This document is an Addendum 1 to a federal contract for repairs at Keesler Air Force Base. The project involves repairing dormitory gutters and windows in the base's Triangle area, with the project number MAHG231017. The addendum specifically modifies Section 07 71 23 of the specifications related to aluminum gutters and downspouts, updating the coating requirements from a two-coat system to a Fluorocarbon Coating. The new specification calls for a primer applied at 0.25 mil thickness and a color coat applied at 0.75 mil thickness, totaling 1.0 mil nominal dry film on the topcoat. The color will be Kynar 500, selected from the manufacturer's standard color range, with the final color to be chosen by the Contacting Officer.

View the file

Other files

File Type Posted
Attachment 11 - MAHG231017 - Addendum 2.pdf PDF
Solicitation Amendment FA301025R00270003 SF 30.pdf PDF
Solicitation Amendment - FA301025R00270003.pdf PDF
Solicitation Amendment - FA301025R00270002.pdf PDF
MAHG23-1017 - Additional QandA - 4Sept2025.pdf PDF
Solicitation Amendment FA301025R00270002 SF 30.pdf PDF
Solicitation Amendment - FA301025R00270001.pdf PDF
Attachment 9 - MAHG231017 - Original Joint Sealant Spec Avery Manor (for reference).pdf PDF
Attachment 8 - MAHG231017 - Original Window Spec Avery Manor (for reference).pdf PDF
Solicitation Amendment FA301025R00270001 SF 30.pdf PDF
MAHG231017 - Questions and Answers - 26Aug2025.pdf PDF
Pre-Bid Site Visit 20Aug.pdf PDF
Attachment 3 -MAHG231017 Repair NPS Dorms Gutters and Windows Drawings.pdf PDF
Attachment 7 -Submittal Procedures.pdf PDF
Solicitation - FA301025R0027.pdf PDF
Attachment 5 -MAHG231017 Repair NPS Dorms Gutters and Windows MSS.xlsx XLSX spreadsheet
Attachment 6 -Wage Determination 11April2025.pdf PDF
Attachment 1 -MAHG231017 Repair NPS Dorms Gutters and Windows SOW.pdf PDF
Attachment 2 -MAHG231017 Repair NPS Dorms Gutters and Windows Specs.pdf PDF
Attachment 4 -MAHG231017 Repair NPS Dorms Gutters and Windows As-Builts.pdf PDF
Past Performance Reference List.pdf PDF
Past Performance Questionnaire.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301025R0027

Attachment 10

ADDENDUM 1 Date: Sept.4, 2025

CONTRACT NUMBER:

PROJECT NAME: Repair NPS Dorms Gutters and Windows

LOCATION: Keesler AFB’s Triangle area

PROJECT NUMBER: MAHG231017

WORK ORDER #: NA

This Addendum is hereby part of the Contract Documents. The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other Contract Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Contract Documents are hereby amended in the following particulars:

I. Relating to the specifications:

A. Reference Section 07 71 23 - Aluminum Gutter and Downspouts, 2.2.8 Finish:

Omit - “(Color by Contracting Officer) Two-coat system applied in a continuous baked-on process in a single operation, comprising of an acid-based primer and baked-on high performance linear polyester topcoat on exposed surfaces. Concealed surfaces finished with a polyester gold backer or wash coat”, and Replace with - “Fluorocarbon Coating: Consists of primer, applied at a nominal dry film thickness of .25 mil, and a color coat, applied at a nominal dry film thickness of .75 mil, giving a 1.0 mil. Nominal dry film on topcoat. Paint finish shall be Kynar 500 as selected from manufacturer’s standard color selection. The back side of the material should be .25 mil. Primer and a 0.25 polyester washcoat. (Color by Contracting Officer)”

END OF ADDENDUM 1