RFP_QAs_Consolidated_Final.xlsx
XLSX spreadsheet 84 KB Posted
- Attached to
- Maxwell-Gunter BOS Federal contract opportunity
- Solicitation number
- FA300213R0012
About this file
Responses to Questions
View the file
Other files for this federal contract opportunity
Show all 50
Maxwell-Gunter BOS has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| C-00-001 | RFP, Pg 291, Section J | Section J references Attachment 12 – Davis Bacon WD. However, Davis Bacon WD is not provided. Request the Government to clarify if Davis Bacon is applicable for this solicitation. | Most Current DBA WD has been incorporated into the Solicitation and added as an attachement to the amendment. |
| C-00-002 | RFP, Pg 309, L.3.1.4 | The latest Wage Determination for Montgomery County, AL listed on the DOL website is WD 2005-2011, Revision 18 dated 12/22/2014. WD provided in the solicitation is WD 05-2011, Revision 17, dated 07/25/14. Request the Government to incorporate the latest WD for Montgomery County, AL | The SCA Wage Determination has been updated and provided as an attachment to this amendment. |
| C-00-003 | RFP, Page 311, Para L.3.3.2 | Extended delays surrounding the final RFP pastime tends to adversely affect a small business to a larger degree than that of a large business. When establishing relationships with a large business prime, certain past performances are key to a solid record of past performance and play a large part in a successful outcome for a small business component of any large business subcontracting plan. A three year window reduces the opportunities for a small business to compete if that small business is not an incumbent or a member of team that provides these duties currently. Extending the window to five years for past performance vs a three window levels the playing field for all competitors. Recommend the past performance window be extended to five years. | Past performance will remain at "within the last three years". If an offeror is unable to provide Past Performance as required in the RFP, then they will be considered unknown, which is considered acceptable. |
| C-00-004 | RFP, Pg 309, Para L.3.1.5.3 | Collective Bargaining Agreements provided by the customer reference wage and fringe benefit escalation that ends on 1 Nov 2014. The winning offeror will execute with a 15 May 2016 contract start, but 1 Nov 2014 escalation doesn’t logically cover the base period (a 1 Nov 2015 escalation would). It is not clear if we should use 1 Nov 2014 wages for pricing/fringe or if we should apply escalation (not currently stated) for 1 Nov 2015 that would apply during base year. Please let us know if we should use 1 Nov 14 wages and fringe. | CBA 9504 expires on 30 June 15, and CBA 13350 expires on 31 July 15. The new CBAs will be incorporated into the solicitation and offerors will be allowed to adjust their pricing volume accordingly as the new CBAs are released. |
| C-00-005 | RFP, Pg 291, Section J | Section J LIST OF ATTACHMENTS states “Attachment 15 Mission Essential Contractor Services”, but Attachment 15 was not provided with the solicitation. Will the Government be issuing an Attachment 15? | A memo has been released on FBO discussing Mission Essential Contractor Services. This attachement was issued on 5 May 15. |
| C-00-006 | RFP, Pg 303, Para L.1.4 | Section L.1.4 states that Attachment 11 Question and Comment Sheets are due by 21 May 15, while the Memorandum for Pre-Bid/Pre-Proposal Conference states questions are to be submitted not later than 19 May 15. Will the Government please clarify if questions are due by 19 May or 21 May? | This was addressed and questions were due on 21 May 15. This was a change issued in Amendment 0001 to the RFP Issued on 5 May 15. |
| C-00-007 | RFP, Section L | Section L does not address how the Contracting Officer wishes to received Subcontractor Pricing information. Would the Contracting Officer prefer sealed or unsealed pricing information from major subcontractors? | As this is an LPTA, FFP requirement, the contracting office will not evaluate subcontractor pricing. The pricing that will be evaluated is the pricing of the Prime contractor, which should be inclusive of all work to be performed. |
| C-00-008 | RFP Pg 311, Section L, Para 3.3.1 and 3.3.2 | Referenced paragraphs for solicitation FA3002-13-R-0012 states that six (6) Past Performance contracts submitted for Recency and Relevancy must have occurred with the three (3) years immediately preceding the solicitation release date (30 Apr 15). Since the release of the Maxwell-Gunter RFI (July 2012) and draft material (Mar 2013), prime Offerors have established teammates and subcontractors specifically for Maxwell-Gunter based on the Governments release of information in 2013 and 2014. Now that the FRFP has been released (30 Apr 15), after a two (2) year delay (solicitation number reflects 2013), still with a three (3) year window on Past Performance references, a number of Past Performance references for an Offeror, teammates, and/or subcontractors are no longer valid, which now makes it difficult for achieving “Recency” and “Relevancy” within the last three years. |
As a result of the delay in the issuance of the FRFP, to be fair to industry, and to ensure the interest of the Government is best served, would the Government expand the Recency period beyond three (3) years, and/or increase the number of Past Performance reference submittals beyond six (6)?
| See Answer to C-00-003 | ||
| C-00-009 | RFP Pg 291, Section J, Manpower Matrix | Referenced Maxwell_Attach_4_Section J_ManpowerMatrix13_Nov_2014_ for solicitation FA3002-13-R-0012 was provided as a PDF document. |
Is it permissible for the Offeror’s to convert this PDF to a usable Excel, will the Government accept this changed document submitted by an Offeror, or will the Government issue an Excel version via an Amendment?
| The Government posted the Manpower Matix to FedBizOps when it issued Amendment 001. The government has provided an excel file with the Manpower Matrix for offerors to utilized during this soliciation as a part of this amendement. | |||
| C-00-010 | RFP Pg 291, Section J | Text, documents, and references within the solicitation do not align with the Section J List of Attachments either by Attachment number or title. | Section J and the attachments listed in the RFP have been corrected and provided in this amendment. |
| C-00-011 | RFP, Pg 307, Para L.2.5.1 | Will the government clarify if figure/table titles and action captions have to be at 1 ½ space or are they considered as part of the figure and/or table? | When associated with a figure and/or a table, the title or captions will be considered part of the figure or table. |
| C-00-012 | RFP, Pg 307, L.2.5.3 | Will the government consider excluding the roles and responsibilities from page count and letting it be added at the end of the volume as an appendix? | No, the page count will remain the same as stated in Section L.2.5.3 |
| C-00-013 | Article 32 – Page 33 CBA 9504, Article 26 – Page 26 CBA 13350, CBA | Will the government consider providing a plug number for the severance costs required within the CBA in order to ensure cost realism? If a plug number is not provided will the government clarify where those costs should be allocated within the price volume? | No, the government will not provide a plug number. As this is an LPTA, FFP requirement, it is up to the offeror to decide how it will allocate money for severence. |
| C-00-014 | None | The DoD Daily Digest Bulletin released the below extension to Vectrus through 14 Nov 2016, which differs from the solicitation period of performance start date of 01 Apr 2016 (45 days Mobilization + 10.5 Months) and 12 month option periods. To ensure that the Government receives accurate price information from Offeror’s will the Government be issuing an amendment with a revised period of performance of 15 Nov 2016 – 14 Nov 2017 (45 days Mobilization + 10.5 Months) and 12 month option periods? |
| Vectrus Systems Corp., Maxwell Air Force Base, Alabama, has been awarded a $62,221,604 firm-fixed-price incentive bridge contract for base operating support services. The contract includes, but is not limited to maintenance including foreign object damage and dropped object, resource management, communications/information technology, publishing management, civil engineering including asset management, operations and maintenance. Work will be performed at Maxwell Air Force Base, Alabama, and is expected to be complete by Nov. 14, 2016. This award is the result of a sole-source acquisition. Fiscal 2015 operations and maintenance funds in the amount of $41,628,443 are being obligated at the time of award. The 338th Specialized Contracting Squadron, Joint Base San Antonio-Randolph, Texas, is the contracting activity (FA3002-15-C-0008). | The cited publication is not a part of this RFP and should not be considered during proposal preparation. The Period of Performance all offerors should utilize is what is listed in Section F of this solicitation. | ||
| C-00-015 | RFP Pages 303 and 316, RFP Section L.2.1, RFP Section L Para L.3.5 and subordinate paras | COMMENT: For Volume V, the Table at RFP Section L.2.1 has two requirements that are not in the submittal instructions at RFP Section L, para L.3.5. |
Some of the data missing in para L.3.5 is actually included in another section of the proposal. Specifically, Organization (requested in the Table at L.2.1) is presented in Volume II, Section 4.1, Organizational Structure. We presume that the Table at RFP Section l.2.1 will be revised to delete the redundant line item 1.5 Organization, and that the two follow on line items will be renumbered to 1.5 and 1.6.
The other RFP Section L.2.1 line item missing in RFP Section L, para L.3.5 is Teaming Arrangements and/or Letters of Intent. We presume submittal instructions will be provided in RFP Section L, para L.3.5 for these teaming agreement documents requested by Section L.2.1, page 303.
Your presumptions regarding the table at L.2.1.1 are correct, the Organization row located in the Volume V section has been deleted and the items that followed have been renumbered.
In addition, the paragraph at L.3.5.1.4 and its subsequent paragraphs have been shifted down and renumbered. The new paragraph located at L.3.5.1.4 now gives instructions to offerors regarding Teaming Arrangements and/or Letters of intent.
| C-00-016 | RFP Section L.3.2.4.2. and Executive Summary | RFP Section L.3.2.4.2.states: " Provide a completed Manpower Matrix (ref: RFP, Section J, Attachment 10) for the base period and each option period." The Executive Summary lists the Matrix as Attachment 9. A Manpower Matrix was actually provided as Attachment 4. Please clarify that the Attachment 4 matrix is meant to be used in response to the Section L.3.2.4.2 requirement. | Section J has been corrected as well as the references made to each attachment in the RFP, please use the Section J as amended. The Manpower Matrix is Attachment 9 |
| C-00-017 | RFP Section L.3.2.4.6 | RFP Section L.3.2.4.6.states: "Provide a complete Work Breakdown Structure (WBS) (located in the Technical Library)." In reviewing the technical library, we were not able to locate the WBS. Can the Government please provide? | See Answer to C-00-009 |
| C-00-018 | RFP, Small business goals | Will the Government make the small business goal 36% of total dollars instead of 28% of subcontracted dollars? A goal of 36% of subcontracted dollars encourages large businesses to self-perform as much work as possible thus hurting small businesses. | No, the Government must adhere to the goals set by the Small Business Administration |
| M-00-001 | SCA Wage Determination | Will the Government please indicate if Revision 18 of wage determination (05-2011) can be used instead of Revision 17 of wage determination (05-2011) that was provided with the RFP? | The Government will issue Revision 18 of the Wage Determination (05-2011) for use on this effort for proposal preparation. |
| M-00-002 | RFP, Pg 306, L.2.4 | Will the Government be issuing a new Section J, solicitation, and documents where references align by attachment number and title? | See answer to C-00-010 |
| M-00-003 | RFP, Pg 307, L.2.5.5 | With an image area of 9 x 15 ½ inches for the 11x17s, the left and right margins will be less than 1”. Please clarify if ¾” margins are acceptable for 11x17s. | When printing on 11x17 paper, the left and right margins are permitted to be 3/4". |
| M-00-004 | RFP, Pg 307, L.2.5.1 | Per the RFP we need to use 1.5 spacing. Is thie just for body text? Do we need to use this spacing for tables and graphics? Also can we use a font less than 10 for graphics? | As stated in the RFP, all spacing should be 1.5 and that includes blocks of text within tables. 10 point font is the minimum font size allowable as this ensures fairness among all offerors. |
| M-00-005 | RFP Pg 305, Table L.2.1.1, Volume III, Section 1.1; L.3.3.2.1, L.3.3.2.2 | COMMENT: RFP Table L.2.1.1 for Volume III does not provide the page limit, or indicate a page-limit exclusion, for the requirements stated in L.3.3.2.1 and L.3.3.2.2. |
QUESTION: Will the Government please indicate that responses to L.3.3.2.1 and L.3.3.2.2 are excluded from the page count shown in Table L.2.1.1, or update Table L.2.1.1 with the page limit?
| This section will not be counted against any page limit. | ||
| M-00-006 | RFP, Pg 305, Past Performance Information (Attachment 5) and Instructions to Offerors Past Performance Information (PPI) for Offerors (Attachment 6), and Table L.2.1.1, Volume III Past Performance Information | COMMENT: The referenced page (Table L.2.1.1) allocates 7 pages for each project. Past Performance Information (Attachment 5) and Instructions to Offerors Past Performance Information (PPI) for Offerors (Attachment 6) have separate but overlapping requirements. |
QUESTION: Does the Table L.2.1.1 7-page requirement apply to the Past Performance Information (Attachment 5) or the Instructions to Offerors Past Performance Information (PPI) for Offerors (Attachment 6)?
We respectfully request that you delete the requirement for either Attachment 5 or Attachment 6. Or, if you do require both sets of information, please exclude the PPI Tool pages from the page limitation for Volume III.
| The PPI is not included in the page count. | ||
| M-00-007 | RFP, PWS Section 11 – Multiple sub-sections | The large proposal organization table in RFP Section L.2.1 lists two items to be included in Volume V – “organization” and “teaming arrangements”. But RFP Section L.3.5 makes no mention of those requirements in the detailed volume instructions |
Will the Government please clarify exactly what they require to be submitted in response to the requirement in L.2.1?
| See answer to C-00-015 | ||
| T-00-001 | RFP, Pg 33, Section B, CLIN X069 | We notice that CLIN x069 states that all CEMAS is to be outside the Total Evaluated Price. Since CEMAS is basically the Material Acquisition System for the whole base, is the intent of the Government to have the Maxwell-Gunter BOS Services contract just a labor contract? Will Air Filters, Safety shoes, Office Supplies, Chlorine, Cleaning Supplies (for Custodial), and cable for PWS 7 – and all the other work - all be provided by the Government or procured under CLIN x069? |
| Routine and Planned vs. Limit of Liability on Urgent/Emergency work. | CLIN XX69 is designed to cover the cost of materials to perform the work to meet the requirements in PWS Section 11.1.2.2. | ||
| T-00-002 | PWS, Pg 728, Para 11.1.2.2.2.7 | 11.1.2.2.2.7. ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)/CONTROLS: |
Maintain, monitor (manned 24 hours a day 7 days a week including weekends and holidays), install, remove, operate, calibrate, and repair EMCS/controls systems and associated components.
| Does monitoring require physical on site manning, or can off shift hours calls be routed to an offsite call center? | The intent is for the contractor to provide on-site monitoring, manned 24 hours a day, days a week including weekends and holidays, not the use of an offsite call center. | ||
| T-00-003 | PWS, Pg 972-973, Para 23.2 | PWS 23 Supply Service Summary table in SECTION 23-2 includes PWS Para. References that do not coincide with the PWS provided. |
| For example line 1 of the table 23.2.1 Accurate inventory references PWS paragraphs 23.1.2.1.1., 23.1.2.1.7., 23.1.2.3.3. and 23.1.2.3.8. but paragraphs 23.1.2.1.7., 23.1.2.3.3. and 23.1.2.3.8. do not exist. This issue continues throughout the table and the 23.2.2 SERVICE SUMMARY – MUNTIONS table below that. Please advise which are the correct PWS paragraph references for better understanding of the desired Performance Outcome and Performance Standard. | An updated/Correct Service Summary is attached with correct reference paragraphs. Line 1: 23.1.2.1 & 23.1.2.1.1; Line 2: 23.1.2.1, 23.1.2.1.2 & 23.1.2.1.1.4.2; Line 3: 23.1.2.1 & 23.1.2.1.1.1.; Line 4: 23.1.2.1; Line 5: 23.1.2.1; Line 6: 23.1.2.1.1; Line 7: 23.1.2.1.1.4; Line 8: 23.1.2.1.1.4.2; Line 9: 23.1.2.1.2.1; Line 10: 23.1.2.2.1 & 23.1.2.2.4; Line 11: 23.1.2.2.1 & 23.1.2.2.3; Line 12: 23.1.2.2.1, 23.1.2.2.4 & 23.1.2.2.5; Line 13: 23.1.2.2.2.1 & 23.1.2.2.6; Line 14: 23.1.2.2.5. | ||
| T-00-004 | PWS, Para 11.1.2.2 | Is there a dollar threshold (for labor and materials) for which Priority 1 or Priority 3A work becomes appropriate to be considered a project and therefore, should not be a part of the FFP? |
As examples, if a gas line ruptures – causing work to be characterized as CM Priority 1 requiring a subcontract for a sleeve or pumpkin to repair the gas line, at what cost should the contractor expect the Government to fund the work as a project instead of as part of work expected under the fixed price?
If lightening hits a lift station and fries a control board – causing work to be characterized as CM Priority 1, requiring a very expensive board to be replaced, at what cost should the contractor expect the Government to fund the work as a project instead of as part of work expected under the fixed price? What about the rental of a vacuum truck during the time awaiting repair?
If a compressor motor just out of warranty breaks – causing work to be characterized as CM Priority 3A, requiring the motor to be replaced, at what cost should the contractor expect the Government to fund the work as a project instead of as part of work expected under the fixed price? What about the rental of a portable chiller during the time awaiting repair?
