Section_M_Evaluation_Criteria.pdf
PDF 63 KB Posted
- Attached to
- Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ) Request for Proposal (RFP) Federal contract opportunity
- Solicitation number
- FA2835-19-R-A041
About this file
This document provides the evaluation criteria for a Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ) solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base. The solicitation seeks proposals for MACC IDIQ contracts to provide construction services at Hanscom Air Force Base, with an initial Pre-Construction Kick-off Task Order and a separate Building 1103 Demolition Task Order. Proposals will be evaluated on four factors: MACC IDIQ technical approach; B1103 Demolition Task Order technical approach; past performance; and price. Technical proposals must receive a rating of "Acceptable" for both the MACC IDIQ and Demolition Task Order factors to be eligible for award. The Government intends to award contracts to a target of up to three small businesses and will also award the Demolition Task Order to one of the MACC IDIQ holders.
FA2835-19-R-A041 Section J Attachment #18 MACC IDIQ Section M - Evaluation Criteria
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity (MACC IDIQ) Request for Proposal (RFP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA2835-19-R-A041
Section M - Evaluation Factors for Award
CLAUSES INCORPORATED BY REFERENCE
SECTION M
M-1
BASIS FOR CONTRACT AWARD
M-1.1. This competitive small business set-aside is a best value source selection that will be conducted using a Trade-Off process in accordance with Federal Acquisition Regulation (FAR) Part 15, as supplemented, Department of Defense (DoD) Source Selection Procedures, Air Force Federal Acquisition Regulation (AFFARS) Mandatory Procedure (MP) 5315.3, and as further refined in this solicitation. The Government intends to award Hanscom Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract(s) to a target of up to three (3) Small Business Contractors. The Small Business Contractors receiving a MACC IDIQ contract will also receive an initial Pre-Construction Kick-off Task Order which will meet the minimum ordering quantity. Among the Small Business Contractors receiving a MACC IDIQ contract the Government also intends to award the Building 1103 Demolition Task Order. The Government reserves the right to evaluate and/or award more than or fewer than the target number of contracts based upon Source Selection Authority (SSA) determination that it is in the Government's best interest. The SSA’s best interest determination will be based on a consideration of one or more of the following items: available funding, the need to sustain adequate competition, and the availability of awardable proposals, consistent with Trade-off procedures outlined in this solicitation, following completion of an integrated assessment of the proposals received.
M-1.2. Technical proposals will be assessed and assigned with one of the following ratings: “Acceptable” or “Unacceptable.” A rating of “Acceptable” will be required in the Technical factor for both the MACC IDIQ - Technical and the Building 1103 Demolition Task Order – Technical in order to be eligible for a MACC IDIQ award. “Acceptable” is defined as “Proposal meets the requirements of the solicitation.” An “Unacceptable” rating is defined as “Proposal does not meet the requirements of the solicitation.” If the Government elects to award without discussions, only Offerors with a Technical Rating of “Acceptable” for both the MACC IDIQ - Technical and B1103 Demolition Task Order - Technical will be considered. If the Government elects to open discussions, the competitive range may or may not include proposals rated as “Unacceptable” at the sole discretion of the Government.
M-1.3. Past performance evaluations will be rated as Substantial Confidence, Satisfactory Confidence, Neutral Confidence, Limited Confidence, or No Confidence as defined in Section M-3.4.3.
M-1.4. An Offeror’s proposed price must be determined fair and reasonable to be eligible for award. The Government will not award to Offerors with unreasonably high proposed prices or proposals that demonstrate a lack of understanding of the MACC IDIQ requirements or the B1103 Demolition Task Order. This includes both original submissions and, if required, final offers.
M-1.5. The Government reserves the right to award without discussions, but may conduct discussions if the Government determines it is necessary. If, after initial evaluation of the offers, the Contracting Officer determines there are proposals that are awardable at a fair and reasonable price, a decision may be made to award IDIQ contracts without discussions. Accordingly, Offerors are advised to submit initial proposals that are fully compliant and clearly acceptable without additional information. A competitive range, if required, may be further reduced for purposes of efficiency pursuant to FAR 15.306(c)(2).
M-1.6. In order to be eligible for award, Offerors are required to meet all solicitation requirements, such as terms and conditions; representations and certifications; evaluation factor requirements, and be deemed responsible in accordance FAR Part 9, as supplemented. If an Offeror fails to meet all solicitation requirements, the Government may not make an award to that Offeror.
