These architectural and engineering drawings detail renovation plans for Building 90131 at Hurlburt Field, specifically for Special Operations Support (SOS) Alter 2 project. The comprehensive set includes first floor plans, reflected ceiling plans, room finish schedules, mechanical and electrical plans, and technical specifications dated 15 July 2015. Drawings cover multiple technical disciplines including architectural layouts, mechanical systems, plumbing configurations, electrical power plans, and network infrastructure diagrams. Key technical elements include detailed floor plans showing room configurations, mechanical equipment placement, electrical circuitry, and specialized infrastructure for what appears to be a military facility upgrade or renovation, with specific attention to mechanical, electrical, and communications systems integration.
The drawings provide granular technical details such as room finish specifications, signage requirements, mechanical equipment connections, and network/data system single-line diagrams. Specific technical notes indicate requirements for installing new mechanical systems, routing of piping and electrical conduits, and provisions for specialized communication infrastructure including fiber optic cabling and secured data network configurations. The documents appear to be final submittal drawings for a comprehensive facility modification project at Hurlburt Field, with precise engineering specifications for a complex technical renovation of an existing military building.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
N E
W
W
O R
K
M
E C
H A
N I C
A L
P
O W
E R
P
L A
N
E-12
GOVERNMENT FURNISHED AND INSTALLED NETWORK EQUIPMENT
FIBER OPTIC HIGH DENSITY PATCH PANEL, PORT QUANTITY, MODULE/FIBER TYPE AND COLOR INDICATED, RACK MOUNT. LABEL AT OPPOSITE ENDS OF TERMINATIONS TO IDENTIFY FIBER PAIRS. LABEL FRONT COVER TO INDICATE SOURCE AND EACH DESTINATION(S).
FIBER OPTIC PATCH PANEL, PORT QUANTITY, MODULE/FIBER TYPE AND COLOR INDICATED, RACK MOUNT. LABEL AT OPPOSITE ENDS OF TERMINATIONS TO IDENTIFY FIBER PAIRS. LABEL FRONT COVER TO INDICATE SOURCE AND EACH DESTINATION(S).
FIBER OPTIC CABLE, 50 MM HIGH DENSITY CABLING, STRAND COUNT AND COLOR INDICATED, PLENUM RATED. COIL (48") SLACK FIBER IN DRAWER USING FACTORY HARDWARE. RUN CONTINUOUS FROM SOURCE TO DESTINATION WITH NO SPLICES OR TERMINATIONS.
FIBER OPTIC CABLE, 50 MM CABLING, STRAND COUNT AND COLOR INDICATED, PLENUM RATED. COIL (48") SLACK FIBER IN DRAWER USING FACTORY HARDWARE. RUN CONTINUOUS FROM SOURCE TO DESTINATION WITH NO SPLICES OR TERMINATIONS.
FIBER OPTIC CABLE, SINGLEMODE HIGH DENSITY CABLING, STRAND COUNT AND COLOR INDICATED, PLENUM RATED. COIL (48") SLACK FIBER IN DRAWER USING FACTORY HARDWARE. RUN CONTINUOUS FROM SOURCE TO DESTINATION WITH NO SPLICES OR TERMINATIONS.
FIBER OPTIC CABLE, SINGLEMODE CABLING, STRAND COUNT AND COLOR INDICATED, PLENUM RATED. COIL (48") SLACK FIBER IN DRAWER USING FACTORY HARDWARE. RUN CONTINUOUS FROM SOURCE TO DESTINATION WITH NO SPLICES OR TERMINATIONS.
FIBER OPTIC PATCH CORD, DUAL FIBER, 50 MM CABLING, COLOR AND DUAL CONNECTORS EACH END INDICATED. PROVIDE QUANTITIES AND
LENGTHS AS REQUIRED.
FIBER OPTIC PATCH CORD, DUAL FIBER, SINGLEMODE CABLING, COLOR AND DUAL CONNECTORS EACH END INDICATED. PROVIDE QUANTITIES AND
LENGTHS AS REQUIRED.
PROVIDE ACCESS FLOOR BREAK-OUT BOX, WITH FUSION SPLICE CASE, COILED SLACK, AND TERMINATE CABLE ON EACH PATCH MODULE CONNECTOR FOR PATCHING INTO GCS/FGCS EQUIPMENT WITH GFGI PATCH CORDS. PROVIDE QUANTITY AS REQUIRED. ENSURE SEPARATE
BREAK-OUT BOXES ARE PROVIDED FOR EACH SYSTEM CABLING (I.E. GREEN, RED, YELLOW).
FOR MOBILE GCS, PROVIDE BREAK-OUT BOX ENCLOSURE WITH CABLING PASS-THRU GROMMET. BREAK-OUT BOX SHALL CONTAIN FUSION SPLICE CASE, WITH COILED SLACK; TERMINATE CABLE ON EACH PATCH MODULE CONNECTOR FOR PATCHING INTO GCS/FGCS EQUIPMENT WITH GFGI PATCH CORDS. PROVIDE QUANTITY AS REQUIRED. ENSURE SEPARATE BREAK-OUT BOXES ARE PROVIDED FOR EACH SYSTEM CABLING (I.E. GREEN, RED, YELLOW). INSTALL A 30' SPOOL BEYOND THE ENCLOSURE.
GFGI DE-CRYPTION
EQUIPMENT
PROVIDE REQUIRED QUANTITY
OF PATCH PANELS, JACK CABLE
TO MATCH CABLE COLOR.
TYPICAL BREAK-OUT BOX
GFGI DE-CRYPTION
EQUIPMENT
PROVIDE REQUIRED QUANTITY
OF PATCH PANELS, JACK CABLE
TO MATCH CABLE COLOR.
24 PORT, 50 MM, DUAL ST RED
12 PORT, SM, DUAL ST, RED
50 MM, DUAL ST, RED
SM, DUAL ST, RED
GFGI DE-CRYPTION
EQUIPMENT
PROVIDE REQUIRED QUANTITY
OF PATCH PANELS, JACK CABLE
TO MATCH CABLE COLOR.
TYPICAL BREAK-OUT BOX
PROVIDE REQUIRED QUANTITY
OF PATCH PANELS, JACK CABLE
TO MATCH CABLE COLOR.
24 PORT, 50 MM, DUAL LC YELLOW
12 PORT, SM, DUAL LC, YELLOW
50 MM, DUAL LC, YELLOW
SM, DUAL LC, YELLOW
96 PORT, MM, DUAL ST, RED
24 STRAND, RED
12 STRAND, RED
24 STRAND, YELLOW
12 STRAND, YELLOW
96 STRAND, RED 96 PORT, MM, DUAL ST, RED
MM, DUAL ST, RED MM, DUAL ST, RED
GFGI DE-CRYPTION
EQUIPMENT
24 PORT, SM, DUAL ST, RED 24 STRAND, RED 24 PORT, SM, DUAL ST, RED
SM, DUAL ST, RED SM, DUAL ST, RED
GFGI DE-CRYPTION
EQUIPMENT
96 PORT, MM, DUAL LC, YELLOW 96 STRAND, YELLOW 96 PORT, MM, DUAL LC, YELLOW
MM, DUAL LC, YELLOW MM, DUAL LC, YELLOW
GFGI DE-CRYPTION
EQUIPMENT
24 PORT, SM, DUAL LC, YELLOW 24 STRAND, YELLOW 24 PORT, SM, DUAL LC, YELLOW
SM, DUAL LC, YELLOW SM, DUAL LC, YELLOW
S E
C U
R E
D
D
A T
A
S
Y S
T E
M
I N
G L
E
L
I N
E
D
I A
G R
A M
T-7
| G-1 TITLE SHEET 90131 |
| AD-1 DEMOLITION FLOOR PLAN 90131 |
| A-1 NEW WORK FLOOR PLAN 90131 |
| A-2 REFLECTED CEILING PLAN 90131 |
| A-3 BUILDING SECTIONS 90131 |
| A-4 DOOR SCHED 90131 |
| A-5 DETAILS 90131 |
| 15021FP101-- |
| 15021FP102-- |
| 15021FP103-- |
| 15021FP104-- |
| 15021P101 |
| 15021P102 |
| 15021M001 |
| 15021M001-- |
| 15021M101-- |
| 15021M102-- |
| 15021M103-- |
| 15021M104-- |
| 15021M105-- |
| 15021M301-- |
| 15021M501-- |
| 15021M502-- |
| 15021M601-- |
| 15021M602-- |
| 15021M701-- |
| 15021M702-- |
| E-1 LEGEND |
| E-2 RISERS |
| E-3 PANEL SCHEDULES |
| E-4 PANEL SCHEDULES |
| E-5 PANEL SCHEDULES |
| E-6 LTG DETAILS |
| E-7 PWR |
| E-8 ENLARGED PWR |
| E-9 ENLARGED SERVER POWER |
| E-10 FIRE |
| E-11 LTS |
| E-12 MECH PWR |
| E-13 DEMO |
| T-1 LEGEND & NOTES-Layout1 |
| T-2 COMM-Layout1 |
| T-3 TELECOM DETAILS |
| T-4 TELECOM DETAILS |
| T-5 VOICE SL |
| T-6 DATA SL |
| T-7 SECURED DATA SL |
File details come from the government source that posted it. Updated .