| Yes, there is a $100K threshold where work priority 1, 2, and 3 corrective maintenance would be handled as a project event. See paragraph 11.1.2.2.4.1.4 Work Order Planning. The Government will review, approve/disapprove, and make a final determination on which work requests are to be performed by in-house capabilities for planned work and which will be accomplished as engineering projects. The service provider shall be responsible for work less than $100K (includes planning, programming, designing, contracting action, and funding and executing and management). The service provider shall determine the best method to execute. Ensure planned work meets required prioritized category, estimated start and completion timelines, and within estimated costs. | |||
| T-00-005 | PWS, Pg 3-B-3, Para 3B.1.2 | Is there a water source available for Service Provider use at or near each of the Static Aircraft Displays, or must the SP bring water to the site for the 2X annual washing? If near, what kind of distance are we dealing with? | A water source is available near each Static Aircraft,(25 to 75 feet). |
| T-00-006 | PWS, Pg 3-B-3 and 3-B-4, Para 3B.1.2 | Please clarify the SP’s role regarding radiation surveys on the SDAs. Is the SP responsible for arranging the test as required, or just notifying BEE as stated in the PWS? If the arrangement responsibility rests with the SP, please provide the name of the company currently performing the test. | Just notify the BEE as stated in 3B.1.2. "Ensure complete radiation surveys on each aircraft are performed every 3 years for aircraft that contain radioactive items, inform the Base Environmental Engineer." |
| T-00-007 | PWS, Pg 3-1-7, Para 3.1.3.1b | This paragraph states that the Service Provider will “manage and administer the FOD and DOP programs”. Please expand on what is expected of the SP based on that requirement. | The government expects the service provider manage and administer the FOD and DOP programs with applicable paragraphs IAW AFI 21-101. |
| T-00-008 | PWS, Pg 3-1-7, Para 3.1.3.2.1.2 | This paragraph states that the Service Provider will develop and publish supplemental FOD/DOP program guidance, however, AFI21-101_AETCSUP_MAXWELLAFBSUP_I 10 APRIL 2012, paragraph 1.9.3 states that “Contractor regulations (CRs) are developed by the contractor to implement requirements of the contract and they apply solely to the contractor.” What material/information is the SP expected to develop and publish? | The SP is required to develop organic original supplemental guidance that comports with existing governing publications. |
| T-00-009 | PWS, Pg 3-B-4, Para 3B.1.3.1 | The first sentence of the paragraph states that the quarterly FOD meetings are chaired by the Vice Wing Commander. Please explain the meaning of the 2nd sentence of the paragraph which states: “ The FOD Monitor is responsible for the FOD meeting”. | FOD Monitor responsibilities are stated in the PWS and AFI 21-101. It is the FOD Monitor's responsibility to organize and facilitate the meeting) |
| T-00-010 | PWS, Pg 25-B-4, Para 25B.1.2 | Are the vehicles shown as assigned to TA (MB-4 Aircraft Tow, ½ Ton Pickup Truck, PSI Bobtail and Tug) included in 25FF.1.2 Government Owned Service Provider Operated Vehicles? If so, please provide the associated Registration Numbers. | The 1/2 ton pickup truck is contractor furnished. Registration numbers are as follows; MB-4 (89L00466), PSI Bobtail (90C01153), Tug (97E00218). Be advised that these may not be the same vehicles at contract start. |
| T-00-011 | PWS, Pg 3-B-1, Para 3B1.1 (Transient Maintenance) | Each of these sections either specifies or makes references to After Hours Support. As this is a LPTA opportunity, we respectfully request that the government provide annual historical hours used for After Hours Support in Transient Maintenance, Airfield Management and Weather so offerors can incorporate this workload into the FFP pricing; or provide a separate CLIN that can be used for reimbursement. | The after hours support is almost always for the 908th AW for flying time outside of normal operating hours. In recent years the Airfield, Weather, and Transient Alert functions have shifted their daily schedules an hour early or late to accommodate the requests when they occur. Therefore, there has been almost zero overtime required to support. However, Weather has an additional requirement to support the HUB (26th OWS) when they require Maxwell's instruments for severe weather forecasting. The hours required has been between 40 and 60 hours per year. |
| T-00-012 | PWS, Pg 3-1-2, Para 3.1.1.2.2.13 | We do not see any Aerospace Ground Equipment (AGE) as part of the Government Owned Contractor Operated vehicles or Government Furnished Equipment. Where does the necessary equipment come from? | AGE is listed in Appendix 2FB |
| T-00-013 | PWS, Pg 21-1-2, Pg 21.1.2.2.2 | What is the historical workload for After Hours support? | The after hours support is almost always for the 908th AW for flying time outside of normal operating hours. In recent years the Airfield, Weather, and Transient Alert functions have shifted their daily schedules an hour early or late to accommodate the requests when they occur. Therefore, there has been almost zero overtime required to support. However, Weather has an additional requirement to support the HUB (26th OWS) when they require Maxwell's instruments for severe weather forecasting. The hours required has been between 40 and 60 hours per year.. |
| T-00-014 | PWS, Pg 21-1-4, Para 21.1.2.3.5 | This paragraph states the “AMOM shall comply with the duties and responsibilities listed in AFI 13-204 Volume 3 and the PWS”. Is the AMOM a “stand alone” and dedicated position or may the AAFM or AMOC personnel perform the duties of the AMOM position? | AMOM is not a "stand alone" position". |
| T-00-015 | PWS, Pg 21-1-4, Para 21.1.2.3.6 | This paragraph states the “AMTM shall comply with the training program requirements, duties, and responsibilities listed in AFI 13-204 Volume 3 and the PWS”. Is the AMTM a “stand alone” and dedicated position or may the AAFM or AMOC personnel perform the duties of the AMTM position? | AMTM is not a "stand alone" position". |
| T-00-016 | PWS, Pg 21-1-5, Para 21.1.2.6 | We did not see a decelerometer listed in the FGFE. Is one provided? | Maxwell AFB is not required to maintain a decelerometer. |
| T-00-017 | PWS, Pg 21-1-4, Para 21.1.2.4 | Are any of the Government Furnished/Contractor Operated vehicles currently outfitted with the required lights and markings? | AM vehicle(s) are contractor furnished and equipped. However, vehicle siren and speaker are government provided equipment. |
