OCI Memo to Interested Parties.docx

DOCX document 16 KB Posted

Attached to
Perimeter Acquisition Radar Attack Characterization System (PARCS) Operations, Maintenance, and Support (OM&S) Services Federal contract opportunity
Solicitation number
FA2518-21-R-0024
Issued by
Department of the Air Force Space Command

About this file

This memorandum from a contracting officer addresses potential organizational conflicts of interest regarding the Perimeter Acquisition Radar Attack Characterization System (PARCS) solicitation and the Sustainment and Modification of Radar Sensors contract. Interested offerors are required to provide organizational conflict of interest mitigation plans to the contracting officer by January 2022 if a potential conflict exists, or a letter stating no conflict if applicable. The PARCS solicitation seeks proposals for operations, maintenance, and support services for the PARCS located at Cavalier Space Force Station, North Dakota. Services include radar and mission computer maintenance, civil engineering, environmental functions, security, logistics, and sensitive/non-sensitive communications on a continuous 24/7 basis. Support is also required for system upgrades and modifications.

View the file

Other files for this federal contract opportunity

Other files attached to Perimeter Acquisition Radar Attack Characterization System (PARCS) Operations, Maintenance, and Support (OM&S) Services, newest first.
File Type Posted
DRAFT Attach 1 PARCS PWS.pdf PDF
DRAFT Attach 2 PARCS Staffing Matrix.xlsx XLSX spreadsheet
DRAFT RFP PARCS FA251822R0001.pdf PDF
DRAFT Attach 3 PARCS Crew Schedule Format .xlsx XLSX spreadsheet
DRAFT Attach 4 PARCS CLIN Schedule Worksheet.xlsx XLSX spreadsheet
PARCS 2023 Synopsis_16Nov2021.docx DOCX document
10SWS Mission Brief.pdf PDF
PARCS Site Visit Brief.pdf PDF
PARCS Site Visit Attendees.pdf PDF
DRAFT RFP Questions and Answers Sheet.xlsx XLSX spreadsheet
FA2517-21-R-0024 PARCS Notice of Site Visit.pdf PDF
PARCS Site Visit Agenda.docx DOCX document
Attach 2 PARCS Staffing Matrix.xlsx XLSX spreadsheet
Attach 4 PARCS CLIN Schedule Worksheet.xlsx XLSX spreadsheet
FA2518-21-R-0024 PARCS Draft RFP.docx DOCX document
Attach 1 PARCS PWS 31 Jul 21.docx DOCX document
Attach 5 PARCS DRAFT DD0254.pdf PDF
Attach 5a PARCS DRAFT DD254 Continutation Sheet.docx DOCX document
Attach 6 PARCS Bidders Library Instructions.pdf PDF
Attach 7 PARCS Questions and Answers Sheet.xlsx XLSX spreadsheet
Attach 3 PARCS Crew Schedule Format .xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR: Interested Parties

REQUEST FOR INFORMATION

Date: 17 November 2021 SUBJECT: Perimeter Acquisition Radar Attack Characterization System (PARCS) Solicitation # FA251822R0001. Organizational Conflicts of Interest (OCI) Considerations

1. The Contracting Officer, in accordance with (IAW) FAR Part 9.5, is required to consider actual or potential OCI as early as possible within the timeline associated with an acquisition.

2. The Contracting Officer, using the general rules provided in FAR 9.504, is required to analyze planned acquisitions to identify and evaluate potential OCIs as early in the acquisition process as possible and avoid, neutralize or mitigate significant potential organizational conflict of interest before contract award.

3. IAW FAR 9.505, each individual contracting situation should be examined on the basis of its particular facts and the nature of the proposed contract. The two underlying principles for any determinations are:

a. Preventing the existence of conflicting roles that might bias the contractor’s judgement

b. Preventing unfair competitive advantage.

4. FAR 9.508 provides some examples which might serve to illustrate situations in which questions regarding organizational conflict of interest may exist. They are not all encompassing, but should allow Industry to extrapolate from the examples and determine if any potential OCIs apply to their real world conditions.

5. The Contracting Officer has identified potential for organizational conflict(s) of interest with the Sustainment and Modification of Radar Sensors (SMORS) contract, FA872318D0001, including any subsequent related contract. The PARCS contractor will be responsible for testing or providing technical evaluations of products delivered from the SMORS program.

6. Based on this information, it is imperative that Industry provide OCI Mitigation Plans to the Contracting Officer to address any potential conflict. If there is no OCI, a letter/email should be submitted to the Contracting Officer stating that fact. The Mitigation Plan should be submitted as soon as possible and, if submitting a letter/email stating there is no OCI, please do so prior to the posting of the Request for Proposals in January 2022.

Any information or questions regarding this topic should be submitted to the Contracting Officer, Diana Cramer, at diana.cramer.1@spaceforce.com.

File details come from the government source that posted it. Updated .