FINISH HARDWARE

08700-1 REVISED 6-22-09

DIVISION 8 - DOORS AND WINDOWS

SECTION 08700 - FINISH HARDWARE

01. SCOPE:

This section includes everything necessary for and incidental to the furnishing of all Finish

Hardware as shown on the drawings and/or specified herein.

01.1 Standards:

The following standards shall govern all work specified under this section unless specifically modified.

1. American National Standards Institute (ANSI)

2. Door and Hardware Institute (DHI)

3. Steel Door Institute

01.2 Qualifications of Manufacturer:

Products used in the work of this section shall be produced by manufacturers regularly engaged in the manufacturing of similar items and with a history of successful production acceptable to the Contracting Officer’s Representative (COR).

01.3 Qualifications of Installers:

Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for the proper performance of the work in this section.

01.4 Keying Schedule:

Will be developed with building end user and SPO/COR.

02. MATERIALS:

Finish Hardware listed in this section under Finish Hardware Schedule is taken from the following catalogs, or approved equal.

1. Hager

2. Schlage

3. LCN

4. Ives

08700-2 REVISED 6-22-09

All materials used in the manufacturing of the finish hardware shall be the best of respective kind and free from imperfections and flaws. All parts of mechanisms shall be machined and accurately adjusted. Surfaces of all finished parts shall be ground smooth.

Hardware Supplier shall forward to the General Contractor and Hollow Metal Supplier and

Millwork Supplier, the templates required, also hardware locations as recommended by the Door and Hardware Institute and the American National Standards Institute, unless locations are detailed and/or specified otherwise.

All hardware shall be furnished to the General Contractor, marked for the openings shown on the drawings along with any special instructions.

Shop Drawings , schedules, descriptive and/or technical data and samples for all work under this section shall be submitted to the Contracting Officer’s Representative (COR) for approval as specified under Division 1 - General Requirements.

Finish Hardware Schedule

Group 1

Doors: 100, 101B, 101D, 102 Each door shall receive the following:

1-1/2 pair 4 ½” x 4 ½” Hinges w/ Tamperproof pins BB1199 612 1 Schlage Lockset D70PD RHO 612 1 Hager Saddle Threshold - 36” 415S Dark Bronze 1 Hager Door Sweep w/ silicone Insert 779S Dark Bronze 1 Set weather-stripping w/ silicone insert 863S Dark Bronze 1 Norton Door Closer 4040 BHMA695

Group 2

Doors 108 Each door shall receive the following:

3 pair 4 ½” x 4 ½” Hinges BB1199 612 1 Schlage Lockset D70PD RHO 612 1 Hager Saddle Threshold - 72” 415S Dark Bronze 2 Hager Dome Stop 243F 612 1 pair Ives flush bolt FB358 612 1 Norton Door Closer (Active Leaf) 4040 BHMA695

2 Hager Door Sweep w/ silicone Insert (102 Only) 779S Dark Bronze

08700-3 REVISED 6-22-09

1 Set weather-stripping w/ silicone insert (102 Only) 863S Dark Bronze 1 Astragal Weatherstrip / silicone insert (102 Only) 774S Dark Bronze

Group 3

Doors 103, 104

Each door shall receive the following:

1-1/2 pair 4 ½” x 4 ½” Hinges BB1199 612 1 Schlage Lockset D50PD RHO 612 1 Hager Dome Stop 243F 612

Group 4

Doors 105, 106, 107 Each door shall receive the following:

1-1/2 pair 4 ½” x 4 ½” Hinges BB1199 612 1 Schlage Lockset D40S RHO 612

1 Hager Dome Stop 241F 612

Group 5 (DELETED)

Group 6 (DELETED)

Group 7 (DELETED)

Locksets shall be keyed and master-keyed as directed by the Scott Project Office and Users to the existing Best Key System. Key will be cut by BCE Key Shop. Blanks will be provided by Contractor as per end users needs.

03. EXECUTION

See Division 6 - Wood and Plastics, Section 06200 - Finish Carpentry for installation.

Group 5 (DELETED)
Group 6 (DELETED)
Group 7 (DELETED)

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) - Scott AFB IL, newest first.
File Type Posted
Amendment 0009.pdf PDF
Questions and Answers_10 Jul 09.docx DOCX document
Amendment 0008.pdf PDF
M-4DWV - Sheet 19 of 24.pdf PDF
Q A 8 1 Jul 09.pdf PDF
M-5HANDCWTR - Sheet 20 of 24.pdf PDF
A-1 Site Plan - Sheet 4 of 24.pdf PDF
REVISED 504 EOD E-1 POWER-LGT-COMM.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD M-3condunits.dwg DWG drawing
REVISED 504 EOD A-4 SCHEDULES.dwg DWG drawing
REVISED 504 EOD S-3 ROOF FRAMING PLAN.dwg DWG drawing
REVISED 504 EOD X-1 COVER SHEET.dwg DWG drawing
Amendment 0005_Revised Spec and Dwgs.pdf PDF
REVISED 504 EOD C-2 CIVIL DETAILS.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD M-6Sch.dwg DWG drawing
Revised 504 PDF DWGS MINUS MEZZ.pdf PDF
REVISED 504 EOD M-7Sprinkler.dwg DWG drawing
REVISED 504 EOD A-1 SITE.dwg DWG drawing
REVISED 504 EOD M-5HandCwtr.dwg DWG drawing
REVISED 504 EOD M-4DWV.dwg DWG drawing
Revised SPECS.pdf PDF
REVISED 504 EOD M-1ducts.dwg DWG drawing
QUESTIONS AND ANSWERS_9 Jun 09.pdf PDF
Amendment 0003_Site Visit.pdf PDF
PreProposal Meeting Minutes to Include Q_A.pdf PDF
Preproposal Conference _1Jun 09.pptx PPTX presentation
QUESTIONS AND ANSWERS_27 May 09.pdf PDF
Amendment 0002_Revised Section L_2.pdf PDF
REVISED 504 EOD A-2 FLOOR PLANS.dwg DWG drawing
QA-USACE-504 EOD C-1 SITE PLAN v2004 —
REVISED 504 EOD A-5 SECTIONS.dwg DWG drawing
REVISED 504 EOD M-2 gas.dwg DWG drawing
REVISED 504 EOD A-6 DETAILS.dwg DWG drawing
REVISED 504 EOD X-1 COVER SHEET.dwg DWG drawing
REVISED 504 EOD S-4 STRUCTURAL DETAILS.dwg DWG drawing
REVISED 504 EOD AID-1 INTERIOR DESIGN.dwg DWG drawing
REVISED 504 EOD M-4DWV.dwg DWG drawing
REVISED 504 EOD E-1 POWER-LGT-COMM.dwg DWG drawing
REVISED 504 EOD M-7Sprinkler.dwg DWG drawing
REVISED 504 EOD S-3 ROOF FRAMING PLAN.dwg DWG drawing
REVISED 504 EOD S-2 FOUNDATION PLAN.dwg DWG drawing
REVISED 504 EOD A-7 DETAILS.dwg DWG drawing
REVISED 504 EOD A-1 SITE.dwg DWG drawing
REVISED 504 EOD S-1STRUCTURAL NOTES.dwg DWG drawing
REVISED 504 EOD A-4 SCHEDULES.dwg DWG drawing
Specifications _EOD MACC Seed.pdf PDF
Exhibit 1_Seed Project without Specs and Drwgs.pdf PDF
Drawings EOD MACC Seed.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) - Scott AFB IL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .