Davis Bacon Act WD FL17 Mod 7 dated 31 Dec 10.pdf
PDF 66 KB Posted
- Attached to
- Roofing Indefinite Delivery Indefinite Quantity Contract Federal contract opportunity
- Solicitation number
- FA2521-09-R-0052
About this file
Davis Bacon Wage Determination
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: FL100017 12/31/2010 FL17
Superseded General Decision Number: FL20080017
State: Florida
Construction Types: Building, Heavy and Highway
County: Brevard County in Florida.
**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY
SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING
CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Modification Number Publication Date
0 03/12/2010
1 04/23/2010
2 09/03/2010
3 09/10/2010
4 10/29/2010
5 11/12/2010
6 12/17/2010
7 12/31/2010
ASBE0067-001 07/01/2009
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 24.87 10.10
ASBE0067-002 07/01/2009
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not).........$ 24.87 10.10
BOIL0199-001 01/01/2009
BOILERMAKER......................$ 27.63 13.96
All other work..............$ 25.13 13.96
* BRFL0001-001 05/01/2010
BRICKLAYER (BRICKLAYERS,
BLOCKLAYERS, PLASTERERS,
TERRAZZO WORKERS, TILE
SETTERS AND CEMENT MASONS)
COMMERCIAL..................$ 18.50 6.00
INDUSTRIAL..................$ 23.15 7.85
INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape
Canaveral Air Force Station and Kennedy Space Flight Center.
CARP1000-001 07/01/2008
MILLWRIGHT.......................$ 26.93 10.49
* CARP1765-001 05/01/2008
Carpenters:
*INDUSTRIAL:
CARPENTERS.................$ 23.96 7.21
PILEDRIVERMEN..............$ 21.75 8.65
COMMERCIAL:
CARPENTERS.................$ 22.46 7.21
PILEDRIVERMEN..............$ 21.75 8.65
ELEC0222-001 09/01/2009
Line Construction:
CABLE SPLICER...............$ 33.86 4.75+23%
GROUNDMAN...................$ 18.38 4.75+23%
LINEMAN; HEAVY EQUIPMENT
OPERATOR....................$ 32.25 4.75+23%
ELEC0756-001 09/01/2010
Electricians:
Cable Splicer...............$ 27.75 6.45+4.4%
Wireman.....................$ 27.75 6.45+4.4%
ELEV0139-001 01/01/2010
ELEVATOR MECHANIC................$ 35.08 20.235+A
FOOTNOTE:
A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.
Paid Holidays: New Year's Day; Memorial Day; Independence
Day; Labor Day; Thanksgiving Day; The Day After
Thanksgiving and Christmas Day.
ENGI0673-001 05/01/2010
Power equipment operators:
GROUP 1.....................$ 23.25 8.80
GROUP 2.....................$ 22.45 8.80
GROUP 3.....................$ 20.91 8.80
GROUP 4.....................$ 19.27 8.80
POWER EQUIPMENT OPERATORS
CLASSIFICATIONS GROUP 1: Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver
(incluidng auger and boring machine)
GROUP 2: Mechanic/Welder and operators of: Gantry Crane, Bridge Crane, Clam Shell, Dragline, Backhoe, Gradeall, Grader, Sideboom Cat, Hulti-Drum Hoist, Highlift (10' or higher), Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom
GROUP 3: Bulddozers, Forklifts, Straddle Buggy, Single Drum
Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating
Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer
GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor boat, Power Boat, Power
Sweeper, Welding Machine, Oiler, Mechanic's Helper, Pump, Conveyor, Roller, Watertruck, Asphalt distributor, Concrete
Pump (trailer type), Utility Operator
IRON0808-001 07/01/2009
IRONWORKER.......................$ 24.28 9.95
LABO0517-001 05/01/2008
Laborers:
Asbestos Abatement, Hazardous and Toxic Waste
Removal Laborers; (On all mechaincal systems: Lead
Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;.......$ 17.50 5.47
Carpenter Tender, Cement
Mason Tender, Block/
Bricklayer Tender
Plasterer Tender............$ 17.50 5.47
Demolition Laborers.........$ 17.50 5.47
General Laborer.............$ 17.35 5.47
Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools.......................$ 16.32 5.47
PAIN0078-001 08/01/2010
GLAZIER..........................$ 22.00 8.10
PAIN0078-002 01/01/2010
PAINTER..........................$ 23.25 9.95
PLUM0295-001 01/01/2010
Plumber/Pipefitter/Steamfitter
INDUSTRIAL: Bulk
Plants, Power-houses, Chemical Plants, Missile
Sites, (Including all Work at Cape Canaveral Air
Force Station and Kennedy
Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other wirk which is related to and considered a part of the above type projects....................$ 30.80 14.87
Schools, Hospitals, Shopping Centers, and work not listed as Industrial....$ 30.80 14.87
ROOF0103-001 02/01/2003
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 14.50 5.10
SFFL0821-002 01/01/2010
SPRINKLER FITTER
Commercial..................$ 26.80 14.30
Industrial..................$ 29.00 14.30
Industrial: Jobs covering sugar mills, power plants, trash burning plants, military installations and Cape Kennedy. All other work shall be commercial rate.
SHEE0015-001 07/01/2009
SHEETMETAL WORKER................$ 25.41 12.78
TEAM0385-001 05/01/1990
TRUCK DRIVER.....................$ 13.00 .80
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .