This document is an Addendum 1 to a federal solicitation for a runway maintenance project at Keesler Air Force Base in Mississippi. The contract, set aside for Service-Disabled Veteran-Owned Small Businesses, involves removing rubber from and restriping a runway, with a project value between $500,000 and $1,000,000. Key changes in the addendum include modifications to the Statement of Work (SOW) regarding laydown area signage, contractor pass requirements, and identification procedures for non-US citizen personnel.

The addendum updates technical evaluation factors, removing the Barrier Plan requirement and adding new criteria such as proposed labor hours, equipment specifications, and personnel role restrictions. Drawing changes include identifying the laydown yard, specifying a water source via fire hydrant, detailing surface preparation procedures, and adding a new runway section view sheet. A new specification (ETL 04-2 Chg 2) will take precedence over previous guidelines, and contractors must submit detailed information about labor classifications, equipment types, and key personnel to be considered for the contract.

View the file

Other files

File Type Posted
Solicitation Amendment FA301025R00160002 SF 30.pdf PDF
MAHG241077 Remove Rubber and Restripe Runway - Additional Questions and Answers.pdf PDF
Solicitation - FA301025R0016.pdf PDF
Attachment 10 - MAHG241077 Rem Rubber Restripe Runway - Spec ETL 04-2 Chg 2.pdf PDF
Solicitation Amendment FA301025R00160001 SF 30.pdf PDF
Attachment 2 - MAHG241077 Remove Rubber and Restripe Runway - Revised Drawings.pdf PDF
81 SFS Access Process MFR for Contractors.pdf PDF
MAHG241077 Remove Rubber and Restripe Runway - Questions and Answers.pdf PDF
Attachment 1 - MAHG241077 Remove Rubber and Restripe Runway - Revised SOW.pdf PDF
FA301025R0016 - Site Visit Sign In Sheet - 20250626.pdf PDF
Attachment 3 - MAHG241077 Remove Rubber and Restripe Runway - Specs.pdf PDF
Attachment 2 - MAHG241077 Remove Rubber and Restripe Runway - Drawings.pdf PDF
Attachment 7 - MAHG241077 Remove Rubber and Restripe Runway - PPQ.pdf PDF
Solicitation - FA301025R0016.pdf PDF
Attachment 4 - MAHG241077 Remove Rubber and Restripe Runway - MSS.xlsx XLSX spreadsheet
Attachment 6 - MAHG241077 Remove Rubber and Restripe Runway - PPRL.pdf PDF
Attachment 5 - MAHG241077 Remove Rubber and Restripe Runway - Wage Determination.pdf PDF
Attachment 1 - MAHG241077 Remove Rubber and Restripe Runway - SOW.pdf PDF
Attachment 8 - MAHG241077 Remove Rubber and Restripe Runway - Submittal Procedures.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 9

FA301025R0016

ADDENDUM 1 Date: July 2, 2025

PROJECT NAME: Remove Rubber and Restripe Runway

LOCATION: - Keesler AFB, Mississippi

NUMBER: MAHG241077

WORK ORDER#: 13337463

This Amendment is hereby part of the Contract Documents. The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other Contract Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Contract Documents are hereby amended in the following particulars:

This addendum is in reference to questions submitted after the Pre-Bid Sit Visit held on 25 June 2025.

Changes to the SOW:

Section 3.2.4. Base Bid Scope:

3.2.4.B. Contractor is responsible for supplying any signs and/or barriers necessary to denote the limits of the laydown area during active performance. Signs and barriers will not be necessary on the runway/taxiways. All signs and barriers around the laydown area will need to be removed during any inactive periods of performance.

Section 3.12 Passes:

3.12.1 Contractor Notification Responsibilities: The Contractor shall provide a written notification to the CO. The notification shall include the names and contact information (phone number, and email) of a minimum of two Contractor Representatives (preferably the Contracting Agent and the Project Supervisor) that will be responsible for this project and have 24-hour contact availability to answer any questions or address any issues that may arise related to this project.

3.12.2 Passes for Contractor employees may be requested through the 81st Civil Engineer Squadron. Pass requests shall be submitted in accordance with the procedures included in DAFFARS clause – 5352.242-9000.

3.12.3 Upon contract award, Superintendents will complete a Keesler AFB (KAFB) Form 299, Application for KAFB Identification Card. After issuance of a DBIDS identification card, the Superintendent will submit a KAFB Form 298, Appointment/Termination Record – Signature Card which will grant the Superintendent the role of a Pass and ID Alternate Issuing Official. This role will enable the designated superintendent to function as a sponsor and request passes for all contractor and sub-contractor personnel performing work on the installation cited in the contract. Contractor personnel who are non-US citizens are required to be escorted by a Superintendent with escort privileges.

Non-US Citizen contractor personnel must be escorted at all times while on the installation and when entering and exiting the installation. Superintendents may only escort up to six non-US citizen contractor personnel at a time.

3.12.4 Paperwork required for passes:

- For vehicle operators:

1. Current driver license for each employee in support of work on Keesler

AFB.

2. Vehicle Registration and Proof of Insurance.

- For non-vehicle operators: Current driver license, official ID or passport.

Changes to the Drawings:

Sheet C-101:

Laydown Yard has been identified in the drawing sheet C-101.

Sheet C-102:

Civil Keynote 2: Water source is being provided by the government via fire hydrant located on the west side of the bldg. 4247 at the backline. Back flow preventer will be needed.

Sheet C-103:

Civil Keynote 2: Surface preparations includes what is described in Level 1 plus other procedures necessary to create a sound surface for repainting including basic patching/filling and high-pressure water blasting. 10% assumption of area for bidding purposes.

Sheet C-104:

Line weights were changed to better delineate the work being completed in the Bib Option 1.

NEW SHEET C-504: Typ. Runway Section View This section was added in regarding the “basic/patching filling” to provide a detail of the existing composition of the runway.

Changes to the Specs:

NEW SPEC: ETL 04-2 Chg 2: This specification will take precedence over the UFC due to the waivers of the current runway.

Changes to the Solicitation Technical Factors in Section L and M:

Barrier Plan was removed.

Factor 1 - Construction Approach: ADD: Include proposed labor hours and classification/skill sets that adequately address the Statement of Work, drawings and specifications.

Factor 7 – Complete list of the types of heavy equipment: ADD: No handheld or single driver equipment will be acceptable.

Factor 8 – Identify key personnel and subcontractors: ADD: However, the Superintendent is not permitted to hold the same title as the Quality Control Manager (CQM).

(See Section L and M of the solicitation for the complete list of technical factors that will be used to conduct technical evaluations on contractor technical proposals.)

END OF ADDENDUM 1