Attachment_2b_-_Buckley_AFB_IFS_Pre-Final.pdf
PDF 5 MB Posted
- Attached to
- Front Range Multiple Award Construction Contract (FRMACC) Federal contract opportunity
- Solicitation number
- FA251719RA016
About this file
This notice provides updated information regarding the Front Range Multiple Award Construction Contract (FRMACC) solicitation. The solicitation involves construction services for multiple Air Force bases located along Colorado's Front Range. Interested parties are directed to monitor the beta version of SAM.gov beginning November 12, 2019 for any changes or updates to the solicitation, as the FedBizOpps site will be retired on that date. The notice encourages parties to use the Federal Service Desk for assistance with the new SAM.gov platform if issues arise.
Attachment 2b - Buckley AFB Installation Facilities Standards (IFS)
View the file
Other files for this federal contract opportunity
Show all 50
Front Range Multiple Award Construction Contract (FRMACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buckley Air Force Base IFS
23 AUGUST 2018
(PRE-FINAL)
BUCKLEY AIR FORCE BASE
INSTALLATION FACILITIES STANDARDS (IFS)
Installation Elements
Size image to:
170 pixels width x 170 pixels height
Click here to insert image
Site Development
Size image to:
170 pixels width x 170 pixels height
Click here to insert image
Facilities Exteriors
Size image to:
170 pixels width x 170 pixels height
Click here to insert image
Facilities Interiors
Size image to:
170 pixels width x 170 pixels height
Click here to insert image
Installation Elements Site Development Facilities Exteriors Facilities Interiors
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
Signature Field
DRAFT
AIR FORCE
INSTALLATION
FACILITIES
STANDARDS
Buckley Air Force Base IFS
Table of Contents
A. OVERVIEW
A01. Facility Hierarchy
A02. Facility Quality
A03. Facility Districts
B. INSTALLATION ELEMENTS
B01. Comprehensive Planning
B01.1. Installation Development Plan (IDP) B01.1.1. IFS Component Plan of IDP B01.1.2. Brief History of Base B01.1.3. Future Development
B02. Street Envelope Standards
B02.1. Hierarchy of Streets B02.1.1. Arterial Streets B02.1.2. Collector Streets B02.1.3. Local Streets B02.1.4. Special Routes
B02.2. Hierarchy of Intersections B02.2.1. Arterials B02.2.2. Arterial/Collector B02.2.3. Collectors B02.2.4. Special Intersections B02.2.5. Street Frontage Requirements B02.2.6. Sight Lines
B02.3. Street Elements B02.3.1. Paving B02.3.2. Curb and Gutter B02.3.3. Utility Service Elements B02.3.4. Traffic Signs B02.3.5. Street Lighting B02.3.6. Other
B03. Open Space / Public Space
B03.1. Plazas, Monuments and Static Displays
B03.1.1. Paved Plazas B03.1.2. Sculptures, Markers and Statuary B03.1.3. Static Display of Aircraft
B03.2. Grounds and Perimeters
B03.2.1. Parade Grounds B03.2.2. Parks
B03.2.3. Preserves B03.2.4. Perimeter Fence
C. SITE DEVELOPMENT
C01. Site Design
C01.1. Site Design Considerations
C01.2. Building Orientation
C02. Utilities
C02.1. Utility Components
C03. Parking Areas
C03.1. Configurations and Design C03.1.1. Paving and Striping C03.1.2. Curbing C03.1.3. Internal Islands and Medians
C03.2. Parking Structures
C03.3. Connectivity
C04. Stormwater Management
C04.1. Stormwater Requirements
C05. Sidewalks, Bikeways and Trails
C05.1. Circulation and Paving C05.1.1. Ramps and Stairs C05.1.2. Lighting
C06. Landscape
C06.1. Climate-based Materials C06.1.1. Landscape Design Concept C06.1.2. Xeriscape Design Principles C06.1.3. Minimizing Water Requirements C06.1.4. Plant Material Selection C06.1.5. Water Budgeting (Hydrozones) C06.1.6. Base Entrance Landscaping C06.1.7. Streetscape Landscaping C06.1.8. Pedestrian Circulation Landscaping C06.1.9. Parking Lot Landscaping C06.1.10. Screen/Accent Landscaping C06.1.11. Other
C07. Site Furnishings
C07.1. Furnishings and Elements
Table of contents continued on next page
Table of contents continued
C07.2. Site Furnishings Products, Materials / Color .. 71
C07.2.1. Barbeque Grills C07.2.2. Benches C07.2.3. Bike Racks C07.2.4. Bike Lockers C07.2.5. Bollards C07.2.6. Bus Shelters C07.2.7. Drinking Fountains C07.2.8. Dumpster Enclosures / Gates C07.2.9. Fencing C07.2.10. Flagpoles C07.2.11. Lighting – Landscape / Accent C07.2.12. Litter and Ash Receptacles C07.2.13. Picnic Tables C07.2.14. Planters – Free Standing C07.2.15. Play Equipment C07.2.16. Screen Walls C07.2.17. Tree Grates C07.2.18. Other
C08. Exterior Signs
C08.1. Colors and Types C08.1.1. Materials and Color Specifications C08.1.2. Installation and Gate Identification Signs C08.1.3. Building Identification Signs C08.1.4. Traffic Control Devices (Street Signs) C08.1.5. Directional and Wayfinding Signs C08.1.6. Informational Signs C08.1.7. Motivational Signs C08.1.8. Parking Lot Signs C08.1.9. Regulatory Signs C08.1.10. Other
C09. Lighting
C09.1. Fixtures and Lamping
C09.2. Light Fixture Types
C09.2.1. Street Lighting C09.2.2. Parking Lot Lighting C09.2.3. Lighted Bollards C09.2.4. Sidewalk Lighting C09.2.5. Walls / Stairs Lighting C09.2.6. Other
D. FACILITIES EXTERIORS
D01. Supporting the Mission
D02. Sustainability
D03. Architectural Features
D03.1. Orientation, Massing and Scale
D03.2. Architectural Character
D03.3. Details and Color D03.3.1. Climate-based Data D03.3.2. Natural Ventilation System D03.3.3. Thermal Mass
D03.3.4. Thermal Shading D03.3.5. Renewable Heating/Cooling D03.3.6. Solar Photovoltaic System D03.3.7. Solar Thermal System
D04. Building Entrances
D04.1. Primary Entrances
D04.2. Secondary Entrances
D05. Wall Systems
D05.1. Hierarchy of Materials
D05.2. Layout, Organization and Durability
D05.3. Equipment, Vents and Devices
D05.4 Wall Systems Materials
D05.4.1. Flat Metal Panels D05.4.2. Brick Veneer D05.4.3. Architectural Precast D05.4.4. Stucco Over Sheathing D05.4.5. Curtain Wall D05.4.6. Cast-in Place Concrete D05.4.7. Tilt-up Concrete D05.4.8. Ribbed Metal Sheeting
D05.4.9. EFIS
D05.4.10.GRFC
D05.4.11.Concrete Block D05.4.12. Fiber Cement Siding D05.4.13. Other
D06. Doors and Windows
D06.1. Types
D06.2. Layout and Geometry
D06.3. Glazing and Shading
D06.4. Hardware
D06.5. Doors and Windows Materials D06.5.1. Anodized Aluminum D06.5.2. Hollow Metal D06.5.3. Aluminum-clad Wood D06.5.4. Other
D07. Roof Systems
D07.1. Roof Type and Form
D07.2. Roof Slope
D07.3. Parapets and Copings
D07.4. Color and Reflectivity
D07.5. Gutters, Downspouts, Scuppers, Drains
D07.6. Roof Vents and Elements
D07.7. Clerestories and Skylights
D07.8. Vegetated Roof
Table of contents continued on next page
Table of contents continued
E. FACILITIES INTERIORS
E01. Building Configurations
E01.1. Layout and Common Areas
E01.1.1. Interior Design Process E01.1.2. Codes and Regulations
E01.2. Quality and Comfort
E02. Floors
E02.1. Floor Materials
E02.1.1. Prepared Slabs E02.1.2. Natural Stone and Terrazzo E02.1.3. Quarry Tile E02.1.4. Ceramic Tile E02.1.5. Resilient Floor E02.1.6. Carpet E02.1.7. Rapidly-Renewable Products E02.1.8. Other
E03. Walls
E03.1. Wall Materials E03.1.1. Concrete E03.1.2. Masonry E03.1.3. Ceramic Tile E03.1.4. Gypsum Board E03.1.5. Metal Panels E03.1.6. Wood Paneling E03.1.7. Rapidly-Renewable Products E03.1.8. Other
E04. Ceilings
E04.1. Ceiling Materials
E04.1.1. Exposed Framing (Roof / Floor Structure Above) E04.1.2. Exposed Concrete E04.1.3. Grid and Acoustical Tile E04.1.4. Gypsum Board E04.1.5. Metal Panels E04.1.6. Wood E04.1.7. Rapidly-Renewable Products E04.1.8. Other
E05. Doors and Windows
E05.1. Doors and Windows and Frames Materials E05.1.1. Aluminum E05.1.2. Hollow Metal E05.1.3. Wood E05.1.4. Other
E06. Casework Systems
E06.1. Casework Materials E06.1.1. Plastic Laminate E06.1.2. Solid Polymer Surface E06.1.3. Rapidly-Renewable Products E06.1.4. Metal
E06.2. Countertop Materials E06.2.1. Plastic Laminate E06.2.2. Solid Polymer Surface E06.2.3. Natural Stone E06.2.4. Cast Stone E06.2.5. Metal
E07. Furnishings
E07.1. Durability and Serviceability
E07.2. Accessories
E08. Interior Signs
E08.1 Types and Color
E08.2. Interior Signs Materials
E09. Lighting, Power and Communication
E09.1. Functionality and Efficiency
F. Appendices
D08. Structural Systems
D08.1. Systems and Layouts
D08.2. Structural Systems Materials D08.2.1. Concrete D08.2.2. Insulated Concrete Forming (ICF) D08.2.3. Steel D08.2.4. Pre-Engineered Steel D08.2.5. Masonry D08.2.6. Heavy Timber D08.2.7. Light-gauge Steel D08.2.8. Lumber Framing D08.2.9. Other
D09. Mechanical, Electrical and Plumbing
D09.1. Passive and Active Systems
D09.2. Functionality and Efficiency
D07.9.1. Standing Seam Metal D07.9.2. Membrane Single-ply D07.9.3. Built-up Multi-ply D07.9.4. Concrete Tile D07.9.5. Clay Tile D07.9.6. Slate Shingles D07.9.7. Vegetated System D07.9.8. Ribbed Metal Sheeting D07.9.9. Composite Shingles D07.9.10. Other
D07.9. Roof Systems Materials
E09.2. Types and Color
Page 5 of 158Buckley Air Force Base IFS
A. OVERVIEW
Comply with Air Force Corporate Standards for Overview:
http://afcfs.wbdg.org/index.html
1. Conformance to Air Force Corporate Facilities Standards (AFCFS) and Installation Facilities Standards (IFS) are required by Air Force Instruction (AFI) 32-1023 and Air Force Memorandum. Please refer to the AFCFS website for links to documentation on current policy.
2. The IFS is a component plan of the Installation Development Plan (IDP) per Air Force Instruction (AFI) 32-7062 (replacing the Architectural Compatibility Plan). All military construction projects and Non-Appropriated Funds (NAF) facilities are required to comply with the IDP and its IFS component plan by AFI 32-1023. The Base Civil Engineer (BCE) maintains and implements the IDP and its component plans, to include the IFS.
3. Please refer to the AFCFS website as a portal to reference materials and requirements documents for design and construction projects (via links). Specific references to current DOD memoranda and Air Force criteria are updated periodically to provide the most current guidance and requirements. Programming, design and contract documents should list “current edition” for all reference and requirements documents. The documents in force at the date of execution of the design and/or construction contract shall be the governing version.
4. Joint Bases shall implement IFS under their Joint-Base designation with volume numbers for individual installations following the IFS Development Tool template. For example, for Joint Base Langley-Eustis, provide: Vol. 1 Langley AFB and Vol. 2 Fort Eustis.
A.01. FACILITY HIERARCHY
Comply with AF Corporate Standards for Facility Hierarchy (and subsections):
http://afcfs.wbdg.org/facility-hierarchy/index.html
A.02. FACILITY QUALITY
Comply with AF Corporate Standards for Facility Quality (and subsections):
http://afcfs.wbdg.org/facility-quality/index.html
A.03. FACILITY DISTRICTS
Comply with AF Corporate Standards for Facility Districts (and subsections):
http://afcfs.wbdg.org/facility-districts/index.html
Page 6 of 158Buckley Air Force Base IFS
Note: Apply the base-wide standards in this IFS for Installation Elements, Site Development, Facilities Exteriors and Facilities Interiors (products, materials, color, etc.). Following application of the base-wide standards, refer to the Appendix and apply any additional requirements specifically related to the Facility District.
Insert Base Map with districts indicated.
Size image to:
800 pixels width x 800 pixels height
Click here to insert image
(jpg or png format)
Overview Map:Buckley Air Force Base IFS
Page 7 of 158Buckley Air Force Base IFS
B. INSTALLATION ELEMENTS
Comply with Air Force Corporate Standards for Installation Elements:
http://afcfs.wbdg.org/installation-elements/index.html
B.01. COMPREHENSIVE PLANNING
Comply with Air Force Corporate Standards for Comprehensive Planning:
http://afcfs.wbdg.org/installation-elements/comprehensive-planning/index.html
B01.1. Installation Development Plan (IDP)
Applicable N/A Has large graphics to include (800px x 440px)
Select number of graphics / images (large: 800 px x 440 px) to insert 2
Applicable N/A Has small graphics to include (250px x 188px)
Select number of graphics / images (small: 250 px x 188 px) to insert 1
Insert IDP graphic
800 pixels width x 440 pixels in height
Department of Defense, Department of the Air Force and Air Force Base Criteria
Page 8 of 158Buckley Air Force Base IFS
250 pixels width x 188 pixels height
1. The Base Civil Engineer is responsible for developing, maintaining and implementing the installation's Comprehensive Planning documents and to ensure that the Installation Development Plan (IDP) is prepared, maintained, and implemented following AFI 32-7062.
2. The Regulating Plan is the controlling document and principal tool for implementing the study area form-based code. It identifies the Building Envelope Standard for each building site and any specific characteristics assigned to it.
The notes and definitions below serve as a reference to explain the elements of the Regulating Plan:
3. Specific Notes on Regulating Plan:
a. Unless otherwise noted, all buildings shall maintain a width of 50' or less to maximize natural light.
b. Undeveloped lots shall not be developed into parking areas unless specifically noted as a parking area on the regulating plan. As a rule, all parking, unless otherwise designated on the plan, shall be located to the sides or to the rear of buildings.
c. Existing buildings that are not slated for demolition are not required to meet the guidelines of the Regulating Plan. Only buildings constructed on redeveloped lots must meet the requirements. If a design team wishes to deviate from the Regulating and Transportation Plans, they must follow the variance established by the installation.
d. Definitions:
i. Required Entry Zone: A blue dashed line indicating a facade that must include a building entry.
Page 9 of 158Buckley Air Force Base IFS
ii. Required Entry Location: A blue circle indicating a location where a building entry is required.
iii. Required Build-to Line: A thick black line where a percentage of the building façade must be located (see Building Envelope Standards for specific percentages).
iv. Min/Max Building Height: Two numbers indicating the minimum and maximum number of levels a building may have within the coordinating building area boundary.
v. Building Area Boundary: A highlighted area showing the maximum extent of buildable area on a parcel.
This refers to the colored parcel on the map.
vi. Parking Zone: A red dashed line indicating the maximum allowable area to be used for parking.
B01.1.1. IFS Component Plan of IDP
Applicable N/A Has large graphics to include (800px x 440px)
Select number of graphics / images (large: 800 px x 440 px) to insert 4
Applicable N/A Has small graphics to include (250px x 188px)
Insert IFS Component Plan graphic
Aspen ADP
Page 10 of 158Buckley Air Force Base IFS
West End ADP
North Corner ADP
Page 11 of 158Buckley Air Force Base IFS
Aviation Ridge ADP
B01.1.2. Brief History of Base
Applicable N/A Has large graphics to include (800px x 440px)
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Select number of graphics / images (small: 250 px x 188 px) to insert 3DRAFT
Page 12 of 158Buckley Air Force Base IFS
Insert History of Base graphic
The increased involvement of the United States in the war in 1941 resulted in plans to enlarge Lowry Army Air Field in the Denver area. A 5,740-acre site was selected and eventually purchased by the City and County of Denver and donated to the War Department in early 1941 to satisfy the growing need for military strength. That property became known as Buckley Field.
The base is named after 1st Lt. John Harold Buckley, a World War I flier from Longmont, Colo. He was shot down on a strafing mission behind German lines during the Argonne offensive.
A contract for architectural and engineering services was awarded in April 1942 and construction of Buckley Field began the following month. The Army Air Corps Technical School, offering B-17 and B-24 bombardier and armor training, was opened July 1 with Brig. Gen. L.A. Lawson commanding.
At an original cost of $7.5 million, base facilities included streets, runways, more than 700 structures, 10 water wells, a water distribution system, a sewage collection and treatment system, electrical plant, communication system, coal-fired steam heating plant and 16,800 feet of railroad track.
The ever-present need for wartime military personnel required additional basic training sites. In 1943, three of these sites were opened at the Lowry Bombing Range under Buckley's command.
Page 13 of 158Buckley Air Force Base IFS
As the Army Air Corps approached full strength in 1944, the additional training requirements diminished, bringing about a gradual decline in personnel throughout 1945. When the war finally ended, Buckley became an auxiliary field for Lowry, which in turn, transferred it to the Colorado Air National Guard in 1946.
But the Air Guard's first-term ownership quickly came to an end when the Department of the Navy took charge in 1947, renaming the installation Naval Air Station-Denver.
Nearly 12 years later, the Navy decommissioned Denver's Naval Air Station on June 30, 1959, and returned the installation back to the Air Force, which licensed it to the state of Colorado.
On April 18, 1960, the installation took on a new, yet familiar name, Buckley Air National Guard Base, and became the first stand-alone Air National Guard base in the United States. For the next 40 years, the Air National Guard would maintain Buckley as an Air National Guard installation.
On Oct. 1, 2000, Buckley once again changed hands. This time it would be back to the U.S. Air Force as the 821st Space Group became the host unit and the Secretary of the Air Force renamed the facility Buckley Air Force Base.
Just a year later, the 460th Air Base Wing, 14th Air Force's (Air Force Space Command) newest wing, stood up and assumed host duties of the base, and three years later, in August 2004, the 460th Air Base Wing became the 460th Space Wing.
The name change came about as the 460th Air Base Wing assumed management responsibilities following the 821st Space Group's inactivation Sept. 30. With the new title also came an increase in manpower to provide host-base responsibilities and base operating support.
The 460th Air Base Wing was re-designated the 460th Space Wing on Aug. 19, 2004, and assumed operational responsibilities for the 2nd, 8th and 137th Space Warning Squadrons from the 21st Space Wing. Today, the 460th Space Wing is the focal point for the Air Force's space-based missile warning and communications missions.
However, through all the changes, the Colorado Air National Guard has continued to operate the most visible mission at the base, F-16 Fighting Falcon flight and training operations.
B01.1.3. Future Development
Applicable N/A Has large graphics to include (800px x 440px)
Applicable N/A Has small graphics to include (250px x 188px)
Future development will adhere to IDP regulating plan.
B02. STREET ENVELOPE STANDARDS
Comply with Air Force Corporate Standards for Installation Elements:
http://afcfs.wbdg.org/installation-elements/index.html
Comply with AF Corporate Standards for Street Envelope Standards:
http://afcfs.wbdg.org/installation-elements/street-envelope-standards/index.html
Page 14 of 158Buckley Air Force Base IFS
B02.1. Hierarchy of Streets
Applicable N/A Has large graphics to include (800px x 440px)
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Insert Hierarchy of Streets graphic
Street Network Plan
1. Develop and evolve a hierarchical transportation network of arterial, collector and local streets following UFC 3-201-01 and its industry references.
2. Provide consistent functionality throughout the installation and a level of visual quality relating to the adjacent Facility
Group number.
3. Routes along facilities in Group 1 may have materials, finishes and features with a higher visual quality than Groups 2, 3 and 4. Reduce maintenance requirements by installing highly durable materials and finishes in routes along Group 3 industrial facilities.
4. Special routes may have a visual quality comparable to those along facilities in Group 1.
5. Create and maintain arterials with two lanes of traffic in each direction with landscaped or paved medians as applicable to the local climate and adjacent facility group designation / land use.
