Attachment 12-Past_Performance_Information_Citations_-_Unique_Areas.pdf

PDF 49 KB Posted

Attached to
Space Coast Multiple Award Construction Contract (SCMACC) Federal contract opportunity
Solicitation number
FA252120R0009
Issued by
Department of the Air Force Space Command

About this file

This document contains information regarding the evaluation of past performance citations for the Space Coast Multiple Award Construction Contract solicitation. Offerors must identify unique areas within each past performance citation provided. The unique areas include asbestos abatement, HVAC renovation, utility installation, voltage work, water system work, land clearing, waste water treatment plant repairs, paving, mold remediation, historic preservation, hurricane response, and demonstrating construction management flexibility. The past performance citations will be evaluated on a pass/fail basis in Phase One, and only offerors that pass will be considered in Phase Two of the evaluation.

The related federal contract opportunity is solicitation number FA252120R0009 for the Space Coast Multiple Award Construction Contract. The contract will provide maintenance, repair, and minor construction services for the 45th Space Wing, Naval Ordinance Test Unit, Air Force Technical Applications Center, NASA, and other tenants located at Cape Canaveral Air Force Station and Patrick Air Force Base in Florida. The contract may also be used by the 6th Contracting Squadron at MacDill Air Force Base to support natural disaster response.

View the file

Other files for this federal contract opportunity

Other files attached to Space Coast Multiple Award Construction Contract (SCMACC), newest first.
File Type Posted
SF30 Amend 04 20R00090004.pdf PDF
Attachment 22- Badge Request 45 SFS Form V11.pdf PDF
SF30 Amend 03 20R00090003.pdf PDF
Attachment 5 (revised)- SCMACC Section L.pdf PDF
Attachment 20b (revised) SCMACC QA (29_ 34).pdf PDF
SF30 Amend 02 20R00090002.pdf PDF
Attachment 20b SCMACC QA (16-62).pdf PDF
Attachment 5 - SCMACC Section L (Rev).pdf PDF
Attachment 13-Past_Performance_Questionnaire (Rev).pdf PDF
Attachment 5- SCMACC Section L.pdf PDF
Attachment 15a-MacDill Appendix and Forms.pdf PDF
Attachment 7a-Financial_Information_Request.pdf PDF
Attachment 21- Q_A Template.pdf PDF
Attachment 8-Bonding_Information_Request_Contractor.pdf PDF
Attachment 15- MacDill Design Guide (2019).pdf PDF
Attachment 18-KSC Project Specific Requirements.pdf PDF
Attachment 20- SCMACC QA.pdf PDF
Attachment 3a-Wage Rate Requirements (Hillsborough Co.) (27 Mar 2020).pdf PDF
Attachment 16-NFS Clauses.pdf PDF
Attachment 3-Wage Rate Requirements (Brevard Co.) (15 May 2020).pdf PDF
Attachment 3b-Wage Rate Requirements (Martin Co.) (15 May 2020).pdf PDF
Attachment 8a-Bonding_Information_Request_Surety.pdf PDF
Attachment 10-Sample_Client_Authorization_Letter.pdf PDF
Attachment 14 RESERVED.pdf PDF
Attachment 1- 45 CES Specifications.pdf PDF
Presolicitation Notice.pdf PDF
Attachment 20- SCMACC QA.pdf PDF
Attachment 10-Sample_Client_Authorization_Letter.pdf PDF
Attachment 4a-On-Off_Ramping_Procedures.pdf PDF
Attachment 12-Past_Performance_Information_Citations_-_Unique_Areas.pdf PDF
Attachment 16-NFS Clauses.pdf PDF
Attachment 6- SCMACC Section M.pdf PDF
DRAFT Solicitation - FA252120R0009.pdf PDF
Attachment 3-Wage Rate Requirements (Brevard Co.) (21Feb 2020).pdf PDF
Attachment 1- 45 CES Specifications.pdf PDF
Attachment 3a-Wage Rate Requirements (Hillsborough Co.) (21Feb 2020).pdf PDF
Attachment 7a-Financial_Information_Request.pdf PDF
Attachment 18a-KSC Project Deliverables.pdf PDF
Attachment 14-CAsPR_Questionnaire.pdf PDF
Attachment 3b-Wage Rate Requirements (Martin Co.) (31Jan2020).pdf PDF
Attachment 19-NAF General Provisions_Clauses.pdf PDF
Attachment 15a-MacDill Appendix and Forms.pdf PDF
Attachment 2- SCMACC SOW (6 Apr 20).pdf PDF
Attachment 5- SCMACC Section L.pdf PDF
Attachment 15- MacDill Design Guide (2019).pdf PDF
Attachment 4-Task_Order_Procedures.pdf PDF
Attachment 9-Consent_Letter.pdf PDF
Attachment 18-KSC Project Specific Requirements.pdf PDF
Attachment 8-Bonding_Information_Request_Contractor.pdf PDF
Attachment 11-Fully-Burdened_Hourly_Labor_Rates.pdf PDF
Show all 50

Space Coast Multiple Award Construction Contract (SCMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12 - Past Performance Information Citations -- Unique Areas Space Coast Multiple Award Construction Contract (SCMACC)

RFP # FA252120R0009

Identify the "unique areas" within each past performance information citation. You may select multiple "unique areas" per citation. If a particular citation does not contain a "unique area," select "Other." For Phase One only information contained within the offeror's past performance citations will be evaluated for unique areas. Phase One will be evaluated on a pass or fail basis. Only offerors that pass Phase One will be considered for Phase Two. See Section M, C., c., ii. Relevancy, for further details.

Citation 1:

Past Performance Information Citation Title:

Asbestos and hazardous metal management/abatement HVAC renovation and controls Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements Other:________________________________________________________________________________ Not Applicable

Citation 2:

Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements

Other: _______________________________________________________________________________

Citation 3:

Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements

Citation 4:

Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements

Citation 5:

Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements Other: ______________________________________________________________________________

Citation 6:

Utility installation and repair requiring trenching and horizontal directional drilling Low and medium voltage installation Potable and non-potable water system installation and repair Land clearing with invasive species remediation Repairs and upgrades to waste water plants to include SCADA controls Paving to include roads for heavy vehicles Mold/mildew remediation and cleanup Historic preservation or artifact restoration Hurricane response/recovery Demonstrate efficient construction management practices and flexibility while construction activities are constrained by customer mission requirements Other: ______________________________________________________________________________

Attachment 12 - Past Performance Information Citations -- Unique Areas Space Coast Multiple Award Construction Contract (SCMACC)

File details come from the government source that posted it. Updated .