Q A 4
19 KB Posted
- Attached to
- Columbus Aircraft Maintenance Services Federal contract opportunity
- Solicitation number
- FA3002-11-R-0007
About this file
Q A 4
Text of this file
Questions & Answers 4 Columbus Aircraft Maintenance
FA3002-11-R-0007
| No. |
| Solicitation |
Reference
PWS
Reference Additional/ Cross Reference
| Discussion/Question |
| Government Response |
PWS 3.1.3.4.1.
The PWS states "There may be there may be times when flying at the Golden Traingle Regional Airport (GTR),will require maintenance support (CAFB runway closure). Sorties flown and support at this location are considered local flying and are part of the annual flying hour program. Cost will be included in the SP price. In order to include requirements for operating at another location (work site), the SP requires the workload scope (number of aircraft, duration and frequency). The extent of operations at a second site may require additional vehicles for transportation of employees and other associated direct costs.
Will the Government provide the necessary projected workload such as the number of aircraft, duration of operational period and frequency?
Historically, the need for relocation to GTR has occurred only twice in the past 7 years. Because of the infrequent nature of this requirement, the actual transportation cost will be negotiated at the time of Government’s needs are identified.
PWS Para. 3.1.3.4.1. is revised to reflect this change and the updated PWS Section, 03 01 COL Acft Maint Description of Services, is attached to this Amendment 0006.
| 2 |
| RFP Atch 6, Cost/Price Model |
CLINs 0002-0005
1. Mobilization and Base Section B; Row eight (8) 0002 T-1A Maintenance; spreadsheet cell E8 is being divided by twelve (12) months instead of eleven (11) months.
2. Mobilization and Base Section B; Row twenty (20) 0003 T-6A Maintenance; spreadsheet cell E20 is being divided by twelve (12) months instead of eleven (11) months.
3. Mobilization and Base Section B; Row thirty-two (32) 0004 T-38C SUPT; spreadsheet cell E32 is being divided by twelve (12) months instead of eleven (11) months.
4. Mobilization and Base Section B; Row forty-four (44) 0005 T-38C IFF; spreadsheet cell E44 is being divided by twelve (12) months instead of eleven (11) months.
5. Total Section B; Column F, All Periods; column width setting needs to be increased in order to display the amounts reflected in the column.
Please adjust the width setting for Total Section B; Column F, All Periods.
CLINs 0002 – 0005 are corrected to reflect the 11-months base period.
The column width has been adjusted for Total Section B, Column F.
The updated Attachment 6, Cost/Price Model, is attached to this Amendment 0006.
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .