SF30 Amend 04 20R00090004.pdf

PDF 520 KB Posted

Attached to
Space Coast Multiple Award Construction Contract (SCMACC) Federal contract opportunity
Solicitation number
FA252120R0009
Issued by
Department of the Air Force Space Command

About this file

This is a solicitation for the Space Coast Multiple Award Construction Contract (SCMACC) Indefinite Delivery, Indefinite Quantity (IDIQ) contract. The solicitation requests maintenance, repair and minor military construction services to be performed at Cape Canaveral Air Force Station, Patrick Air Force Base, Kennedy Space Center, and the Jonathan Dickinson Missile Tracking Annex in Florida. Work will include furnishing materials, equipment, transportation and personnel for design up to 100% and accomplishment of simultaneous construction projects. Services will support the 45th Space Wing, Naval Ordinance Test Unit, Air Force Technical Applications Center, National Aeronautics and Space Administration, and other tenant units. The contract will also be available for use by the 6th Contracting Squadron at MacDill Air Force Base to support natural disaster response. The solicitation includes 22 attachments providing specifications, statements of work, wage determinations, task order procedures, instructions to offerors, evaluation factors, financial and bonding information requests, consent forms, past performance questionnaires, and standard clauses.

View the file

Other files for this federal contract opportunity

Other files attached to Space Coast Multiple Award Construction Contract (SCMACC), newest first.
File Type Posted
Attachment 5 (revised)- SCMACC Section L.pdf PDF
SF30 Amend 03 20R00090003.pdf PDF
SF30 Amend 02 20R00090002.pdf PDF
Attachment 20b SCMACC QA (16-62).pdf PDF
Attachment 5 - SCMACC Section L (Rev).pdf PDF
Attachment 8-Bonding_Information_Request_Contractor.pdf PDF
Attachment 18-KSC Project Specific Requirements.pdf PDF
Attachment 10-Sample_Client_Authorization_Letter.pdf PDF
Attachment 8a-Bonding_Information_Request_Surety.pdf PDF
Attachment 3a-Wage Rate Requirements (Hillsborough Co.) (27 Mar 2020).pdf PDF
Attachment 16-NFS Clauses.pdf PDF
Attachment 3-Wage Rate Requirements (Brevard Co.) (15 May 2020).pdf PDF
Attachment 3b-Wage Rate Requirements (Martin Co.) (15 May 2020).pdf PDF
Attachment 20- SCMACC QA.pdf PDF
Attachment 15- MacDill Design Guide (2019).pdf PDF
Attachment 7a-Financial_Information_Request.pdf PDF
Attachment 5- SCMACC Section L.pdf PDF
Attachment 15a-MacDill Appendix and Forms.pdf PDF
Attachment 21- Q_A Template.pdf PDF
Attachment 19-NAF General Provisions_Clauses.pdf PDF
Attachment 18a-KSC Project Deliverables.pdf PDF
Attachment 11-Fully-Burdened_Hourly_Labor_Ratesv2.pdf PDF
Attachment 9-Consent_Letter.pdf PDF
Solicitation - FA252120R0009.pdf PDF
Attachment 2- SCMACC SOW.pdf PDF
Attachment 4-Task_Order_Procedures.pdf PDF
Attachment 7-Financial_Information_Request_Auth.pdf PDF
Attachment 4a-On-Off_Ramping_Procedures Rv1.pdf PDF
Attachment 13-Past_Performance_Questionnaire.pdf PDF
Attachment 17-KSC Clauses.pdf PDF
Attachment 20- SCMACC QA.pdf PDF
Attachment 3a-Wage Rate Requirements (Hillsborough Co.) (21Feb 2020).pdf PDF
Attachment 7a-Financial_Information_Request.pdf PDF
Attachment 18a-KSC Project Deliverables.pdf PDF
Attachment 3b-Wage Rate Requirements (Martin Co.) (31Jan2020).pdf PDF
Attachment 19-NAF General Provisions_Clauses.pdf PDF
Attachment 15a-MacDill Appendix and Forms.pdf PDF
Attachment 14-CAsPR_Questionnaire.pdf PDF
Attachment 4a-On-Off_Ramping_Procedures.pdf PDF
DRAFT Solicitation - FA252120R0009.pdf PDF
Attachment 6- SCMACC Section M.pdf PDF
Attachment 16-NFS Clauses.pdf PDF
Attachment 10-Sample_Client_Authorization_Letter.pdf PDF
Attachment 12-Past_Performance_Information_Citations_-_Unique_Areas.pdf PDF
Attachment 3-Wage Rate Requirements (Brevard Co.) (21Feb 2020).pdf PDF
Attachment 1- 45 CES Specifications.pdf PDF
Attachment 13-Past_Performance_Questionnaire.pdf PDF
Attachment 7-Financial_Information_Request_Contractor.pdf PDF
Attachment 8a-Bonding_Information_Request_Surety.pdf PDF
Attachment 17-KSC Clauses.pdf PDF
Show all 50

Space Coast Multiple Award Construction Contract (SCMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment 1- 45 CES Specifications Attachment 2- SCMACC Statement of Work Attachment 3- Wage Rate Requirements Determinations (Brevard Co.)

Attachment 3a- Wage Rate Requirements Determinations (Martin Co.)

Attachment 3b- Wage Rate Requirements Determinations (Hillsborough Co.)

Attachment 4- Task Order Procedures Attachment 4a- On-Off Ramping Procedures Attachment 5- SCMACC Section L, Instructions, Conditions, and Notices to Offerors Attachment 5 (revised)- SCMACC Section L, Instructions, Conditions, and Notices to Offerors Attachment 6- SCMACC Section M, Evaluation Factors for Award Attachment 7- Financial Information Request Contractor Attachment 7a- Financial Information Request Financial Institution Attachment 8- Bonding Information Request Contractor Attachment 8a- Bonding Information Request Surety Attachment 9- Consent Letter Attachment 10- Sample Client Authorization Letter Attachment 11- Fully-Burdened Hourly Labor Rates Attachment 12- Past Performance Information Citations - Unique Areas Attachment 13- Past Performance Questionnaire *Attachment 13- Past Performance Questionnaire (Rev) Attachment 14- Reserved Attachment 15- MacDill Design Guide (2019) Attachment 15a- MacDill Appendix and Forms Attachment 16- NFS Clauses Attachment 17- KSC Clauses Attachment 18- KSC Project Specific Requirements Attachment 18a- KSC Project Deliverable Attachment 19- NAF General Clauses Attachment 20-SCMACC Q&A Attachment 20a-SCMACC QA (#1-#15) Attachment 20b-SCMACC QA (#16-#62) Attachment 20b (revised)- SCMACC QA (#29 and #34) Attachment 21- Q&A Template Attachment 22- Badge Request 45 SFS Form V11

FA252120R00090004

IDCode:
Page: 1
Pages: 2
AmendNo: 0004
EffDate: 7/2/2020
ReqNo: A005973
ProjNo: Project numbers will be assigned at TO level
IssCode: FA2521
AdmCode:
IssuedBy: FA2521 45 CONS LGC

1201 EDWARD H WHITE II ST MS 7200

ADMINISTRATIVE ONLY NO REQUISITIONS

PATRICK AFB, FL 32925-3237

United States Sandra Seman, Email: sandra.seman@us.af.mil Telephone: 321-494-9955

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA252120R0009
SolDate: 5/28/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript: 1. Add Attachment 22- Badge Request 45 SFS Form V11 to the solicitation in Section J- Attachments.
ContNameTitle:
CoNameTitle: Sandra Seman

Email: sandra.seman@us.af.mil Telephone: 321-494-9955

ContDate:
CODate:

File details come from the government source that posted it. Updated .