PARCS Site Visit Brief.pdf
PDF 2 MB Posted
- Attached to
- Perimeter Acquisition Radar Attack Characterization System (PARCS) Operations, Maintenance, and Support (OM&S) Services Federal contract opportunity
- Solicitation number
- FA2518-21-R-0024
About this file
This document provides details of a pre-solicitation notice for operations, maintenance, and support services for the Perimeter Acquisition Radar Attack Characterization System (PARCS) at Cavalier Space Force Station in North Dakota. Requirements include managing radar and mission computer maintenance, civil engineering, environmental functions, security, logistics, and communications on a 24/7 basis. The contractor must provide all necessary personnel and resources to meet station requirements specified in the performance work statement. Support is also required for system upgrades and day-to-day operations. The solicitation number is FA2518-21-R-0024 and the agency is the Department of the Air Force Space Command. Proposals are due by 28 February 2022 and contract award is anticipated for 30 January 2023, with a contract start date of 1 May 2023 after a two-month phase-in period. The incumbent contractor was not specified.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERIMETER ACQUISITION RADAR
ATTACK CHARACTERIZATION
SYSTEM (PARCS) INDUSTRY DAY
AND PRE-PROPOSAL
CONFERENCE
Contracting Officer:
Diana Cramer, SAM-D/PKG
Program Manager:
Lisa Markel, SAM-D/PMG
21-22 Sep 2021
PARCS Industry Day 1 Agenda 0800 – 0900
Government Team Introductions and Welcome Site Informational Brief/Safety Briefing Purpose of Industry Day/Ground Rules Mission Briefing
0900 - 1000 PWS Requirements
1000 – 1100 Projected Contract Information
Lunch 1100 - 1300 1300 - 1600
Tour PAR 1630 - 1700
Closing Comments and preview of Day 2 Agenda
PARCS Pre-Proposal Conference Day 2 Agenda
0800 – 1100 Review Ground Rules Request for Proposal (RFP) Information Review Request for Proposal Acquisition Schedule
Lunch 1100 – 1300
1300 – Close of Day Civil Engineering: Walking/Driving Installation Tour Collect Questions Closing Comments
Government Team Introductions
Lt Col Travis Kennebeck – 10 SWS Commander
Maj Justin Jones – 10 SWS Director of Operations
Mr. Scott Holmquist – 10 SWS Mission Support Deputy Chief
Mr. Brian Hornbaker – 10 SWS Mission Support
Ms. Lisa Markel – Program Manager
Ms. Diana Cramer – Contracting Officer
Mr. Gonzalo O’Campo – DEL 4 Chief of Maintenance
Mr. Mike Shonka – 21 CES/CENP CE Site Support
Mr. Jim Richey – Quality Assurance Manager
Mr. Mike Mejia – Quality Assurance Manager
Purpose of Industry Day and Preproposal Conference
The purpose of Industry Day and Pre-Proposal Conference is to provide information and to solicit feedback on the upcoming PARCS contract requirements
This conference will provide an information exchange opportunity between the Government and Contractors
Please do not use this as a marketing opportunity, but as an opportunity to better understand requirements
Industry Day Ground Rules No Recordings / No photographs or videos
Turn off cell phone ringers. NO phones in the PAR building
Nothing stated in the Industry Day/Pre-performance Conference is contractually binding, including briefing info
The Government will post the following on SAM.gov:
Attendance roster, to facilitate subcontracting opportunities Government briefing charts All questions and answers
All questions must be submitted in writing to the Contracting Officer no later than Tuesday, 5 October 2021
Any proprietary information sent with questions needs to be identified by the Contractor, so the Government does not inadvertently record and post such information to SAM.gov
JS2
JA1
Slide 6
JS2 Is this a standard practice? Other than in classified areas, what is the concern with pictures?
JONES, JUSTIN H Maj USSF SPOC 10 SWS/DO, 9/2/2021
JA1 No recordings is standard practice. The no photographs/videos pertains to the PAR build. Most people use cell phones to take pictures and videos. Cell phones are not allowed in the PAR building. This also helps control information. We have to make sure we provide equal access to information.
JENNIFER ALLEN, 9/8/2021
Preproposal Conference Ground Rules
There will be no side-bar meetings or discussions with any Government personnel
The Government will not comment on another acquisition or associated requirements (for example, SPO Reacq)
No agreements, promises, or other commitments are made or implied by the Government or Contractors participating in Industry Day/Preproposal Conference
Any costs incurred by your company prior to receipt of a contract signed by the CO is at your own risk
The Government may, or may not, incorporate changes to the solicitation or requirements based on feedback received
All Government direction or changes will be communicated in writing by the CO through SAM.gov
PARCS Mission Briefing Maj Justin Jones
PERIMETER ACQUISITION
RADAR ATTACK
CHARACTERIZATION SYSTEM
(PARCS)
Program Manager:
Lisa Markel, SAM-D/PMG
Requirements/Service Summary/ Future Requirements/Risks
PARCS Requirements Mission
The PARCS provides strategic warning and attack assessment of sea-launched and intercontinental ballistic missiles launched against the continental United States and southern Canada; continuously provides critical missile warning and space domain awareness to North American Aerospace Defense Command, United States Space Operations Command, and regional combatant commanders; and monitors and tracks earth-orbiting objects to enable space domain awareness and space control.
JS6
DC25
JA4
Slide 10
JS6 United States Space Command JONES, JUSTIN H Maj USSF SPOC 10 SWS/DO, 9/2/2021
DC25 In addition to STRATCOM, or in place of? or US Space Operations Command (SpOC)?
DIANA CRAMER, 9/7/2021
JA4 please check that I made an acurate correction.
JENNIFER ALLEN, 9/8/2021
PARCS Requirements cont’d.
Scope
The Contractor shall provide non-personal services to operate, maintain, and support (OM&S) the Perimeter Acquisition Radar Attack Characterization System (PARCS) at Cavalier Space Force Station (SFS), ND.
Services encompass base support including management of radar and mission computer maintenance, civil engineering, environmental functions, security, logistics, sensitive and non-sensitive communications.
The Contractor shall provide all necessary personnel, administrative, and managerial resources necessary on a continuous, 24-hours-a-day, 7-days-a-week (24/7) basis to meet Space Force Station operations and maintenance requirements as specified in the PWS.
Scope
Support Radar Operational Time as specified in the PWS. Services shall include support for system upgrades and modifications, as well as provide day-to-day support services. The Contractor shall perform organizational level maintenance on system upgrades and modifications once they are accepted by the Government.
Overall Objective: To obtain an OM&S contract to support a non-personal services for PARCS, to include:
Radar Operations Support On-Site Operational System Analysis Mission Systems Maintenance Communications-Operations and Maintenance Logistics Management Civil Engineering Industrial, Physical, and Operational Security Occupational and Bioenvironmental Health Environmental Management Knowledge Management and Retention
Contractor shall provide all necessary personnel, administrative, and managerial resources necessary for 24 hours-a-day/7 days-a-week (24/7) basis to meet mission requirements as specified in the PWS
Critical Performance Objectives identified in Services Summary
Quality Assurance Surveillance Plan established Monthly Certificate of Service (COS) Annual Contractor Performance Assessment Report (CPAR)
• PWS Service Summary Items:
Chapter 2 – Radar Operations Support
Performance Objective #1
PWS
Reference Performance Threshold
The Contractor shall maintain an overall Radar Acc each calendar month of not less than 99% to meet mission operational Acc.
Section 1, Chapter 2, Paragraph 2.2
Maintain Contractor-Controlled Availability (ACC) of not less than 99% percent per calendar month.
Chapter 4 – Mission System Maintenance
Performance Objective #2 PWS Reference
Performance Threshold
IMDS Data Entry. Input all of Standard Reporting Designator (SRD) reportable maintenance data into IMDS/Job Documentation Data (JDD) subsystem, within three days of completion
Section 1, Chapter 4, Paragraph 4.2.4
Maintenance data collection data shall be entered into IMDS with 95% initial accuracy and 100% accuracy within 3 days.
Chapter 4 – Mission System Maintenance
Performance Objective #3
PWS
Reference Performance Threshold
Equipment Status Reporting (ESR). The Contractor shall report equipment status changes IAW AFI 21-103, AFSPC Sup 1, Paragraphs 6.1 through 6.3, 6.5 through 6.7, and local procedures on a real-time basis.
Section 1, Chapter 4, Paragraph 4.2.5
Updates are made within 24 hours.
Chapter 4 – Mission System Maintenance
Performance Objective #4 PWS Reference
Performance Threshold
Test, Measurement, and Diagnostic Equipment (TMDE).
The Contractor shall manage, schedule, transport, or ship at the Government’s determination TMDE IAW AFSPCI 21-108, Paragraphs 3.12.1, 3.12.2 and 7.1.4, TO 33K-1-100 (series), and TO 00-20-14, Paragraphs 3.6 through 3.8. Perform organizational maintenance IAW TO 33-1-27 and TO 33-1-32.
Section 1, Chapter 4, Paragraph 4.3
No failed TMDE inspections.
Chapter 8 – Industrial, Physical and Operational Security
Performance Objective #5
PWS
Reference Performance Threshold
Industrial/Information Security. The Contractor shall implement and perform all required industrial/information security functions and actions IAW the certified DD Form 254 and DoD 5220.22-M, to minimize infractions and to ensure zero security incidents resulting in violations at Cavalier SFS.
Section 1, Chapter 8
Paragraph 8.2
Zero security incidents resulting in violations.
PARCS Future Requirements
Future Requirements – not at this time
Projected Sustainment Upgrades – none projected at this time
CHARACTERIZATION SYSTEM
(PARCS)
Contracting Officer:
Diana Cramer, SAM-D/PKG
Projected Contract Information
NAICS: 517919 –All other telecommunications
Small business size standard $35M
PSC: M1BC – Operation of Radar and Navigational Facilities
Competitive: Full & Open
Contract Type: Hybrid Firm-Fixed Price (FFP) CLINS Cost Reimbursement (CR) CLINs Individual Job Order (IJO) CLINs (Primarily FFP or CR, rarely
Cost Plus Fixed Fee)
PARCS Contract Periods of Performance
Phase In (2 Months) 1 March 2023 - 30 April 2023
Base Period (10 months) 1 May 2023 - 29 February 2024
Option One (12 months) 1 March 2024 - 28 February 2025
Option Two (12 months) 1 March 2025 - 28 February 2026
Option Three (12 months) 1 March 2026 - 28 February 2027
Option Four (12 months) 1 March 2027 - 29 February 2028
Option Five (12 months) 1 March 2028 - 28 February 2029
Extension of Services (Up to 6 months) 1 March 2029 - 31 August 2029
Collective Bargaining Agreement (CBA) with International Brotherhood of Electrical Workers Local (IBEW) 1426
The Government shall incorporate current and applicable CBA and Department of Labor Wage Determinations (WDs) into Section J of the RFP
For those positions covered by CBA, the contractor must meet the minimum requirements of the CBA and shall also propose the latest negotiated labor rate, FY22, for all contract years
Do not escalate proposed out-year CBA labor rate (Subsequent option year CBA labor rates and associated costs shall not be escalated)
Wage increase adjustments for subsequent option years will be made as authorized and in accordance with FAR 52.222-43 “Fair Labor Standards Act and Service Contract Labor Standards – Price Adjustment (Multiple Year and Option Contracts)” if and when terms of the applicable CBA Impact change. At that time the contractor will be authorized to submit requests for equitable adjustments for subsequent option year increases if all applicable FAR clauses requirements have been met
Draft RFP, Section H
Failure to perform in accordance with PWS Section 1, Chapter 1, para 1.2.7 will result in the Government removing 2% from the total invoiceable amount of the Operations, Maintenance, and Support Services (OM&S) Contract Line Item Number (CLIN). The Minimum Quantitative Requirement for the Small Business Participation Commitment Document, calculated on the OM&S CLIN value, will not be affected by any adjustment under this section
The 2% removal will occur each month for each vacancy not filled after 60 days. Each month will be calculated based on the total awarded value and will not change based on the new value and funded amount of the OM&S CLIN
Staffing matrices incorporated into the contract
Qualified, certified personnel crucial to mission success 60-day vacancy limitation before implementation 2% decrement from the total invoiceable amount of the
OM&S CLIN
Examples provided for reference in Section H
Section J
The following items are anticipated to be included in the contract award as attachments in Section J:
Performance Work Statement
Draft DD 254
Relevant CBA
Approved OCI Mitigation Plan (if applicable)
Subcontracting Plan
Government Furnished Property
Contractor’s Proposal – all, some, or none IAW RFP
• Technical Proposal
• Volume 1 Matrices
Section J
The following items are anticipated to be included in the contract AFTER AWARD as attachments in Section J:
Knowledge Management and Retention Plan (NLT 60 days after date of award)
Continuation of Operations / Mission Essential Service Plan (NLT 30 calendar days prior to contract start) Deliverable is due NLT 30 calendar days prior to contract start.
Contract start date is defined as the base period start date of 1
May 2023
VS21
DC50
Slide 26
VS21 Recommend we are more descriptive about the submission date for Cont of Operations/Mission Essential Service Plan. Perhaps you can say...
Continuation of Operations / Mission Essential Service Plan
- Deliverable is due NLT 30 calendar days prior to contract start.
- Contract start date is defined as the base period start date of 1 May 2023.
VANDINE, STEPHANIE M NH-04 USSF SPOC SAM-D/PKG, 9/14/2021
DC50 Lisa - let's confirm PWS language and discuss?
DIANA CRAMER, 9/14/2021
Anticipated Contract Line Items (CLINs) Structure Firm Fixed Price (FFP) CLINs:
All non-personal services and parts necessary in performance of PWS requirements that are foreseeable and can be forecasted Operations, Maintenance and Support Services MILSTAR / FAB-T Services Environmental and Pollution Prevention Services Knowledge Management and Retention
Requirements shall be covered in the fixed price even if the contractor chooses to subcontract to a certified company to perform the work
Consumables (i.e., office supplies, paper, toner, etc.) and parts, supplies and materials needed for normal maintenance and in performance of day-to-day contract requirements are to be included in the fixed price and will not be reimbursed by the Government
Anticipated CLIN Structure (cont.)
FFP CLINs
The contractor shall cover the following costs:
Collective bargaining agreement (CBA) or Subcontracting agreements Other agreement (such as employee incentives, meal costs) and Unofficial travel expenses as agreed to between the contractor and the contractor’s employees or between the contractor and their subcontractors
The Government will not reimburse these costs
Cost Reimbursable (CR) CLINs (allowable & allocable costs):
Government-approved equipment, materials, supplies which are not foreseeable and cannot be forecasted Government-approved TDY and non-local travel
Parts not part of preventive or forecasted maintenance. (i.e., not obtainable through Supply)
Environmental and Pollution Prevention Costs Fuel costs Labor hours resulting from Government-approved minor labor surges G&A is allowable on CR CLIN purchases if applicable; however, neither profit nor fee shall be allowed
Anticipated CLIN Structure (cont.):
Phase-In Services – one CLIN Contractor shall provide all personnel, supervision, transportation, items and services necessary to perform phase-in services in accordance with the PARCS PWS, Chapter 12, “Contract Transition”
Excluded are items, equipment, and services specified in the PWS as Government Furnished Property or Services
Cost Reimbursable CLIN – allowable and allocable costs
Individual Job Order (IJO):
Work which is not specifically identified in the PWS, but which is still within the general scope
IJO CLIN type to be determined by the CO on a case-by-case basis, dependent on the nature of the work
Contractor shall develop initial technical and cost proposals for Government review and approval at the request of the CO Contractor shall perform planning, development, and distribution of plans and specifications, installation instructions, bills of materials, drawings and inspection to complete the job at the work location
Anticipated CLIN Structure - IJOs The contractor will provide all necessary management for IJOs to include technical management, logistics support and services, administrative support and services, and similar requirements
IJOs may include, but are not limited to, minor construction or large supply purchases
IJOs shall be negotiated by the CO prior to any action Work shall commence only after a bilateral modification is finalized and signed
LUNCH BREAK
1100 - 1300
PAR Tour
Maj Justin Jones/Mr. Scott Holmquist/ Mr. Brian Hornbaker
PARCS Pre-Proposal Conference Day 2 - 0800
PARCS Preproposal Conference Day 2 Agenda
0800 – 1100 Review Ground Rules Request for Proposal Information Review Request for Proposal Acquisition Schedule
Lunch 1100 – 1300
1300 – Close of Day Civil Engineering: Walking/Driving Installation Tour Collect Questions
No Recording / Limited photography
Turn off cell phone ringers
Nothing stated in the Industry Day/Pre-performance Conference is contractually binding
The Government will post the following on SAM.gov:
Attendance roster, to facilitate subcontracting opportunities Government briefing charts All questions and answers
All questions must be submitted in writing to the Contracting Officer no later than Tuesday, 5 October 2021
Any proprietary information sent with questions needs to be identified by the Contractor, so the Government does not inadvertently record and post such information to SAM.gov
There will be no side-bar meetings or discussions with any Government personnel
The Government will not comment on another acquisition or associated requirements (for example, SPO Reacq)
No agreements, promises, or other commitments are made or implied by the Government or Contractors participating in Industry Day/Preproposal Conference
Any costs incurred by your company prior to receipt of a contract signed by the CO is at your own risk
The Government may, or may not, incorporate changes to the solicitation or requirements based on feedback received
All Government direction or changes will be communicated in writing by the CO through SAM.gov
CHARACTERIZATION SYSTEM
(PARCS)
Program Manager:
Lisa Markel, SAM-D/PMG
Contracting Officer:
Diana Cramer, SAM-D/PKG
Source Selection Information Request for Proposal
Projected Source Selection Information
PARCS Draft RFP – FA2517-21-R-0024 Note: The final RFP will be released under a new number for FY22 New number will be linked to the draft RFP number
Evaluation Factor Information RFP, Sections L & M
Potential Organizational Conflicts of Interest FAR Part 9.5 and AFFARS clause 5352.209-9001 Potential for Organizational Conflict of Interest (Oct 2019)
Submission of Proposals (PIEE)
RFP, Section L The Government anticipates conducting the Source
Selection as a Technical Price Tradeoff (TPT) Technical proposals will be evaluated and assigned combined technical/risk ratings to reflect the extent to which the proposal meets the Government’s performance and capability requirements, considering any strengths, risks, weaknesses, and deficiencies associated with the proposed approach
The Government may award to a higher-priced offeror if the Source Selection Authority determines the superior technical approach outweighs the price difference
Some, all, or none of the winning offeror’s proposal, including technical approach, the Small Business Participation Commitment Document, and approved OCI mitigation plan, if required, will be incorporated into the contract as an attachment in Section J
Projected Source Selection Information
VS11
DC51
Slide 41
VS11 and approved OCI mitigation plan (if applicable)
VANDINE, STEPHANIE M NH-04 USSF SPOC SAM-D/PKG, 9/10/2021
DC51 concur
DIANA CRAMER, 9/16/2021
Projected Source Selection Criteria RFP Section L
Anticipated evaluation criteria to be based on three factors:
TECHNICAL (FACTOR 1) Consists of five subfactors; all equally weighted
Program Management
Key Position Management
Knowledge Management and Retention
Mission System Maintenance
Civil Engineering Maintenance
SUBCONTRACTING COMMITMENT (FACTOR 2)
Evaluated on an Acceptable or Unacceptable basis
PRICE (FACTOR 3)
Evaluated for reasonableness and balance Non-priced factors are significantly more important than price
RFP Section M
TECHNICAL FACTOR 1 will be rated at the Subfactor level;
an overall rating for Factor 1 will not be given
Each Technical Subfactor will be given a combined Technical/Risk rating IAW DoD Source Selection Procedures as follows:
IS1
DC52
Slide 43
IS1 How do you plan on trading over price if you don't assign an overall rating?
ILLINGWORTH, KATHERINE A GS-13 USSF SPOC 21 SW/JA, 9/15/2021
DC52 We would provide narrative IAW SS Procedures to support a trade over price. Rating at the subfactor level provides a more granular view of strengths.
The MQR is a requirement – not a goal
Small Business, Section L
SMALL BUSINESS COMMITMENT (FACTOR 2)
Section L, Proposal Instructions. Volume 2
Submit a “Small Business Participation Commitment Document”
Minimum Quantitative Requirement (MQR) of 15% - 30% of Total Contract Value (TCV)
Calculation Base period calculation = XX% of the cost of the Base period Option year 1 = XX% of the cost of the base period + XX% of the cost of option year 1, etc.
Subsequent modifications driven by IJOs will not affect the MQR calculation. Other adjustments may impact the MQR
Acceptable Proposal meets the requirements of the solicitation Unacceptable Proposal does not meet the requirements of the solicitation
Ratings for Factors (2-Rating Description)
Projected Source Selection Criteria Small Business, Section M
SMALL BUSINESS COMMITMENT (FACTOR 2), cont.
Section M, Evaluation Factors, Factor 2 Factor will be rated acceptable or unacceptable Small Business Commitment Document must include
Minimum Quantitative Requirement (MQR) of [15-30]% of Total Contract Value (TCV)
Signed small business teaming agreement(s)
Price: Sections L and M
PRICE (FACTOR 3)
Section L, Proposal Instructions, Volume 2
Price information All Periods of Performance
All Fixed Price Contract Line Item Numbers
Section M, Evaluation Factors, Factor 2 Price Reasonableness
Balanced Pricing
Total Evaluated Price (TEP) Calculation Includes Fixed Price CLINs for the Base and all option periods
Does NOT include Phase In, Termination, or Cost CLINs
What about Past Performance?
Past performance will not be included as separate evaluation criteria
Past Performance will be included as part of the responsibility determination
Organizational Conflicts of Interest
An Organizational Conflict of Interest (OCI) means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage
No OCI are currently known or anticipated – subject to change
Offerors must self-identify any potential organizational conflicts of interest and submit all information required by AFFARS clause 5352.209-9001 “Potential for Organizational Conflict of Interest (Oct 2019)”
If the offeror does not have any OCI related to PARCS, submit a letter stating so
OCI Mitigation Plan may be required The organizational conflict of interest provision included in this solicitation may be modified or deleted during negotiations
The Contracting Officer reserves the right to discuss a potential or actual OCI with any offeror at any time.
Such discussions do not constitute “discussions” as that term is defined in FAR Part 15.
The organizational conflict of interest provision included in this solicitation may be modified or deleted during negotiations
Submission of Proposals Follow instructions for submission in Section L – Instructions to
Offerors and Section M, Evaluation of Offers Section L, Table 1 – Proposal Organization
Page limitation does not apply to Attachment 2 – PARCS Staffing Matrix, Attachment 3 – Crew Schedule, the proposal Table of Contents or any Glossaries
VOLUME TITLE PAGE LIMIT
NUMBER OF ELECTRONIC
COPIES
1 PARCS Technical 40* 1 MS Office
1 PDF
Small Business Participation
Commitment Document Unlimited
1 MS Office
1 PDF
3 Price Unlimited 1 MS Office
1 PDF
4 Contract Documents Unlimited 1 MS Office
1 PDF
Submission of Proposals (cont.)
IAW RFP Section M, Volume One pages in excess of 40 will be removed and will not be considered in the evaluation of the proposal
Volume 4 – Contract Documents List Documents will be submitted electronically (only) either through DoD SAFE or through the “Solicitation” function on Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/
Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award
IS2
DC53
Slide 52
IS2 Does this mean you'll remove excess pages from the back of the proposal that exceed 40 pages? You may want to clarify in the RFP language.
ILLINGWORTH, KATHERINE A GS-13 USSF SPOC 21 SW/JA, 9/15/2021
DC53 Yes, the excess pages will be removed prior to technical evaluation. We will edit in the final RFP to ensure that's clear.
Anticipated Acquisition Schedule*
RFP Release 7 January 2022
Receipt of Proposals from Industry 28 February 2022
Anticipated Contract Award 30 January 2023
Contract Phase In 1 March 2023 – 30 April 2023
Contract Performance Start 1 May 2023
*Any changes to these dates will be communicated as needed
LUNCH BREAK
1100 - 1300
Cavalier SFS Installation Tour
Maj Justin Jones/Mr. Scott Holmquist/ Mr. Brian Hornbaker
Housing for contractor personnel is not included under this contract
Healthcare is not available on site
Food service is not currently available on site
Food service support is not a requirement this contract
Clearly designate cross-utilized personnel.
Staffing matrix and crew schedule spreadsheets will be provided with the Final RFP and are mandatory use
Signed Teaming Agreements will be required with proposals
Knowledge Management and Retention Plan within 60 days of award and annually thereafter by 1 Nov
Continuation of Operations / Mission Essential Service Plan Deliverable is due NLT 30 calendar days prior to contract start Contract start date is defined as the base period start date of 1
May 2023
OCI Mitigation Plan, if required, will be incorporated into the contract as an attachment in Section J
Government intends to incorporate all, some or none of the Offeror’s technical approach (PARCS Technical) and the Small Business Participation Commitment Document into the contract itself, PWS, or as an attachment in Section J
VS22
Slide 57
VS22 Recommend we are more descriptive about the submission date for Cont of Operations/Mission Essential Service Plan. Perhaps you can say...
Continuation of Operations / Mission Essential Service Plan
- Deliverable is due NLT 30 calendar days prior to contract start.
- Contract start date is defined as the base period start date of 1 May 2023.
VANDINE, STEPHANIE M NH-04 USSF SPOC SAM-D/PKG, 9/14/2021
QUESTIONS
Any questions that result from this Conference not previously submitted are due in writing NLT 0800 Mountain Time, Tuesday, 05 October 2021 to:
Diana Cramer, Contracting Officer, diana.cramer.1@spaceforce.mil
***No phone calls will be accepted in lieu of a written submission***
Thank you!