Revised 504 PDF DWGS MINUS MEZZ.pdf

PDF 14 MB Posted

Attached to
Multiple Award Construction Contract (MACC) - Scott AFB IL
Solicitation number
FA4407-09-R-0003
Issued by

About this file

Revised Drawings (in .pdf format) EOD Addition (MACC Seed Project)

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Questions and Answers_10 Jul 09.docx DOCX document
Section 01010 —
Amendment 0008.pdf PDF
M-4DWV - Sheet 19 of 24.pdf PDF
Q A 8 1 Jul 09.pdf PDF
Amendment007.pdf PDF
M-5HANDCWTR - Sheet 20 of 24.pdf PDF
A-1 Site Plan - Sheet 4 of 24.pdf PDF
08700 HARDWARE —
Amendment 0006_Time Extension.pdf PDF
REVISED 504 EOD S-3 ROOF FRAMING PLAN.dwg DWG drawing
Revised SPECS.pdf PDF
REVISED 504 EOD A-5 SECTIONS.dwg DWG drawing
REVISED 504 EOD A-2 FLOOR PLANS.dwg DWG drawing
REVISED 504 EOD M-2 gas.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD E-1 POWER-LGT-COMM.dwg DWG drawing
REVISED 504 EOD X-1 COVER SHEET.dwg DWG drawing
Amendment 0005_Revised Spec and Dwgs.pdf PDF
REVISED QA-USACE-504 EOD C-1 SITE PLAN.dwg DWG drawing
REVISED 504 EOD S-2 FOUNDATION PLAN.dwg DWG drawing
REVISED 504 EOD M-6Sch.dwg DWG drawing
REVISED 504 EOD C-2 CIVIL DETAILS.dwg DWG drawing
REVISED 504 EOD M-3condunits.dwg DWG drawing
REVISED 504 EOD M-4DWV.dwg DWG drawing
REVISED 504 EOD M-7Sprinkler.dwg DWG drawing
REVISED 504 EOD M-5HandCwtr.dwg DWG drawing
REVISED 504 EOD A-1 SITE.dwg DWG drawing
REVISED 504 EOD A-4 SCHEDULES.dwg DWG drawing
plot.log LOG file
REVISED 504 EOD E-2 GRD-HVAC-FA.dwg DWG drawing
REVISED 504 EOD First Floor Plan XREF.dwg DWG drawing
REVISED 504 EOD M-1ducts.dwg DWG drawing
REVISED 504 EOD S-4 STRUCTURAL DETAILS.dwg DWG drawing
REVISED 504 EOD AID-1 INTERIOR DESIGN.dwg DWG drawing
REVISED 504 EOD A-7 DETAILS.dwg DWG drawing
REVISED 504 EOD A-3 ELEVATIONS.dwg DWG drawing
REVISED 504 EOD S-1STRUCTURAL NOTES.dwg DWG drawing
Revised Bid Schedule.pdf PDF
Amendment 0004_16 Jun 09.pdf PDF
Attachment 3 Past Performance Package.docx DOCX document
QUESTIONS AND ANSWERS_9 Jun 09.pdf PDF
Amendment 0003_Site Visit.pdf PDF
PreProposal Meeting Minutes to Include Q_A.pdf PDF
Preproposal Conference _1Jun 09.pptx PPTX presentation
Pre Proposal Sign In Sheets_1 Jun 09.pdf PDF
QUESTIONS AND ANSWERS_27 May 09.pdf PDF
Amendment 0002_Revised Section L_2.pdf PDF
REVISED 504 EOD A-3 ELEVATIONS.dwg DWG drawing
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X-1 Cover Sheet - Sheet 1 of 24

C-1 Site Plan - Sheet 2 of 24
C-2 Civil Details - Sheet 3 of 24
A-1 Site Plan - Sheet 4 of 24
A-2 Floor Plans - Sheet 5 of 24
A-3 Elevations - Sheet 6 of 24
A-4 Schedules - Sheet 7 of 24
A-5 Sections - Sheet 8 of 24
A-6 Schedules - Sheet 9 of 24
A-7 Schedules - Sheet 10 of 24
ID-1 Interior Design Plan - Sheet 11 of 24
S-1 Structural Notes - Sheet 12 of 24
S-2 Foundation Plan - Sheet 13 of 24
S-3 Roof Framing Plan - Sheet 14 of 24
S-4 Structural Details - Sheet 15 of 24
M-1 Ducts - Sheet 16 of 24
M-2GAS - Sheet 17 of 24
M-3CONUNITS - Sheet 18 of 24
M-4DWV - Sheet 19 of 24
M-5HANDCWTR - Sheet 20 of 24
M-6SCH - Sheet 21 of 24
M-7SPRKR - Sheet 22 of 24
E-1 Power-Lgt-COMM - Sheet 23 of 24
E-2 GRD-HVAC-FA - Sheet 24 of 24