4e Air Unit Schedules B90131.pdf
PDF 112 KB Posted
- Attached to
- Hurlburt Field HVAC MACC Federal contract opportunity
- Solicitation number
- FA441725R0017
About this file
This document is an Air Terminal Unit Schedule and Pump Schedule technical specification sheet, detailing mechanical and electrical specifications for HVAC equipment units and pumps. The schedules provide comprehensive technical data including normal capacity, nominal airflow, external static pressure, electrical characteristics (volts, phase, hertz), and other engineering specifications for multiple air terminal units (WGV.x series) and pumps (HWP-1 type). The schedules include detailed notes and guidelines for installation, such as round inlet duct connection requirements and general unit notes. A separate Computer Room Air Conditioner Schedule is also included, listing similar technical specifications for computer room cooling equipment. The document appears to be part of the technical documentation for the Hurlburt Field HVAC Multiple Award Construction Contract (MACC), providing precise engineering specifications for potential contractors to reference when bidding on or executing HVAC system work.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .