Amendment 0004_16 Jun 09.pdf
PDF 46 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) - Scott AFB IL Federal contract opportunity
- Solicitation number
- FA4407-09-R-0003
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) - Scott AFB IL has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of this Amendment is to extend the proposal due date and incorporate minor changes to the solicitation due to questions received. (Changes are identif ied in italics)
2. Replace Exhibit 1, Seed Project Price Schedule w ith Revised Seed Project Price Schedule.
3. Revised Specif ications and Draw ings show ing the revision in project scope (removal of mezzanine) w ill be posted in a follow ing
Amendment.
4. Remove the requirement to submit a CD version of Part I and Part II of the proposal.
5. The proposal due date has been extended to Wednesday, 1 July 2009 at 4:30 CDT.
6. All other terms and conditions remain the same
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4407-09-R-0003
X 9B. DATED (SEE ITEM 11)
15-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2009
CODE
375 CONS/LGC
201 E WINTERS STREET BLDG 50
SCOTT AFB IL 62225-5015
FA4407 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4407-09-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 22-Jun-2009 04:30 PM to 01-Jul-2009 04:30 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS/ EXHIBITS
ATTACHMENTS DESCRIPTION
1 (See Note) General Decision Number: IL080017 04/10/2009 IL17
Superseded General Decision Number: IL20070017
State: Illinois
Construction Types: Heavy and Highway
Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.
2 (See Note General Decision Number: IL080007 04/17/2009 IL7
Superseded General Decision Number: IL20070007
State: Illinois
Construction Types: Building and Residential
Counties: Madison and St Clair Counties in Illinois.
3 Past Performance Package
4 Operational Climatic Data Summary
5 General Requirements
6 Financial Data Form
7 GeoBase Requirments
8 Invoicing Instructions (WAWF)
9 Scott AFB Architectural Compatibility Plan (Jan 2000)
Hard Copy will be made available at Pre-Proposal Conf
Exhibit 1 MACC Seed Project
Revised Price Schedule MACC Seed Project Revised Price Schedule
Note: Attachment 1and 2 can be found on the Department of Labor website at http://www.wdol.gov/dba.aspx http://www.wdol.gov/dba.aspx
FA4407-09-R-0003
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTIONS TO OFFERORS
L-1 Instructions to Offerors
L-1.8 The seed project (initial task order) price proposal plus contract forms (Part I) and past performance information (Part II) shall include the documentation listed below. The price proposal must be based on the offeror's proposal for the seed project as set forth in the task order solicitation documents incorporated herein as Exhibit 1.
The Government will evaluate the proposal in accordance with Section M. Offerors shall submit 2 hard copies
(one originial/one copy) of Part I. Offerors shall submit 2 hard copies (one originial/one copy) of Part II.
PROPOSAL PREPARATION
L-2. PROPOSAL PREPARATION INSTRUCTIONS
L-2.3 Specific Instructions:
PART I – PRICE PROPOSAL/CONTRACT DOCUMENTS
- Submit original and one (1) copy
(c) Complete the necessary fill-ins and certifications in Sections I through K. Section G shall be returned in its entirety. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.
All clauses that require a fill in and that are applicable to the basic contract and or see project must be completed and submitted with your offer.
PART II – PAST PERFORMANCE INFORMATION - Limited to no more than 3 pages per contract listed. Only references for same or similar type contract desired. Submit original plus one (1) copy..
(b) Performance Surveys: The government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Provide a list of no more than three (3), of the most relevant contracts performed for Federal agencies and commercial customers within the last three (3) years . Relevant contracts include a minimum of one design-build construction project and bid-build construction projects with a project magnitude between $500K and $5M each.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .