This submittal schedule outlines requirements for a project to repair asphalt roads at Peterson Air Force Base in Colorado. Key submittals and deadlines include concrete and asphalt mix designs due 14 days before work, subgrade and base course density results due 14 days before work, asphalt density test results due 14 days before work, and as-built drawings and warranty documentation due prior to final payment. The project includes repairing existing paved and unpaved structures and constructing new paved and unpaved structures such as roads, bridges, sidewalks, parking areas, and airfields.
The related federal contract opportunity is a presolicitation for multiple award task order contracts for paving Colorado Department of Defense installations with a ceiling value of $200 million. The solicitation will be posted on February 23rd with proposals due March 24th. The Department of the Air Force Space Command intends to award up to six contracts for a base period of September 18, 2018 to September 18, 2023 and an optional two-year extension.
DRAFT Peterson AFB Sample Project Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach_1_-_JFP_CODI_Site_Visit_Attendance_List_(redacted)_21_Feb_18.pdf | ||
| JFP_CODI_Site_Visits_MFR_21_Feb_18.pdf | ||
| Attach_2_-_JFP_CODI_Site_Visit_Q&A_21_Feb_18.pdf | ||
| Site_Visit_MFR_9_Feb_18.pdf | ||
| 2_Organizational_Guidance__01030.pdf | ||
| 11_PAFB_Sample_Project_SOW.pdf | ||
| 7_CODI_PP_Questionaire.pdf | ||
| 1_General_Requirements_01000.pdf | ||
| 8_Client_Authorization_Template.docx | DOCX document | |
| 6_Task_Order_Close_Out_01700.pdf | ||
| 4_Safety_and_Health_01510.pdf | ||
| 3_Contractor_Quality_Control_01440.pdf | ||
| 11.1_PAFB_Sample_Project_DRAWING.dwg | DWG drawing | |
| 5_Airfields_&_Hangars_01540.pdf | ||
| 12_Acronyms.pdf | ||
| 10_Ft_Carson_Sample_Project.pdf | ||
| 9_Consent_Letter_Template.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| CONTRACT NUMBER: | Award Date: | ||||||
| PROJECT NUMBER: | Notice to Proceed Date: | ||||||
| PROJECT TITLE: PAFB REPAIR ASPHALT ROAD | Contract Completion Date: | ||||||
| Item No. | Description of Item | Required Submission Date (Calendar Days) | Submittal Number | Contractor Approval | CE Approval | CONS Approval | Remarks |
| 1 | AF Form 103, Work Clearance Request | 14 days prior to work on site | No AF3000 required | ||||
| 2 | Final Progress Schedule | 5 days after NTP | |||||
| 3 | AF Form 1354 | Prior to Final Inspection | |||||
| 4 | Green Procurement Determination Form | Prior to 100% Progress Report | |||||
| 5 | Warranty Documentation | Prior to 100% Progress Report | |||||
| 6 | Recovered Materials Estimate and Certification Form | Prior to 100% Progress Report | |||||
| 7 | As-builts | Prior to 100% Progress Report | |||||
| 8 | Concrete mix design | 14 days prior to work on site | |||||
| 9 | Asphalt mix design | 14 days prior to work on site | |||||
| 10 | Subgrade/base course in-place density results | 14 days prior to work on site | |||||
| 11 | Asphalt in-place density test results | 14 days prior to work on site | |||||
| 12 | Paint data | 14 days prior to work on site | |||||
| 13 | Detectable warning surface data | 14 days prior to work on site | |||||
| 14 | Storm drain pipe data | 14 days prior to work on site | |||||
| 15 | Inlet/manhole shop drawings | 14 days prior to work on site |