M-2
FINAL PROPOSAL REVISION
M-2.1. The Government intends to award without discussions and make an award based on initial proposals;
however, discussions or negotiations may be held if the SSA determines them to be in the best interest of the Government. If discussions or negotiations are determined necessary the result would be a Final Proposal Revision (FPR). If it is determined to be in the best interest of the Government to hold discussions, the Government will make a Competitive Range determination, evaluation notices may be issued to Offerors in the competitive range, responses will be requested from applicable Offerors, and discussions will be opened. Formal responses to evaluation notices (if applicable), discussion items, and final proposal revisions will be considered in making the award decision. Offerors should be aware that a complete understanding as to price, technical, and all terms and conditions of the proposed contract must exist between the Offeror and the Government at the conclusion of discussions, if held.
M-2.2. Any revision or non-concurrence to contract terms and conditions submitted in the FPR may not be subject to further discussion or negotiation, and may render the offer unacceptable to the Government. This provision is not intended to restrict the Offeror’s opportunity to revise figures (e.g., prices, discounts, percentages, rates, etc.); rather, it is intended to preclude any misunderstandings by the Government, which could result if new or revised terms and conditions are submitted in the FPR that have not been fully disclosed, discussed and understood during discussions or negotiations. Hence, such new or revised terms and conditions are not solicited and, if submitted in the FPR, may render the offer unacceptable to the Government.
M-2.3. If, upon submission of the FPR, an Offeror materially changes their proposal such that the price is no longer fair and reasonable or other factor inputs change their evaluation results, the Offeror may be removed from consideration for award.
M-3
EVALUATION FACTORS AND METHODOLOGY
M-3.1. Proposals will be evaluated using four (4) evaluation factors as follows:
• Factor 1: MACC IDIQ - Technical
• Factor 2: B1103 Demolition Task Order - Technical
• Factor 3: Past Performance
• Factor 4: Price
M-3.1.2. Relative Order of Importance: Factors 1 and 2 will be rated on an “Acceptable”/”Unacceptable” basis.
Both Factor 1 and Factor 2 must be rated as “Acceptable” in order to be eligible for award. Of the remaining factors, Factor 3, Past Performance, is more important than Factor 4, Price. All evaluation factors other than price, when combined, are significantly more important than price, however price will contribute substantially to the award decision.
M-3.1.3. Factors 1 and 2 Technical Evaluation Approach: The proposal will be evaluated to determine whether the Offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the solicitation for both Factor 1, MACC IDIQ - Technical and Factor 2, B1103 Demolition Task Order -Technical. All proposals shall be subject to evaluation by the Source Selection Evaluation Board (SSEB) based on the evaluation criteria.
M-3.1.4. Factor 3 Past Performance: The Government will perform a Past Performance Confidence Assessment for each Offeror per DoD Source Selection Procedures Paragraph 3.1.3. The assessment will consider the quality of recent, relevant efforts provided by the Offeror, as well as, efforts, if any, found by the Government independently.
M-3.1.5. Factor 4 Price: The Government will conduct a Price analysis to determine price reasonableness of the Offerors proposed price.
M-3.1.6. Final Selection: The Government intends to award without discussions. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a technical and price standpoint. The SSA will make an integrated assessment of the evaluation results to determine which proposal(s) is (are) most advantageous to the Government.
M-3.1.6.1. The Government reserves the right to conduct discussions if the Source Selection Authority (SSA) later determines them to be necessary. If the SSA determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the SSA may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. If the Government does conduct discussions, these will be in writing.
M-3.1.6.2. The Contracting Officer will award MACC IDIQ contract(s) and Pre-Construction Kick-off Task Order(s) to responsible Offeror(s) whose proposal, as determined by the Source Selection Authority (SSA) conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered.
In addition, the Contracting Officer will award one (1) B1103 Demolition Task Order to one (1) of the MACC IDIQ contract holders that offers the best overall value to the Government, as determined by the SSA, all factors considered.
M-3.1.6.3. The Government will award MACC IDIQ contract(s) resulting from this solicitation to the firm(s) selected in accordance with the above procedures. The Government may reject any or all offers if such action is determined to be in the best interest of the Government.
M-3.2 FACTOR 1: MACC IDIQ TECHNICAL
M-3.2.1. Offeror’s proposal demonstrates an adequate understanding of the nature and scope of work required in the MACC IDIQ SOW and Specifications. The Government will not search for data to cure problems or address inconsistencies in an Offeror’s proposal. Each criteria will be assigned a rating of “Acceptable” or “Unacceptable” based on whether the proposal meets the MACC IDIQ requirements, and satisfactorily addresses the evaluation criteria identified below. Proposals that exceed the factor criteria will not receive higher ratings. A rating of “Acceptable” will be required in all Factor 1 criteria to be eligible for award.
