5_Airfields_&_Hangars_01540.pdf

PDF 258 KB Posted

Attached to
Joint Forces Paving for Colorado DoD Installations (CODI) Federal contract opportunity
Solicitation number
FA2550-18-R-1004
Issued by
Department of the Air Force Space Command

About this file

This notice announces a pre-solicitation for multiple indefinite-delivery, indefinite-quantity contracts for joint forces paving services at various Department of Defense installations in Colorado. The Air Force plans to award up to six firm-fixed-price contracts under a combined $200 million ceiling to 8(a) small businesses located in Region VIII or with a place of business in the geographic area. The contracts will have an initial five-year ordering period from September 2018 to September 2023 followed by a two-year option. The solicitation seeking proposals is expected to be posted on February 23rd, 2018 with proposals due on March 24th, 2018. The work will involve maintenance, repair, construction, and typical features for paved and unpaved structures such as roadways, bridges, sidewalks, parking areas, airfields, and runways across Air Force, Army and other DoD facilities in Colorado.

DRAFT Airfields & Hangars

View the file

Other files for this federal contract opportunity

Other files attached to Joint Forces Paving for Colorado DoD Installations (CODI), newest first.
File Type Posted
Attach_1_-_JFP_CODI_Site_Visit_Attendance_List_(redacted)_21_Feb_18.pdf PDF
JFP_CODI_Site_Visits_MFR_21_Feb_18.pdf PDF
Attach_2_-_JFP_CODI_Site_Visit_Q&A_21_Feb_18.pdf PDF
Site_Visit_MFR_9_Feb_18.pdf PDF
2_Organizational_Guidance__01030.pdf PDF
11_PAFB_Sample_Project_SOW.pdf PDF
7_CODI_PP_Questionaire.pdf PDF
10_Ft_Carson_Sample_Project.pdf PDF
9_Consent_Letter_Template.docx DOCX document
1_General_Requirements_01000.pdf PDF
8_Client_Authorization_Template.docx DOCX document
6_Task_Order_Close_Out_01700.pdf PDF
11.2_PAFB_Sample_Project_SUBMITTAL_SCHEDULE.xlsx XLSX spreadsheet
4_Safety_and_Health_01510.pdf PDF
3_Contractor_Quality_Control_01440.pdf PDF
11.1_PAFB_Sample_Project_DRAWING.dwg DWG drawing
12_Acronyms.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint Forces Paving for

Colorado DoD Installations (CODI)

SECTION 01540

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE

AIRFIELD OR AIRFIELD HANGARS

ATTACHMENT 5

1. GENERAL: The following provisions apply when work is required to take place on an active airfield/hangar or within clear zones or primary surfaces. Flight lines are present on the United States

Air Force Academy, Buckley AFB, Peterson AFB, and Fort Carson.

2. CLOSURES: All runway, taxiway or hangar closures will require the coordination of Base Operations through the cognizant Contracting Officer as specified at the task order level. The Contractor shall make the maximum utilization of time during the requested closure period. The Contractor shall notify the cognizant Contracting Officer when finished with the work requiring the closure. The Contractor shall schedule its operations in phases if necessary so as to minimize the effect of construction closures on normal airfield operations.

3. COORDINATION OF WORK: The Contractor shall coordinate with the cognizant Contracting

Officer before initiating any work and will notify him or her of the proposed location of work and time of operation.

4. PERSONNEL SAFETY PRECAUTIONS: Aircraft and support equipment operating in or near hangars or on or near the runways, taxiways, and aprons make the area of construction a zone of high level noise. The Contractor shall take the necessary precautions, such as the use of earplugs or muffs to prevent injury to the auditory systems of all personnel working in the area.

5. RESTRICTIONS: No Contractor vehicles, equipment, or personnel shall be on or crossing any active runway or taxiway, except during construction period closures as outlined herein or when clearance is requested from and granted by the control tower. All Contractor vehicles operating on the landing areas (1,000 feet on either side of the runway center line) during the period from dawn to dusk will be identified by mounted electric battery-operated low intensity, yellow or amber flashing lights. When

Contractor operations require crossing an active runway or other controlled area on a regular basis, the

Contractor shall furnish its crossing personnel a two-way radio in order to maintain contact with the control tower. The Government will provide the Contractor with the correct frequency. Use of the

Government-provided radio frequency for other purposes is strictly prohibited.

6. CLEANLINESS OF WORK AREA: The Contractor shall maintain cleanliness of all work areas at all times during progression of work in order to alleviate foreign object damage (FOD). The Contractor shall remove all materials and equipment to a safe distance, to be determined at the task order level, from the runway or aircraft parking area at the close of each day’s work.

7. EMERGENCIES: There may be periods when the Contractor, due to declared aircraft emergencies, will be required to vacate the work site and move its personnel and equipment a distance of several hundred feet away from the work site. Such removals, when ordered, will be given on short notice and expeditious action will be required. Whenever the Contractor is required to clear the work area, the

Contractor, accompanied by the inspector or Air Force or Army representative, will make an inspection sweep of the entire area to ensure all tools, equipment, and personnel have been removed from the runway, active taxiway or hangar, and that the area is available for landings or parking.

END OF SECTION 01540