Amendment 0004_16 Jun 09.pdf

PDF 46 KB Posted

Attached to
Multiple Award Construction Contract (MACC) - Scott AFB IL Federal contract opportunity
Solicitation number
FA4407-09-R-0003
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) - Scott AFB IL, newest first.
File Type Posted
Amendment 0009.pdf PDF
Questions and Answers_10 Jul 09.docx DOCX document
Amendment 0008.pdf PDF
M-4DWV - Sheet 19 of 24.pdf PDF
08700 HARDWARE —
Q A 8 1 Jul 09.pdf PDF
M-5HANDCWTR - Sheet 20 of 24.pdf PDF
A-1 Site Plan - Sheet 4 of 24.pdf PDF
REVISED 504 EOD E-1 POWER-LGT-COMM.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD M-3condunits.dwg DWG drawing
REVISED 504 EOD A-4 SCHEDULES.dwg DWG drawing
REVISED 504 EOD S-3 ROOF FRAMING PLAN.dwg DWG drawing
REVISED 504 EOD M-1ducts.dwg DWG drawing
plot.log LOG file
REVISED 504 EOD A-3 ELEVATIONS.dwg DWG drawing
REVISED 504 EOD S-4 STRUCTURAL DETAILS.dwg DWG drawing
REVISED 504 EOD First Floor Plan XREF.dwg DWG drawing
REVISED 504 EOD S-1STRUCTURAL NOTES.dwg DWG drawing
REVISED 504 EOD AID-1 INTERIOR DESIGN.dwg DWG drawing
REVISED 504 EOD E-2 GRD-HVAC-FA.dwg DWG drawing
REVISED 504 EOD A-7 DETAILS.dwg DWG drawing
REVISED 504 EOD X-1 COVER SHEET.dwg DWG drawing
Amendment 0005_Revised Spec and Dwgs.pdf PDF
REVISED 504 EOD C-2 CIVIL DETAILS.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
Revised Bid Schedule.pdf PDF
QUESTIONS AND ANSWERS_9 Jun 09.pdf PDF
Amendment 0003_Site Visit.pdf PDF
PreProposal Meeting Minutes to Include Q_A.pdf PDF
Preproposal Conference _1Jun 09.pptx PPTX presentation
Pre Proposal Sign In Sheets_1 Jun 09.pdf PDF
Amendment 0002_Revised Section L_2.pdf PDF
REVISED 504 EOD A-2 FLOOR PLANS.dwg DWG drawing
QA-USACE-504 EOD C-1 SITE PLAN v2004 —
REVISED 504 EOD A-5 SECTIONS.dwg DWG drawing
REVISED 504 EOD M-2 gas.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD X-1 COVER SHEET.dwg DWG drawing
REVISED 504 EOD S-4 STRUCTURAL DETAILS.dwg DWG drawing
REVISED 504 EOD S-1STRUCTURAL NOTES.dwg DWG drawing
REVISED 504 EOD A-4 SCHEDULES.dwg DWG drawing
REVISED 504 EOD M-5HandCwtr.dwg DWG drawing
REVISED 504 EOD Floor Plan XREF.dwg DWG drawing
REVISED 504 EOD A-3 ELEVATIONS.dwg DWG drawing
REVISED 504 EOD AID-1 INTERIOR DESIGN.dwg DWG drawing
REVISED 504 EOD M-4DWV.dwg DWG drawing
Specifications _EOD MACC Seed.pdf PDF
Exhibit 1_Seed Project without Specs and Drwgs.pdf PDF
FA4407-09-R-0003_With Attachments_14 May 09.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) - Scott AFB IL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of this Amendment is to extend the proposal due date and incorporate minor changes to the solicitation due to questions received. (Changes are identif ied in italics)

2. Replace Exhibit 1, Seed Project Price Schedule w ith Revised Seed Project Price Schedule.

3. Revised Specif ications and Draw ings show ing the revision in project scope (removal of mezzanine) w ill be posted in a follow ing

Amendment.

4. Remove the requirement to submit a CD version of Part I and Part II of the proposal.

5. The proposal due date has been extended to Wednesday, 1 July 2009 at 4:30 CDT.

6. All other terms and conditions remain the same

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4407-09-R-0003

X 9B. DATED (SEE ITEM 11)

15-May-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2009

CODE

375 CONS/LGC

201 E WINTERS STREET BLDG 50

SCOTT AFB IL 62225-5015

FA4407 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4407-09-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-Jun-2009 04:30 PM to 01-Jul-2009 04:30 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS/ EXHIBITS

ATTACHMENTS DESCRIPTION

1 (See Note) General Decision Number: IL080017 04/10/2009 IL17

Superseded General Decision Number: IL20070017

State: Illinois

Construction Types: Heavy and Highway

Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.

2 (See Note General Decision Number: IL080007 04/17/2009 IL7

Superseded General Decision Number: IL20070007

State: Illinois

Construction Types: Building and Residential

Counties: Madison and St Clair Counties in Illinois.

3 Past Performance Package

4 Operational Climatic Data Summary

5 General Requirements

6 Financial Data Form

7 GeoBase Requirments

8 Invoicing Instructions (WAWF)

9 Scott AFB Architectural Compatibility Plan (Jan 2000)

Hard Copy will be made available at Pre-Proposal Conf

Exhibit 1 MACC Seed Project

Revised Price Schedule MACC Seed Project Revised Price Schedule

Note: Attachment 1and 2 can be found on the Department of Labor website at http://www.wdol.gov/dba.aspx http://www.wdol.gov/dba.aspx

FA4407-09-R-0003

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

L-1 Instructions to Offerors

L-1.8 The seed project (initial task order) price proposal plus contract forms (Part I) and past performance information (Part II) shall include the documentation listed below. The price proposal must be based on the offeror's proposal for the seed project as set forth in the task order solicitation documents incorporated herein as Exhibit 1.

The Government will evaluate the proposal in accordance with Section M. Offerors shall submit 2 hard copies

(one originial/one copy) of Part I. Offerors shall submit 2 hard copies (one originial/one copy) of Part II.

PROPOSAL PREPARATION

L-2. PROPOSAL PREPARATION INSTRUCTIONS

L-2.3 Specific Instructions:

PART I – PRICE PROPOSAL/CONTRACT DOCUMENTS

- Submit original and one (1) copy

(c) Complete the necessary fill-ins and certifications in Sections I through K. Section G shall be returned in its entirety. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

All clauses that require a fill in and that are applicable to the basic contract and or see project must be completed and submitted with your offer.

PART II – PAST PERFORMANCE INFORMATION - Limited to no more than 3 pages per contract listed. Only references for same or similar type contract desired. Submit original plus one (1) copy..

(b) Performance Surveys: The government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Provide a list of no more than three (3), of the most relevant contracts performed for Federal agencies and commercial customers within the last three (3) years . Relevant contracts include a minimum of one design-build construction project and bid-build construction projects with a project magnitude between $500K and $5M each.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .