieces of light furniture, 20 ea. heavy furniture and 6 furniture systems.

b. Remove approx. 12,660 sq. ft. of floorcovering.

c. Remove approx. 2,238 lf. of cove base.

2. Contractor shall prepare the floor to acceptable industry standard as per new floorcovering requirements. (Section 2.2.5 & 2.2.6)

a. Subflooring shall be in a smooth, true, level plane, except where indicated as sloped.

b. Repair holes, cracks, depressions, or rough areas using material recommended by the floorcovering or adhesive manufacturer.

c. Any necessary preparation and compliance with industry standards and manufacturer recommendations shall be the responsibility of the contractor.

3. Contractor shall provide and install new carpet tiles in the identified areas. Samples will be provided so the customer can make selections. (Section 2.2.4)

a. Install 1,337 sq.yds. Carpet Tiles w/adhesive in 15 classrooms, hallway and office areas.

b. Install 630 sq. ft. of Luxury Vinyl Tile w/adhesive in breakroom.

c. Install approx. 2238 lf. of rubber cover base.

Applicable Instructions:

Work areas may be occupied by the using activity during the course of work.

Caution must be taken to insure all safe work practices are adhered to.

Caution shall be taken to prevent damage to the wall surfaces during removal process.

All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, manufacture specifications, and industry standards.

Low VOC materials shall be used and work areas shall be well ventilated.

Contractor shall keep a clean work area daily.

--End--