About this file

Q A 4

Text of this file

Questions & Answers 4 Columbus Aircraft Maintenance

FA3002-11-R-0007

No.
Solicitation

Reference

PWS

Reference Additional/ Cross Reference

Discussion/Question
Government Response

PWS 3.1.3.4.1.

The PWS states "There may be there may be times when flying at the Golden Traingle Regional Airport (GTR),will require maintenance support (CAFB runway closure). Sorties flown and support at this location are considered local flying and are part of the annual flying hour program. Cost will be included in the SP price. In order to include requirements for operating at another location (work site), the SP requires the workload scope (number of aircraft, duration and frequency). The extent of operations at a second site may require additional vehicles for transportation of employees and other associated direct costs.

Will the Government provide the necessary projected workload such as the number of aircraft, duration of operational period and frequency?

Historically, the need for relocation to GTR has occurred only twice in the past 7 years. Because of the infrequent nature of this requirement, the actual transportation cost will be negotiated at the time of Government’s needs are identified.

PWS Para. 3.1.3.4.1. is revised to reflect this change and the updated PWS Section, 03 01 COL Acft Maint Description of Services, is attached to this Amendment 0006.

2
RFP Atch 6, Cost/Price Model

CLINs 0002-0005

1. Mobilization and Base Section B; Row eight (8) 0002 T-1A Maintenance; spreadsheet cell E8 is being divided by twelve (12) months instead of eleven (11) months.

2. Mobilization and Base Section B; Row twenty (20) 0003 T-6A Maintenance; spreadsheet cell E20 is being divided by twelve (12) months instead of eleven (11) months.

3. Mobilization and Base Section B; Row thirty-two (32) 0004 T-38C SUPT; spreadsheet cell E32 is being divided by twelve (12) months instead of eleven (11) months.

4. Mobilization and Base Section B; Row forty-four (44) 0005 T-38C IFF; spreadsheet cell E44 is being divided by twelve (12) months instead of eleven (11) months.

5. Total Section B; Column F, All Periods; column width setting needs to be increased in order to display the amounts reflected in the column.

Please adjust the width setting for Total Section B; Column F, All Periods.

CLINs 0002 – 0005 are corrected to reflect the 11-months base period.

The column width has been adjusted for Total Section B, Column F.

The updated Attachment 6, Cost/Price Model, is attached to this Amendment 0006.

Other files for this federal contract opportunity

Other files attached to Columbus Aircraft Maintenance Services, newest first.
File Type Posted
03 04 COL Aircraft Maint Publications Appendix 3A —
02 01 COL All Services —
03 01 COL Acft Maint Description of Services —
03 05A COL Aircraft Maint Workload Appendix 3BA —
Amend 0008.doc DOC document
PWS Change Matrix.docx DOCX document
Atch 6 Cost Price Model Columbus —
Q A 5.docx DOCX document
Amendment 0007.doc DOC document
Atch 6 Cost Price Model Columbus —
Atch 6 Cost Price Model Columbus —
03 01 COL Acft Maint Description of Services —
Amendment 0006.doc DOC document
Q A —
Q A 2 —
Change of Summary for Amendment 0005.docx DOCX document
03 05A COL Aircraft Maint Workload Appendix 3BA —
Q A 3 —
Amendment 0005.doc DOC document
Atch 8 Manpower Matrix —
Q A 2 —
Amendment 0004.doc DOC document
Amendment 0003.doc DOC document
Rev 03 01 COL Acft Maint Description of Services —
Government Response to Industry Questions.docx DOCX document
PWS Change Matrix 0003.docx DOCX document
Rev 03 05B COL Aircraft Maint Workload Appendix 3BB —
Rev Atch 6 Cost Price Model Columbus —
Amendment 0003 Conformed RFP.doc DOC document
Rev Atch 4 CBA - DynCorp 1 Jul 09 —
Rev Atch 5 CBA - T Square 28 Jul 09 —
Rev 03 05A COL Aircraft Maint Workload Appendix 3BA —
Amendment 0002.doc DOC document
03 06 COL Aircraft Maint Facility Floor Plans Appendix 3C —
03 05A COL Aircraft Maint Workload Appendix 3BA —
03 10 COL Aircraft Maint GFP Facilities Appendix 3FA —
Amendment 0002 Conformed Copy.doc DOC document
Amend 1 RFP Conformed Copy.docx DOCX document
Amend 1 To correct SF 33 Page 1.docx DOCX document
Final RFP —
RFP Cover Letter —
Summary of PWS Changes from the Draft PWS.docx DOCX document
RFP Attachments in Zip File.zip ZIP file
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .