4_Safety_and_Health_01510.pdf
PDF 43 KB Posted
- Attached to
- Joint Forces Paving for Colorado DoD Installations (CODI) Federal contract opportunity
- Solicitation number
- FA2550-18-R-1004
About this file
This document includes a federal contract solicitation and related project specifications for pavement maintenance services on Colorado Department of Defense installations. The solicitation will utilize multiple-award indefinite-delivery, indefinite-quantity contracts with a maximum value of $200 million to be awarded to up to six small businesses. Under the contracts, contractors shall provide management, labor, materials, and equipment for tasks such as road, bridge, sidewalk, and airfield construction and repair; landscaping; electrical work; and drainage projects. The solicitation is designated as a competitive 8(a) small business set-aside for firms in Colorado, Wyoming, Montana, South Dakota, North Dakota, and Utah. The Department of the Air Force Space Command will accept questions until January 2, 2018 and plans to post the official solicitation on February 23, 2018 with proposals due March 24, 2018 and initial task order performance from September 2018 to September 2023.
DRAFT Safety and Health
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach_1_-_JFP_CODI_Site_Visit_Attendance_List_(redacted)_21_Feb_18.pdf | ||
| JFP_CODI_Site_Visits_MFR_21_Feb_18.pdf | ||
| Attach_2_-_JFP_CODI_Site_Visit_Q&A_21_Feb_18.pdf | ||
| Site_Visit_MFR_9_Feb_18.pdf | ||
| 1_General_Requirements_01000.pdf | ||
| 8_Client_Authorization_Template.docx | DOCX document | |
| 6_Task_Order_Close_Out_01700.pdf | ||
| 11.2_PAFB_Sample_Project_SUBMITTAL_SCHEDULE.xlsx | XLSX spreadsheet | |
| 3_Contractor_Quality_Control_01440.pdf | ||
| 11.1_PAFB_Sample_Project_DRAWING.dwg | DWG drawing | |
| 5_Airfields_&_Hangars_01540.pdf | ||
| 12_Acronyms.pdf | ||
| 10_Ft_Carson_Sample_Project.pdf | ||
| 9_Consent_Letter_Template.docx | DOCX document | |
| 2_Organizational_Guidance__01030.pdf | ||
| 11_PAFB_Sample_Project_SOW.pdf | ||
| 7_CODI_PP_Questionaire.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Joint Forces Paving for Colorado DoD Installations (CODI)
SECTION 01510
SAFETY AND HEALTH REQUIREMENTS
ATTACHMENT 4
1. GENERAL: The Contractor shall maintain safe and healthful conditions for all personnel performing, or coming into contact with the performance of, the work required by this contract.
2. EXECUTION
2.1. Safety Program
2.1.1. The Contractor shall organize, maintain, and implement a safety program. The Contractor's management organization shall include administrative, liaison, and technical functions to implement, direct, monitor, control, and allocate resources for these tasks and allied safety efforts with other tasks of the project. As part of a comprehensive safety program, the safety tasks herein shall be accomplished by the Contractor to assure that safety requirements are satisfied.
2.1.2. The Contractor’s safety plan shall document the approach used to satisfy safety requirements. The Contractor's files containing safety and safety related data shall be available for review by the government as deemed necessary by the cognizant Contracting Officer.
2.2. Specific Safety Requirements.
2.2.1. No welding shall be permitted before the Contractor has obtained approval from the base fire marshal/chief. If approval is granted, welding shall be accomplished in accordance with (IAW) applicable safety standards. A trained person shall be used as the Welders Fire Watch while welding or cutting is being performed.
2.2.2. A confined space permit must be submitted to the Fire Department in the method and manner specified in the task order.
2.2.3. Emergencies: In the case of an emergency, the cognizant Contracting Officer, base fire chief, CE Operations Flight Chief, and Base Safety Office personnel, or their representative(s), have the authority to order the Contractor to terminate work and clear the area of personnel and equipment. The Contractor shall comply with such an order with all possible speed.
Joint Forces Paving for Colorado DoD Installations (CODI)
2.3. Mishap/Hazard Investigation
2.3.1. The Contractor shall report promptly by telephone to the c o g n i z a n t
Contracting Officer, all available information relating to each instance of a mishap involving government personnel or property. During weekends, holidays, or after normal Contracting Office duty hours, the Contractor shall notify the installation’s Security Forces.
2.3.2. The Contractor shall immediately secure, and impound any mishap scene, wreckage, and the mishap documentation until released by the investigation safety officer. Such release will be accomplished through the cognizant Contracting Officer.
2.3.3. The Contractor, and all related subcontractors within its control, shall support the Government, as it requires, in any mishap or hazard investigation. This support shall include, but not be limited to, technical assistance as well as access to undelivered internal contractor data.
END OF SECTION 01510