Preproposal Conference _1Jun 09.pptx

PPTX presentation 299 KB Posted

Attached to
Multiple Award Construction Contract (MACC) - Scott AFB IL
Solicitation number
FA4407-09-R-0003
Issued by

About this file

Pre-Proposal Conference Power Point Slide Presentation

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Questions and Answers_10 Jul 09.docx DOCX document
Section 01010 —
Amendment 0008.pdf PDF
M-4DWV - Sheet 19 of 24.pdf PDF
Q A 8 1 Jul 09.pdf PDF
Amendment007.pdf PDF
M-5HANDCWTR - Sheet 20 of 24.pdf PDF
A-1 Site Plan - Sheet 4 of 24.pdf PDF
08700 HARDWARE —
Amendment 0006_Time Extension.pdf PDF
REVISED 504 EOD S-3 ROOF FRAMING PLAN.dwg DWG drawing
Revised SPECS.pdf PDF
REVISED 504 EOD A-5 SECTIONS.dwg DWG drawing
REVISED 504 EOD A-2 FLOOR PLANS.dwg DWG drawing
REVISED 504 EOD M-2 gas.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD E-1 POWER-LGT-COMM.dwg DWG drawing
REVISED 504 EOD X-1 COVER SHEET.dwg DWG drawing
Amendment 0005_Revised Spec and Dwgs.pdf PDF
REVISED QA-USACE-504 EOD C-1 SITE PLAN.dwg DWG drawing
REVISED 504 EOD S-2 FOUNDATION PLAN.dwg DWG drawing
REVISED 504 EOD M-6Sch.dwg DWG drawing
REVISED 504 EOD C-2 CIVIL DETAILS.dwg DWG drawing
REVISED 504 EOD M-3condunits.dwg DWG drawing
REVISED 504 EOD M-4DWV.dwg DWG drawing
Revised 504 PDF DWGS MINUS MEZZ.pdf PDF
REVISED 504 EOD M-7Sprinkler.dwg DWG drawing
REVISED 504 EOD M-5HandCwtr.dwg DWG drawing
REVISED 504 EOD A-1 SITE.dwg DWG drawing
REVISED 504 EOD A-4 SCHEDULES.dwg DWG drawing
plot.log LOG file
REVISED 504 EOD E-2 GRD-HVAC-FA.dwg DWG drawing
REVISED 504 EOD First Floor Plan XREF.dwg DWG drawing
REVISED 504 EOD M-1ducts.dwg DWG drawing
REVISED 504 EOD S-4 STRUCTURAL DETAILS.dwg DWG drawing
REVISED 504 EOD AID-1 INTERIOR DESIGN.dwg DWG drawing
REVISED 504 EOD A-7 DETAILS.dwg DWG drawing
REVISED 504 EOD A-3 ELEVATIONS.dwg DWG drawing
REVISED 504 EOD S-1STRUCTURAL NOTES.dwg DWG drawing
Revised Bid Schedule.pdf PDF
Amendment 0004_16 Jun 09.pdf PDF
Attachment 3 Past Performance Package.docx DOCX document
QUESTIONS AND ANSWERS_9 Jun 09.pdf PDF
Amendment 0003_Site Visit.pdf PDF
PreProposal Meeting Minutes to Include Q_A.pdf PDF
Pre Proposal Sign In Sheets_1 Jun 09.pdf PDF
QUESTIONS AND ANSWERS_27 May 09.pdf PDF
Amendment 0002_Revised Section L_2.pdf PDF
REVISED 504 EOD A-3 ELEVATIONS.dwg DWG drawing
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

375th CONTRACTING SQUADRON Pre-Proposal Conference Multiple Award Construction Contract (MACC)

Please turn off cell phones

Conference Overview Introductions Multiple Award IDIQ Features MACC Solicitation Features Proposal Submission Requirements Seed Project Description/Expectations Labor Considerations Q & A Rules of Engagement Project Site Visit

Key Personnel “The Acquisition Team”

Contracting Team Mr. Ted Bealer, Cynthia Strout Civil Engineering Team Mr. Jim Gillis, Mr Efrem Rivers Contractors Customers

Multiple Award IDIQ Features IDIQ - Indefinite Delivery/Indefinite Quantity Guaranteed Minimum Anticipate awarding up to 10 contracts Evaluation based on seed project price and past performance Future Task Orders awarded based on criteria identified in the RFP package

MACC Solicitation Features RFP No. FA4407-09-R-0003 Total 5-year program ceiling = $75M Seed Project (Exhibit 1) EOD Addition Statutory Limitation is $1.4M Proposals Due: 4:30 PM, 22 Jun 09 Must be received by 375 CONS

Solicitation Features (cont) Evaluation Process described in Section M is for Seed Evaluation criteria may be tailored for follow-on task orders Performance/Price Trade-off technique evaluated on “approximately equal” basis

Proposal Submission Requirements SF 1442, 2nd pg, blocks 14, 15, 16,18-20A,20B, 20C, 30A, 30B and 30C Section G (Administration Data) , pg 10 Section I (fill in clauses), pg 20 - 41 Section K, pgs 43 – 51

CCR, ORCA

Attachment 6, Financial Data Form

Proposal Submission Requirements (cont.)

Section L-2, Proposal Preparation Part I: SF 1442, Sections G, I, K, Teaming Agreements (if applicable), 8(a) status letter from SBA (if applicable), Attachment 6 Part II: Past Performance Information, Three (3) references-One (1) must be design build project

Proposal Submission Requirements (cont.)

Past Performance Package Attachment 1: Past Performance Info. (3) Attachment 2: Consent Letter Attachment 3: Client Authorization Task Order Proposal (Exhibit 1) Pg 3-4 Name of Individual Authorized to Offer Attch 1 Price Schedule (Offer) Task Order Proposal Guarantee (bid bond) 20%

Seed Project EOD Addition, Bldg 504

Investigate site conditions

Expectation: Deliver turn-key, quality project without change orders!

Labor Considerations Davis Bacon Act applies Prevailing wages in effect at time of award apply to all base year projects Prevailing wages in effect at time options exercised apply to option period projects Employees subject to labor interviews Must have applicable posters at job site

Q&A Rules of Engagement No changes to RFP unless amended Submit questions in writing to Cynthia Strout via e-mail cynthia.strout@scott.af.mil) Cut-off for questions is: 12 June 2009 Questions & Answers will be posted on FedBizOpps website

QUESTIONS?

375th CONTRACTING SQUADRON image1.png image2.jpeg image3.jpeg

File details come from the government source that posted it. Updated .