M-3.2.2. This factor will evaluate the Offeror’s proposed Management Approach for accomplishing the work described in the MACC IDIQ requirements. In order to be considered acceptable, Offeror must demonstrate an adequate understanding of the MACC IDIQ requirements described in the solicitation and demonstrate that their management approach can accomplish those requirements. All criteria must be rated “Acceptable” to receive an “Acceptable” rating on this factor. The Offeror’s MACC IDIQ Management Approach will be evaluated based on the following:
a. Proposed approach to resourcing, organizing, and communication are consistent with MACC IDIQ requirements, to include managing multiple task orders simultaneously.
b. Proposed Management Approach includes sufficient levels of detail and specificity that demonstrate an adequate understanding of the MACC IDIQ requirements.
c. Proposed Organizational Chart and narrative are logical, free of contradictory/conflicting information, and identify all entities for which experience is being claimed under Factor 1.
d. The Offeror’s key personnel meet the minimum experience and education requirements listed in the MACC IDIQ solicitation.
RATING DEFINITION
ACCEPTABLE Proposal meets the requirements of the solicitation.
UNACCEPTABLE Proposal does not meet the requirements of the solicitation.
M-3.3 FACTOR 2: B1103 DEMOLITION TASK ORDER - TECHNICAL
M-3.3.1. Offeror’s proposals shall demonstrate a comprehensive understanding of the nature and scope of work required in the MACC IDIQ B1103 Demolition Task Order. Each technical criteria will be assigned a rating of “Acceptable” or “Unacceptable” based on whether the proposal meets the B1103 Demolition Task Order requirements, and satisfactorily addresses the evaluation criteria identified below. Proposals that exceed the factor criteria will not receive higher ratings. A rating of “Acceptable” will be required in all Factor 2 criteria to be eligible for award.
M-3.3.2. This factor will evaluate the Offeror’s proposed approach for accomplishing the work described in the B1103 Demolition Task Order requirements. In order to be considered acceptable, Offeror must demonstrate an understanding of the Task Order requirements described in the solicitation and demonstrate that their approach can successfully accomplish those requirements. The Offeror’s approach will be evaluated for completeness and reasonableness based on the following:
a. Proposed approach to meet B1103 Demolition requirements demonstrates a detailed understanding of the elements and trades necessary to successfully complete the project within the stated timeframe.
b. Proposed schedule incorporates the necessary elements of the project and demonstrates a logical workflow.
c. Proposed approach demonstrates an effective quality control process to ensure minimal issues/rework.
ACCEPTABLE Proposal meets the requirements of the solicitation.
UNACCEPTABLE Proposal does not meet the requirements of the solicitation.
M-3.4 FACTOR 3: PAST PERFORMANCE
M-3.4.1. The Government will evaluate this factor to assess Offeror’s recent and relevant present and past work record to determine confidence in each Offeror’s probability of successfully performing the MACC IDIQ requirements, as proposed. For purposes of this evaluation, the “Offeror” includes any joint ventures, and/or teaming partners proposed as part of the Prime Contractor’s team under this effort. The Government will evaluate the Offeror’s demonstrated record of contract compliance in supplying products and services that meet user’s needs, including quality, cost and schedule.
M-3.4.1.1. A recency determination will be made for each contract reference provided. Recency is defined as active contract performance during the five (5) years preceding the date of issuance of this solicitation. If a contract reference is determined recent (had some or all active performance in the five (5) years preceding the solicitation issuance date), and had active performance prior to the five (5) years preceding the date of issuance of this solicitation, the Government may only evaluate the Offeror’s performance record that occurred during the recency period.
M-3.4.1.2. A relevancy determination of the Offeror’s Present and Past Performance occurring during the recency window (five (5) years preceding the solicitation issuance date), will be made. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, joint venture, or teaming partner whose contract is being reviewed and evaluated. Higher relevancy will be assigned for contracts that are most similar to the effort, or portion of the effort, for which that Offeror is proposing. The Government is not bound by the Offeror’s opinion of relevancy. Scope of effort is defined as that documented in the Hanscom MACC ID/IQ SOW. The following relevancy definitions apply:
VERY
RELEVANT
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
RELEVANT Present/past performance effort involved similar scope and magnitude of efforts and complexities this solicitation requires.
SOMEWHAT
RELEVANT
Present/past performance effort involved some of the scope and magnitude of efforts and complexities this solicitation requires.
NOT
RELEVANT
Present/past performance effort involved little to none of the scope and magnitude of efforts and complexities this solicitation requires.
M-3.4.1.3. For each recent and relevant contract evaluated, the Government will also evaluate the quality of the Offeror’s performance. The Government is not bound by the Offeror’s opinion of its performance or relevance.
M-3.4.2. The Government evaluation team, known as the Performance Confidence Assessment Group (PCAG), will conduct a review and evaluation of performance data obtained to determine how closely the work performed under those efforts relates to the proposed Hanscom MACC IDIQ requirements. The PCAG will, as deemed necessary, confirm past and present performance data identified by Offerors in their proposals and obtain additional past and present performance data, if available from other sources. Past performance information may be obtained through one or more of the following: 1) the Past Performance Information Retrieval System (PPIRS); 2) similar systems of other Government departments and agencies; 3) customer questionnaires tailored to the circumstances of this acquisition; 4) DCMA channels; 5) interviews with program managers and contracting officers; and, 6) other sources known to the Government, including commercial sources.
M-3.4.3. The PCAG will consider Offeror’s past performance as an entire team (where primes in partnerships) or on an individual basis for Contractors proposing on their own. Each Offeror will receive a single integrated performance confidence assessment. This integration may include the recent and relevant present/past performance of the Prime Contractor, and joint ventures, and/or teaming partners. An Offeror’s overall confidence assessment will be impacted by past performance findings to include the amount and type of work proposed to be performed by each entity of the Offeror’s team. More recent performance or more relevant past performance may have greater impact on the performance confidence assessment. Although the past performance evaluation focuses on performance that is relevant to the MACC IDIQ, the resulting performance confidence assessment is made at the past performance factor level and represents an overall evaluation of Contractor performance and the resulting confidence level for work under this requirement. Each Offeror will receive one (1) overall performance confidence rating as follows:
SUBSTANTIAL
CONFIDENCE
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
SATISFACTORY
CONFIDENCE
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
NEUTRAL
CONFIDENCE
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
LIMITED
CONFIDENCE
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
NO CONFIDENCE Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
M-3.4.4. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation aspect or any unfavorable comments received from sources without a formal rating system.
When relevant performance record indicates performance problems, the Government will consider the number and severity of the problems and the appropriateness and effectiveness of any actual corrective actions taken (not just planned or promised). The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and to evaluate their effectiveness. In accordance with FAR 15.306(b), Communications must be held with any Offeror who will be excluded from competition because of adverse past performance information, unless the Offeror has previously had the opportunity to comment on such information.
M-3.4.5. Offerors without a record of relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on the past performance factor and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor. However, in making a comparative tradeoff decision for award, the SSA may consider a “Neutral Confidence” rating to be less advantageous to the Government than other confidence ratings.
M-3.4.6 In the course of evaluating Offeror’s proposals, the SSEB may contact references submitted by the Offerors. The SSEB may also check past performance information obtained from sources other than those identified by the Offerors. All gathered information will be used to evaluate the Offeror’s overall past performance. At no time during this process, or during the debriefing, or after award, will the names of individuals providing reference information about an Offeror's past performance be revealed to the Offerors or to any other party.
M-3.5 FACTOR 4: PRICE
M-4.5.1. The contract will be Firm-Fixed-Price (FFP). The Offeror’s price proposal for the MACC IDIQ will be evaluated at the total combined price proposed for the MACC IDIQ Pre-Construction Task Order plus the MACC IDIQ B1103 Demolition Task Order. The total evaluated price consists of the price proposed in the Section J, Attachment 17, MACC IDIQ –Task Order 01 and 02 Price Schedule, Pre-Construction Kick-off Task Order LINE 1 and B1103 Demolition Task Order LINE 2 of the solicitation.
M-4.5.2. A price analysis will be conducted in accordance with FAR 15.404-1. Comparison of the proposed prices among Offerors in response to the solicitation is the preferred and intended price analysis technique. Other techniques and procedures, if deemed necessary, may be used to ensure a fair and reasonable price, to include, but not limited to, the following: comparison of previously proposed costs/prices and previous Government and commercial contract costs/prices with current proposed costs/prices for the same or similar service/items;
comparison with competitive market costs/prices of similar indexes; GSA Schedule(s) or Department of Labor wage/salary indexes; or comparison of proposed costs/prices with the Independent Government estimate.