Vehicle Replacement Question and Answer

View the file

Other files

File Type Posted
FA3002-13-R-0012_Conformed_Solicitation_Document.docx DOCX document
FA3002-13-R-0012-0008.docx DOCX document
Maxwell_BOS_PWS_-_Amend_8.pdf PDF
Maxwell_Memorandum_Amendment_0007_CBA_Addendum.docx DOCX document
Memorandum_of_Agreement_002.tif TIF image
Maxwell_Memorandum_Amendment_0007_(2).docx DOCX document
FA3002-13-R-0012-0007-Conformed_Copy.docx DOCX document
SCA_WD_2005-2011_(Rev_20).pdf PDF
FA3002-13-R-0012-0007.docx DOCX document
Maxwell_Memorandum_Amendment_0007.docx DOCX document
MFR_correcting_due_date_in_Amend_0007.docx DOCX document
CBA_M1_and_USW_Maxwell_AFB_April_14_2016_through_June_30_2018.pdf PDF
9504_CBA_Maxwell.pdf PDF
Amendment_0007_Conform_Copy.doc DOC document
Amendment_0007_Modification_Document.doc DOC document
13350_CBA_Maxwell.pdf PDF
Maxwell_BOS_PWS_Changes_Amendment_7.pdf PDF
Amendment_0006.pdf PDF
Vehicle_Replacement_Schedule_-_Maxwell_AFB_BOS.pdf PDF
MFR-_Amendment_0006.pdf PDF
MFR-_PWS_Appendix_25FF.1.3..docx DOCX document
Maxwell_BOS_PWS_Revised_Amend_5_(17_Sep_15).pdf PDF
MFR-_Revised_PWS_Amend_0005.docx DOCX document
Attch_4_PAST_PERFORMANCE_INFORMATION.pdf PDF
Attachment_5_-_PPI_Tool_Instructions.pdf PDF
Maxwell_BOS_RFP_Amendment_0005.pdf PDF
Maxwell_BOS_RFP_(Conformed_Copy).pdf PDF
Maxwell_BOS_PWS_11_Sep_2015.pdf PDF
Maxwell_Manpower_Matrix_Atch_9_14_Sep_2015.xlsx XLSX spreadsheet
SCA_WD_2005-2011_Rev_19.pdf PDF
Maxwell_Memorandum_Amendment_0004.docx DOCX document
Maxwell_BOS_PWS_26_Aug_2015.pdf PDF
Maxwell_RFP_Amendment_4_Q A.xls XLS spreadsheet
Maxwell_BOS_Amend_0004_Modification_Document_RFP.doc DOC document
Signed_Q A_MFR_-_20_Aug_15.pdf PDF
MFR _Max_Bos _Amendment_0003.pdf PDF
Maxwell_BOS_PWS_5_Aug_15_-_Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
MAX_Additional_Operations_Workload_7_Jul_2015.pdf PDF
Signed_DD254.pdf PDF
RFP_QAs_Consolidated_Final.xlsx XLSX spreadsheet
Maxwell-Gunter_Contractor_Workforce_Demographics_.pdf PDF
AFSFMS_Users_Guide_-_June_2008_RevisedMB(13_Nov_08).pdf PDF
Real_Property_Report _7115_(22_June_2015)-Amendment_0003.pdf PDF
SCA_WD_2005-2011_Rev_18-Amendment_0003.pdf PDF
Maxwell_Manpower_Matrix_13_Jul_2015.xlsx XLSX spreadsheet
DBA_WD_(All_Combined)-_Amendment_0003.pdf PDF
Proposal_Due_Date_Extention_Notice.docx DOCX document
FA3002-13-R-0012_-_Maxwell_RFP_Amend_0002.pdf PDF
Proposal_Due_Date_Extension.pdf PDF
Show 40 more

Latest 50 of 110 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMENT/QUESTION FORM

Maxwell-Gunter AFB Base Operations Support Contract Re-competition

COMMENT/QUESTION:

All of the Vehicles in 25FF.1.3 are identified as being ASC-051. Pursuant to paragraph

12.1.3.2 of AFI24-301, it is our understanding that “Authorizations under this allowance will be reduced/deleted upon turn in of the asset to DRMO”. It appears that when a replacement vehicle is put into service and the replaced asset is turned into DRMO, regulations require that the allowance for that asset be reduced or eliminated. Because of this reduced allowance, the replacement piece of equipment will by necessity become contractor property. Is this a correct interpretation of the regulations?

ANSWER:

IAW AFI 24-302, Vehicle Management, Table 4.2, vehicle ASC-051 is used to designate AF vehicles that are approved GFP to a contractor and will not be replaced by the AF. Vehicle authorizations under this allowance will be reduced/deleted upon final disposition of the vehicle; and it would be the contractor’s responsibility to acquire replacements (purchase, lease or rental), if a contractor determines a vehicle is still needed to fulfill contract obligations. The contractor is solely responsible for all procurement and sustainment cost associated with contractor acquired vehicles. Any vehicles purchased and/or provided by the contractor for use under the contract are owned by and will be disposed of, by the contractor. The AF Vehicle Management function (441 VSCOS) will not to accept title of CAP vehicles without prior 441 VSCOS approval. Additionally, AF contracting activities are not authorized to purchase vehicles without 441 VSCOS and Air Force Life Cycle Management Center (Warner Robins) approval. To answer the questions directly: If a contractor replaces ASC051 vehicle assets, the new vehicles are property of the contractor.

NOTE: Comments/Questions not submitted on this form will not be addressed. Request only one question per form. State question as clearly as possible, giving as much information as needed. If an answer will give a follow-on question, try to anticipate that so the entire subject can be addressed at the same time.