This document is an attachment (Attachment 4) for a Department of the Air Force contract to remove rubber and restripe a runway, with the project number MAHG24-1077 and solicitation number FA301025R0016. The contract is a Service-Disabled Veteran-Owned Small Business set-aside with an estimated project value between $500,000 and $1,000,000.
The attachment details specific submittal requirements for the project, including multiple mandatory documents such as HAZMAT questionnaires, HAZMAT and HAZWASTE reporting forms, manufacturer's and contractor's warranties, pavement paint specifications, reflective media details, warning stencil documentation, and an operations and maintenance (O&M) manual. Most submittals are required either 5 days prior to specific project phases or at the end of the contract. A mandatory site visit is scheduled for 25 June 2025 at 2:00pm CDT, with specific access requirements including valid identification, vehicle registration, and proof of insurance. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation at any time.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSS
| Project Number: MAHG24-1077 | |||
| Project Title: | |||
| Remove Rubber and Restripe Runway | Solicitation / Contract Number: |
FA301025R0016 - Attachment #4
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 | HAZMAT Questionnaire | 3 | 3 | 5 DAYS PRIOR | |||||||
| 2 | HAZMAT MSDS | 3 | 5 DAYS PRIOR | ||||||||
| 3 | HAZMAT Reporting Entry Form | 3 | 3 | 5 DAYS PRIOR | |||||||
| 4 | HAZMAT Reporting Entry Form | 3 | 3 | END OF CONTRACT | |||||||
| 5 | HAZWASTE Reporting Entry Form | 3 | 3 | 5 DAYS PRIOR | |||||||
| 6 | HAZWASTE Reporting Entry Form | 3 | 3 | END OF CONTRACT | |||||||
| 7 | Warranty (Manufacturer's) | 3 | END OF CONTRACT | ||||||||
| 8 | 1-Year Warranty (Contractor's) | 3 | END OF CONTRACT | ||||||||
| 9 | Pavement Paint (including Material Safety Data Sheets and Product Descriptons) | 3 | 3 | 3 | 3 | 3 | 5 DAYS PRIOR TO PLACEMENT | ||||
| 10 | Reflective Media (Glass Beads) | 3 | 3 | 3 | 3 | 5 DAYS PRIOR TO PLACEMENT | |||||
| 11 | Warning Stencil | 2 | 2 | 15 DAYS PRIOR TO APPLICATION | |||||||
| 12 | O&M Manual | 3 | 3 | END OF CONTRACT | 2 Hardcopies ; 2 Electronic Copies |