| T-00-018 | PWS, Pg 21-FB-1 and 21-FC-1, Para 21.FB.1 and 21.FC.1 | Review of Appendix 2FB and 2FC referenced, we do not see any GFE (such as binoculars, bird abatement, etc.) for Airfield Management and/or assigned to BLDG 844. If GFE is provided, please identify where it is located in the released material in the solicitation. | Most, but not all, Airfield Management equipment required to perform the PWS tasks are provided in appendix 2FB and 2FC. All equipment necessary to perform the work will be provided. Some equipment is not listed in the equipment listing because it is RPIE. Other equipment does not meet the cost threshold or pilferable criteria so it will not show up on the GFE lists. |
| T-00-019 | PWS, Pg 3-1-3, Para 3.1.1.2.3.12 | This paragraph states the SP has a requirement to de-ice aircraft. We do not see a deicer listed in Appendix 25FF. Is deicing equipment necessary? Is it available for use? | Deicing equipment consists of a hand-held pump sprayer (5 Gal) for minor spraying of aircraft wings |
| T-00-020 | PWS, Pg 3-1-3, Para 3.1.1.2.3.10 | This paragraph states the SP has a requirement to tow aircraft. Appendix 25FF shows tow vehicles assigned to AF Reserve. Are these vehicles available for use by SP? Historically, how many towing incidents per year are required? | Tow vehicles are Government owned (listed in 25FF) and are not assigned to AF Reserve. Maximum of 5 tows per year |
| T-00-021 | PWS, Pg 3-1-4, Para 3.1.1.2.5 and 3.1.1.2.6 | Both referenced paragraphs state the SP has a requirement to provide Transient Maintenance services at locations other than Maxwell AFB. What is the frequency of these events? Is servicing equipment available/provided at these other locations? If the equipment or vehicles are provided, please provide a listing with pertinent details. | This service is required only if Maxwell's runway is closed for an extended period of time and fixed wing aircraft cannot land on the runway. Service has not been used in more than ten years. Equipment would be same equipment used at Maxwell. Equipment listed in appendix 2FB |
| T-00-022 | PWS, Pg 3-1-6, Para 3.1.1.2.8.10 | Please provide workload associated with SP responsibility to perform equipment maintenance. Also, please provide a clearer equipment description for the equipment to be maintained. | AGE is listed in Appendix 2FB. Individual equipment workload to maintain and repair is the same as AGE at any installation. |
| T-00-023 | PWS, Pg 3-1-6, Para 3.1.1.2.8.15 | This paragraph states the SP has a requirement to transport TMDE to/from PMEL for repair. Please provide the location of the PMEL so we can factor time into this requirement. | The PMEL (Bldg 1513) is located on Gunter Annex 11 miles east of Maxwell |
| T-00-024 | PWS, Pg 3-1-6, Para 3.1.1.2.10 | Please identify the equipment and vehicles assigned to Transient Maintenance. | Equipment is listed on page 2-FB-8 starting at 7MC-2A-C-1 (LOW PAC) and ending at Cart, Oxygen. Pages 2-FC-318 through 2-FC-322(Location #2477) |
| T-00-025 | PWS, Pg 3-B-1, para 3.B.1.1.2 | Please provide current (2014) workload. | Day Shift Arrivals - 114 Day Shift Departures - 126 Night Shift Arrivals - 257 Night Shift Departures - 245 |
| T-00-026 | PWS, Pg 3-B-4, Para 3.B.1.2 | The chart provided indicates that the last complete painting for some of the static display craft is overdue. Have the craft been painted since the last chart update? Please provide an updated chart for Static Display. | BT-15 2 Jul 09, B-52 11 Aug 09, C-47 18 Apr 13, F-105 12 June 09, F-101 3 Mar 09, B-25 7 May 14, F-4 4 June 13, F-100 21 Aug 14, F-86 26 Jul 13, T-38 1 Feb 13, MH-53 24 Apr 09, T-41 25 Aug 10 |
| T-00-027 | PWS, Pg 3-1-2, Para 3.1.1.2.2.4 | This paragraph states that the SP has a requirement to meet transient aircraft with a “Follow Me” vehicle. Are the “Follow Me” vehicles provided by the Government? Are “Follow Me” signs provided by the Government? If the signs are not provided, please provide the specifications for them. | Follow Me vehicle provided by the contractor. Sign is provided by the government. |
| T-00-028 | RFP, Pg 312, L.3.3.4.1 | Paragraph reference: |
Past performance information pertaining to a subcontractor cannot be disclosed to the prime Offeror without the subcontractor’s consent. Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor. Consent Letters executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the Offeror can respond to such information.
| If an Offeror has no major subcontractors, and therefore no subcontractor past performance programs are submitted, is there still a requirement to submit subcontractor consent letters? | Subcontractor Consent letters are only required if the contractor will be supplying past performance of that subcontractor. | |||
| T-00-029 | PWS, Pg 3-1-1, Para 3.1.1.2.1.5 | The paragraph states that the Contractor will pick up SE from locations other than Maxwell AFB. Please provide estimated distances to these locations and frequency of the required trips. | Ft Benning, GA is about 90 miles from Maxwell. Dannelly Municipal Airport (187th ANG) is about 15 miles away. Trips average 2/year for Ft Benning and 3/year for Dannelly. | |
| T-00-030 | PWS Pg 3-1-4, Para 3.1.1.2.5, Appendix 3B | The paragraph states that Transient Alert operations will be required at alternate locations within a 25-mile radius. There is no frequency provided in the paragraph or corresponding workload. How many trips will be required to alternate locations for support annually? | Requirement removed from PWS | |
| T-00-031 | PWS, Pg 3-1-4, Para 3.1.1.2.5 | The paragraph states that Transient Alert operations will be required at alternate locations within a 25-mile radius. How much advance notice will the Contractor receive for these services? | Requirement removed from PWS | |
| T-00-032 | PWS, Pg 3-1-6, Para 3.1.1.2.8.11 | The paragraph states that Transient Alert will be responsible for maintaining SE in mission capable condition. Please confirm this “maintaining in mission capable condition” consists of daily ops checks and coordination with the AGE maintenance activity. | Mission capable means fully operational. | |
| T-00-033 | PWS, Pg 3-B-1, Para 3B1.1.1 | The paragraph states “please note that the requirements for two-person per aircraft handling and CDDAR response times”. Please confirm the Government will be evaluating manning estimates for transient alert to confirm that all offerors staff to a minimum of 2 persons for the entire service window as defined as 0800-2200 Monday through Friday and 1000 to 1800 on weekends. | Confirmed | |
| T-00-034 | PWS, Pg 21-1-4, Para 21.1.2.4 | The paragraph outlines the vehicle capability requirements for Airfield Management vehicles. Does the Government assess the provision of a single vehicle as technically acceptable for this requirement? | Yes | |
| T-00-035 | PWS, Pg 21-1-4, Para 21.1.2.4 | The paragraph outlines the vehicle capability requirements for Airfield Management vehicles. The paragraph also states that the truck is equipped with an LMR or multi-channel radio. Are these radios provided as GFP as they should be on the same net as the tower? | Radios are GFE | |
| T-00-036 | PWS Pg 25-1-1, Para 25.1.1 | The paragraph states that we are to provide sufficient manning as outlined in AFI 10-401 and AFI 10-403 for Maxwell. Please provide the local supplements that provides the specifics of support requirements for offeror review. | There is no supplemental guidance. | |
| T-00-037 | PWS Pg 25-1-1, Para 25.1.2.1 | The paragraph states that properly manifested cargo/passsengers are loaded aboard aircraft/bus as scheduled. Please confirm the manifests are provided to us by the Government. | See 25.1.2.2.1 Passenger data is provided to the SP for proper manifesting. | |
| T-00-038 | PWS Pg 25-1-1, Para 25.1.2.4 | The paragraph lists DRMS locations that service the installations. Please provide a breakdown, by location, of where DMRS shipments are taken. | See para 25.1.2.1.4 for location(s) (DRMS) is DRMO in the Workload Data | |
| T-00-039 | PWS Pg 25-1-1, Para 25.1.2.1.4 and 25B.11 | During the site visit, we were briefed that there were “1-2 shipments” to DRMS per week; however, the workload does not reflect this type of volume. Please confirm the number of shipments to DMRS that are to be supported. | See para 25.1.2.1.4 for location(s) (DRMS) is DRMO in the Workload Data | |
| T-00-040 | PWS Pg 25-1-2, Para 25.1.2.1.15 | The paragraph outlines 24 hour operations requirements. How many hours were performed after the normal duty hours for the function within the last 12 months? | The data for overtime hours is so small that it is not tracked and is consequently not available. To estimate overtime hours the Govt recommends looking in the following two areas and use your experience to determine hours necessary to support 1) see All Services table 2B.1.1.for exercises 2) see Transportation Exercises, Mobility, Cargo/Pax Processing tables 25B.1.10, 25B.1.12., 25B.1.22., | |
| T-00-041 | PWS Pg 25-1-2, Para 25.1.2.1.15 | The paragraph outlines 24 hour operations requirements. Are these items considered firm fixed price elements? | yes | |
| T-00-042 | PWS Pg 25-1-3, Para 25.1.2.1.18 | The paragraph outlines requirements that are normally accomplished by Traffic Management. Please confirm we are packing items prior to shipment, or simply confirming the paperwork is in order and items are packaged properly. | Confirmed. The SP will be required to: 25.1.2.1.18. Maintain personnel who are certified to prepare or inspect Hazardous Material (HM) for shipment in the Defense Transportation System, after ensuring they successfully complete HM training according to the Defense Transportation Regulation Part II, and AFMAN 24-204(I). | |
| T-00-043 | PWS Pg 25-1-3, Para 25.1.2.2.1 | The paragraph outlines requirements that are normally accomplished by Traffic Management. Please confirm that Transportation is performing these Personnel Deployment Function (PDF) responsibilities instead of just picking up palletized baggage. | The SP will be required to: 25.1.2.2.1. Process outbound and incoming passengers for ground or air transportation during contingency/deployment operations, or exercises. Service includes baggage check-in, palletizing, loading, checking identification of passengers, manifesting, and briefing. Enter passenger data in CMOS for in-transit visibility. Ensure troop commanders are briefed on all necessary travel arrangements. Perform an anti-hijack briefing, and maintain a sterile area from the time the passengers enter the briefings until departure. | |
| T-00-044 | PWS Pg 25-1-4, Para 25.1.2.2.6 | The paragraph outlines recurring bus schedule requirements. Please provide the current schedules with stop times. | PWS section 25B.1.1.. Has been updated to include workload data on the numbers of runs and the hours in operation for School Bus routes, Federal Prison Camp shuttles (weekday and weekend) and other bus runs as required for the year 2014. This is the most current workload available. Please refer to the updated 25B.1 for to view the information. | |
| T-00-045 | PWS Pg 25-1-4, Para 25.1.2.2.11 | The paragraph outlines 24 hour operations requirements. How many hours were performed after the normal duty hours for the function? | The data for overtime hours is so small that it is not tracked and is consequently not available. To estimate overtime hours you will look in two areas and use your experience to determine hours necessary to support 1) see All Services table 2B.1.1.for exercises 2) see Transportation Exercises, Mobility, Cargo/Pax Processing tables 25B.1.10, 25B.1.12., 25B.1.22., | |
| T-00-046 | PWS Pg 25-1-4, Para 25.1.2.3.1 | The paragraph defines the cleaning and servicing of Commanders vehicles. What is frequency of the cleaning? | Two vehicles, twice per week. | |
| T-00-047 | PWS Pg 25-1-5, Para 25.1.2.4 | The paragraph defines UDI fleet management but it's not clear that the vehicles are Government furnished. Are UDI vehicles Government furnished? | The UDI fleet consist of GFP provided under allowance standard 051, Government Owned Service Provider Operated Service Provider Replaced Vehicles and allowance standard 037, Government Owned Service Provider Operated Government Replaced Vehicles. | |
| T-00-048 | PWS Pg 25-1-5, Para 25.1.2.3.6 | The paragraph outlines the training plan requirement. Who is the OPR for these plans? | The service provider is the OPR, also see 25.1.2.1.10. 25.1.2.1.18. 25.1.2.3.9. 25.1.2.3.11. 25.1.2.4.9. | |
| T-00-049 | PWS Pg 25-1-6, Para 25.1.2.4.1 | The paragraph outlines maintenance of the Government furnished fleet. Does the Contractor get to also work on Contractor furnished items in Government furnished facilities? | Language was added to the PWS to clarify. "The Service Provider may use Government provided maintenance facilities to perform preventative maintenance and repair work on Service Provider owned vehicles that are used directly and exclusively to support the Maxwell/Gunter PWS requirements. Any other use is prohibited. " | |
| T-00-050 | PWS Pg 25-1-7, Para 25.1.2.4.9.2 | The paragraph defines on call requirements. Are these labor hours part of the firm fixed price? | yes | |
| T-00-051 | PWS Pg 25-1-7, Para 25.1.2.4.9.2 | The paragraph defines on call requirements. What is the number of hours used for these requirements in the last 12 months? | In the last twelve months there have been four responses at four hours each. For additional information please refer to section 25B.1. | |
| T-00-052 | PWS Pg 25-1-7, Para 25.1.2.4.10 | The paragraph states that transient repairs are at no additional cost. How much has been expended in the last 3 years for this by contract option year? | Over the last three years there has been a total of $1929.49 of cost. 2012 - $737.85: 2013 - $582.25: 2014 - $609.39 | |
| T-00-053 | PWS Pg 25-1-12, Para 25.1.2.7.5 | The paragraph defines purchasing requirements but we do not see a reimbursable CLIN for them. How is the contractor to be paid for them? | Labor and Materials for Vehicle Maintenance should be included in FFP proposal CLIN 0059. | |
| T-00-054 | PWS Pg 25-1-7, para 25.1.2.8 and subordinate paragraphs | These paragraphs outline safety attendant requirements but we don't see a count of routes and duration of each route. Please provide route information for routes that will require a safety attendant. | See 25.1.2.8.2 and 25.1.2.8.3 for the requirements and 25.1.2.8.5 for duration. | |
| T-00-055 | PWS Pg 25-B-1, para 25B.1.1 | The table provides dispatch counts and dispatch counts for specific areas. Please confirm that these dispatches for specific areas are also counted in total dispatch counts. | Correct | |
| T-00-056 | PWS Pg 25-B-3, para 25B.1.2 | The table lists equipment assigned to the TA function that doesn't appear to be listed as GFV or GFE. Please confirm these items are Government furnished. | The MB-4 Aircraft Tow vehicle, PSI Bobtail and Tug are government furnished. This list is developed annually from assigned vehicles, also see: 25.1.2.1.9.1 | |
| T-00-057 | PWS Pg 25-B-2, Para 25B.1.1 | COMMENT: Under TRANSPORTATION page 25-B-2 para 25B.1.1. WORKLOAD the last item lists “Contractor Replacement of Government Provided (code 051) Vehicles, Annually, 8 vehicles replaced at contractor expense per year”. |
| QUESTION: Can the GOV: 1) provide a list (by type and vehicle ID number) of vehicles in the 051 category, 2) provide replacement codes for each of the vehicles in the 51 category, and 3) either designate/pick the 8 annual required replacements, or will the Government accept the contractor’s replacement list? | 1) We will update the PWS Workload data to break out vehicles into specific categories in Appendix 25FF 2) See AFI 24-302 Para 4.80.2. 3) The contractor will determine replacement based on best business practices/replacement criteria. Government oversight will evaluate the process. | |||
| T-00-058 | PWS Pg 7-1-20, Para 7.1.2.5.4.2.1 and 7.1.1.2 | What are the workload factors associated with the technical support for PCs, Key Leaders, and PC based software? | The workload is sufficient for the offerors to propose. | |
| T-00-059 | PWS Pg 5-1-1, Para 5.1.1 | Page 5-1-1, Para 5.1.1 DESCRIPTION OF SERVICES states to "Provide Financial Management Services for Base Operating Support Activities including Non-Appropriated Funds (NAF), Appropriated Funds (APF), and Real Property Management". However, there is no description of services to be provided, no service summary and no estimated workload pertaining to real property management. | Real property management is located in section 10. The reference in section 5 will be removed. | |
| T-00-060 | PWS Pg 10-1-1, Para 10.1.1 and 10.1.2.2 | Page 10-1-1, para 10.1.1 DESCRIPTION OF SERVICES states to "The Installation Management activity is responsible for 1) Civil Engineering (CE) Financial Management; 2) Real Property……. Pages 10-1-3, 10-1-4, para 10.2.2, 10.2.3 describe real estate/real property services to be provided, a service summary and an estimated workload. Please clarify. Is it your intent for offerors to address real property/real estate in Section 10 or in Section 5? | Real property is addressed in Section 10. | |
| T-00-061 | PWS Pg 11-B-6 Through 11-B-10 | Table 11.B.1.2.1: |
1. The Power Pro hours for Emergency and Urgent calls are identical for FY10 and FY11
2. The Power Pro hours for “Other Operations: Exercises, Disaster…” is identical from FY10 to FY11
3. The Hours for Other Operations: Exercises, Disaster seem to have more than doubled for FY12
4. The Routine Hours for Equipment Operators/ Pavement Clearance operations in FY10 are three time that of the following years.
Table 11.3.2.4 (page 11-B-9)
1. The hours for structural shops Routine work varies such that the average time to perform a work order varies from 5 hours per service order in FY10 to 1.5 hours per service order in FY11 to more than 15 hours per service order in FY12.
2. Power Pro routine hours are identical from FY10 to FY11, even though the number of service calls have reduced by nearly 50%; and while the number of calls stayed constant from FY11 to FY12 for Power Pro, the number of hours dropped by more than 90%
3. The work orders and number of hours in Power Pro are identical for FY10 and FY11.
| 4. The Utilities (Plumbing and Liquid Fuels) number of hours is 10% of prior years values in FY12 while the number of actual service calls is 80% of prior year data | The data in table 11B.1.2.1. has been reviewed and is accurate. Please use existing workload data, PWS requirements, and your previous experience in CE to propose. | |||
| T-00-062 | PWS Pg 23-1-5, Para 23.1.2.2.1 | What does the government mean by reconditioning and maintenance of conventional munitions in PWS paragraph 23.1.2.2.1? | The term “maintenance” is inclusive of munitions. See AFI 21-201. | |
| T-00-063 | PWS Para 25.1.2.2.6 and subordinate paragraphs | PWS Paragraph 25.1.2.2.6 Addresses that the Contractor is to “Provide scheduled bus service for the transportation of authorized base, TDY, and local customers, including dependent school children, inmates at the Maxwell Federal Prison, special needs children and all other authorized requests…” |
1. Are the dependent school children bussed to schools on base, or are they bussed off base?
2. What is the distance to the schools from the housing areas.
3. Are the busses provided by the Government or are they contractor provided?
4. Are the busses required to meet DoDEA standards or standards required by the local community? Paragraph 25.1.2.8.6. states that DoDS will provide and install video surveillance equipment and safety restraints or car seats needed on all buses utilized for DoDS transportation, however, the bus we rode on the site visit did not have restraints.
5. Does the Government have a Specialty bus for special needs children or is it the contractors responsibility to provide the Equipment?
6. Is the School bus service included in the number of “Bus Dispatches”
7. How many current bus routes are there
| 8. How many students are there to transport, how many special needs, how many preschool, Sure-Start, prekindergarten and kindergarten students, will need transport | 1) Children are bussed from Gunter AFB to Maxwell AFB. 2) The distance between Gunter AFB and Maxwell AFB is approximately 11.2 Miles. 3) School Busses are Contractor provided. 4) Department of Transportation (DOT) standards are required. 5) Yes, there is one Specialty bus provided by the Contractor. 6) Yes 7) There are currently 5 school bus routes plus one Special Needs route. 8) Average weekly students transported is 178 (27 Pre-K and K; 69 Grades 1-3; 35 Grades 4-5; 47 Grades 6-8, and 2 Special Needs students. | |||
| T-00-064 | PWS, Pf 30B-1 to 30B-8, Appendix 30B, Table 30B.1 | The DRFP PWS dated 14 November 2014 included workload data for Human Resources Section 30 Appendix 30B.1 from FY 10-FY 12. In the FRFP PWS dated 9 April 2015 the workload data in Appendix 30B.1 is for the period of FY 03 – FY 05. Will the Government be issuing a revised Appendix 30B.1 with more recent workload data (i.e. DRFP FY10 - FY12 or newer), or are Offeror’s to use the FRFP PWS Appendix 30B.1 workload data for the period of FY 03 – FY 05? | Yes, that is correct. The government will issue a revised PWS with the current workload. | |
| T-00-065 | PWS Page 28-C-2, Appendix 28C, Table 28C.1.2.1, Mid-Bay Shores Area Recreation Site | PWS Section 28 (Community Services) Appendix 28 C includes a map of the Mid-Bay Shores Area Recreation Site. There is no workload data provided for this area, and no discussion of it in Section 28.1. Would the Government please confirm that PWS Section 28C.1.2.1 Mid-Bay Shores Area Recreation Site map is provided for informational purposes only, and Offeror’s have no associated support responsibility? | Correct; there will be no contract services in Florida. Services for Mid-Bay Shores have gone back to the government. The map is being pulled from PWS section 28. | |
| T-00-066 | PWS Pg 3-B-3/4, Para 3B.12, Static Display | Para 3B.1.2 states “Each aircraft will receive complete scuff sand and repaint every 6 years.” The table on page 3-B-4 shows numerous aircraft with last painting completed more than 6 years ago. Is this the most current information available? Will the current contractor be completing all the required static display painting to meet the 6 year threshold? If the current contractor does not complete the required static display painting to meet the 6 year threshold, how much time from the new contract start date will the new contractor have to complete the static display painting on those aircraft that are outside the 6 year threshold? | The current contractor will be completing the required painting and the PWS has been updated with the current status. | |
| T-00-067 | Workforce Demographic Information Atch. | The “Demographics-Seniority” provided in the “Workforce Demographic Information” attachment is specific to Local Union 9504 CBA page 21 Article 15 Vacation” and is not applicable to Local Union 13350 CBA page 20 Article XXI “Vacation”, which has a more lucrative vacation schedule. |
| In order for Offeror’s to properly calculate workforce requirements and associated benefit costs, would the Government please provide the Workforce Demographic Information for Local Union 13350? | Additional demographic information was requested, however, to this point, no additional information was supplied by the incumbant contractor. | ||
| T-00-068 | PWS Pg 28-C-2, Para 28C.1.2.1 | PWS Para 28C.1.2.1 shows a map of the Mid-Bay Shores Area Recreation Site; however, there is no Community Services workload in the PWS associated with this site. CBA 9504 identifies rates for the following classifications in Florida: (1) Park Attendant; (2) Laborer, Grounds Maintenance; (3) Services Maintenance Worker. |
| Will the successful Offeror be providing services in Florida? Are these services part of the workload in Section 28, Community Services? | No, there will be no contract services in Florida. Services for Mid-Bay Shores have gone back to the government. The park attendant, Laborer, Grounds Maintenance and Services Maintenance worker will not be included in the contract. | ||
| T-00-069 | PWS Pg 2-1-13, Para 2.1.2.14.3.1.3.11 | Both references refer to providing data and/or metrics used to report AF Common Output Levels (AF COLS) as established by HHQ. |
| Will the Government provide the AF COLS as part of the solicitation? | AF COLS will be requested from the contractor as needed. They will not be provided in the solicitation. The AF COL web page is listed as https://cs1.eis.af.mil/sites/AFCOLS/Pages/Home.aspx | ||
| T-00-070 | PWS Pg 2-1-15, Para 2.1.2.14.3.3.3 | PWS paragraph 2.1.2.14.3.3.3. Performance Measurement says: SDSs are stratified into four categories with each category assigned a total number of Quality Performance Indicator points (QPI) that are available: Tier One Performance Outcomes (50 QPI pts), Tier Two Performance Outcomes (30 QPI pts), and Compliance Metrics (20 QPI pts). |
| Four categories are mentioned, but only 3 are listed. Please clarify. | There are only three categories. The PWS will be corrected to reflect the correct number. | ||
| T-00-071 | PWS Pg 2-1-14, Para 2.1.2.14.3.3.2 | PWS paragraph 2.1.2.14.3.3.2. Validating Performance Outcomes and Data says: The PWS contains a list of SDSs that describe outcomes and performance standards. |
| Will the Government provide the SDS list as part of the solicitation? | SDSs are already provided in each service area. In section 2.1.2.14.3.3.2. it states that "The metric worksheets will be provided to the contractor on the first day of the transition period." |