6. Minimize stops and turns along arterials. Eliminate on-street parking along arterials and collector streets.
7. Connect arterials to local streets with appropriately scaled collector streets.
8. Provide appropriate landscape setbacks and pedestrian buffers along all streets.
Page 15 of 158Buckley Air Force Base IFS
9. Minimize and consolidate curb cuts along streets.
10. Ensure access for emergency and service vehicles.
11. Define bicycle traffic routes in the Installation Development Plan or its applicable component plans.
12. Provide illustrations in the Installation Facilities Standards (IFS) to include street cross-sections and plans for every type of street specified on the installation. At a minimum provide dimensions for vehicular traffic-lanes, curb radii, medians, bike lanes, pedestrian buffers, sidewalks, crosswalks, tree planting areas, and on-street parking configurations.
13. Define appropriate force protection features, site furnishings, signs, lighting, utilities, and paving in the IFS.
1. Develop and evolve a hierarchical transportation network of arterial, collector and local streets following UFC 3-201-01 and its industry references.
2. Provide consistent functionality throughout the installation and a level of visual quality relating to the adjacent Facility Group number.
3. Routes along facilities in Group 1 may have materials, finishes and features with a higher visual quality than Groups 2, 3 and 4. Reduce maintenance requirements by installing highly durable materials and finishes in routes along Group 3 industrial facilities.
4. Special routes may have a visual quality comparable to those along facilities in Group 1.
5. Create and maintain arterials with two lanes of traffic in each direction with landscaped or paved medians as applicable to the local climate and adjacent facility group designation / land use.
6. Minimize stops and turns along arterials. Eliminate on-street parking along arterials and collector streets.
7. Connect arterials to local streets with appropriately scaled collector streets.
8. Provide appropriate landscape setbacks and pedestrian buffers along all streets.
9. Minimize and consolidate curb cuts along streets.
10. Ensure access for emergency and service vehicles.
11. Define bicycle traffic routes in the Installation Development Plan or its applicable component plans.
12. Provide illustrations in the Installation Facilities Standards (IFS) to include street cross-sections and plans for every type of street specified on the installation. At a minimum provide dimensions for vehicular traffic-lanes, curb radii, medians, bike lanes, pedestrian buffers, sidewalks, crosswalks, tree planting areas, and on-street parking configurations.
13. Define appropriate force protection features, site furnishings, signs, lighting, utilities, and paving in the IFS.
B02.1.1. Arterial Streets
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Applicable N/A Has small graphics to include (250px x 188px)
Select number of graphics / images (small: 250 px x 188 px) to insert 1
Page 16 of 158Buckley Air Force Base IFS
Insert Arterial Streets graphic
Insert Arterial Streets graphic
Paved Median
1. Maintain the following with this designation as arterial streets: Aspen St. (Re: B02.1 graphic for location). Refer to the illustration for general dimensions that pertain to all base arterial streets.
2. The following specific requirements shall be incorporated into all arterial projects including roadway modifications/upgrades and associated building sites adjacent to the street.
Page 17 of 158Buckley Air Force Base IFS
Has large graphics to include (800px x 440px)
B02.1.2. Collector Streets
Applicable N/A
Select number of graphics / images (large: 800 px x 440 px) to insert 3
Insert Collector Streets graphic
Page 18 of 158Buckley Air Force Base IFS
1. Design collector streets less prominent than arterials.
Page 19 of 158Buckley Air Force Base IFS
2. Maintain the following as collector streets: portion of Telluride St., portion of Breckenridge Ave., portion of Steamboat Ave. (Re:
B02.1 graphic for location). Refer to the illustration for general dimensions that pertain to all base collector streets.
3. Match the level of quality of street elements to the adjacent Facility Group number.
1. Design collector streets less prominent than arterials.
2. Maintain the following as collector streets: portion of Telluride St., portion of Breckenridge Ave., portion of Steamboat Ave. (Re:
B02.1 graphic for location). Refer to the illustration for general dimensions that pertain to all base collector streets.
3. Match the level of quality of street elements to the adjacent Facility Group number.
Has large graphics to include (800px x 440px)
B02.1.3. Local Streets
Applicable N/A
Select number of graphics / images (large: 800 px x 440 px) to insert 4
Insert Local Streets graphic
(jpg or png format)DRAFT
Page 20 of 158Buckley Air Force Base IFS
Page 21 of 158Buckley Air Force Base IFS
1. Design and maintain local streets in due proportion to the amount of traffic.
2. Generally encourage the development of street frontage of adjacent sites to positively contribute features such as landscaping.
3. Maintain consistent local streetscapes for visual and functional continuity
B02.1.4. Special Routes
Has large graphics to include (800px x 440px)Applicable N/A
Select number of graphics / images (large: 800 px x 440 px) to insert 5
Applicable N/A Has small graphics to include (250px x 188px)DRAFT
Page 22 of 158Buckley Air Force Base IFS
Insert Special Routes graphic
Page 23 of 158Buckley Air Force Base IFS
Page 24 of 158Buckley Air Force Base IFS
1. Develop all special routes consistently with those adjacent to Group 1 facilities.
B02.2. Hierarchy of Intersections
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Page 25 of 158Buckley Air Force Base IFS
Insert Hierarchy of Intersections graphic
Typical Boulevard Intersection
1. Provide a hierarchy of intersections to include arterial, arterial-collector, collector, collector-local and local following UFC 3-201-01 and its industry references.
2. Passive systems such as traffic circles are preferred to active systems such as signalized intersections. Aggressively pursue passive systems to lower maintenance requirements and reduce energy use.
3. Use a level of visual quality for an intersection equal to the quality found in the related streetscape, which corresponds to the adjacent Facility Group number.
B02.2.1. Arterials
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Page 26 of 158Buckley Air Force Base IFS
Insert Arterials graphic
Typical Avenue Intersection
B02.2.2. Arterial/Collector
Applicable N/A Has large graphics to include (800px x 440px)
Page 27 of 158Buckley Air Force Base IFS
Insert Arterial/Collector graphic
Typical One- Way Traffic Circle
B02.2.3. Collectors
Applicable N/A Has large graphics to include (800px x 440px)
Select number of graphics / images (large: 800 px x 440 px) to insert 4
Page 28 of 158Buckley Air Force Base IFS
Insert Collectors graphic
Typical Street Intersection - Non- Residential
Typical Street Intersection- Residential
Page 29 of 158Buckley Air Force Base IFS
Page 30 of 158Buckley Air Force Base IFS
B02.2.4. Special Intersections
Applicable N/A Has large graphics to include (800px x 440px)
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Insert Special Intersections graphic
Typical One- Way Traffic Diamond
B02.2.5. Street Frontage Requirements
Applicable N/A Has large graphics to include (800px x 440px)
1. Consistently maintain open space buffers following B03.2.3. Preserves.
2. Refer to C06.1.7. Streetscape Landscaping for planting and screen wall requirements along street frontage.
Page 31 of 158Buckley Air Force Base IFS
B02.2.6. Sight Lines
Applicable N/A Has large graphics to include (800px x 440px)
Applicable N/A Has small graphics to include (250px x 188px)
1. Provide adequate sight lines for an effective and safe traffic operation per American Association of State Highway and Transportation Officials (AASHTO) standards and local municipality guidelines.
B02.3. Street Elements
Applicable N/A Has small graphics to include (250px x 188px)
1. Emulate the streetscape area's pre-development hydrology using passive and active design features to help sustain the adjacent regionally appropriate landscape. Coordinate with the base Stormwater Management Plan.
2. Employ systems, materials and techniques to maximize streetscape sustainability. Consider pervious paving and reflectivity of surfaces appropriate for the local climate.
3. Install at-grade curbing and/or raised-profile curb and gutter as applicable to direct stormwater to bioswales and rain gardens as source water for vegetation. Do not paint concrete curbing.
4. Provide all on-site utility service lines and equipment below grade when adjacent to Facility Group 1. In routes along Group
2, 3 and 4, when mounting elements such as utility cabinets, communications equipment and water valves above grade is unavoidable, paint these consistently and provide visual screening following Installation Facilities Standards (IFS).
5. Provide traffic control devices including access control point/entry control facility signs, speed limit signs and street name signs following the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) per UFC 3-120-01.
6. Follow UFC 3-120-01 for directional and wayfinding signs and address both vehicular and pedestrian traffic.
7. Reduce energy consumption and reduce maintenance requirements by providing street lighting only when functionally required to ensure safety and to address antiterrorism following UFC 4-010-01. Ensure the quality and quantities of lighting and fixtures are appropriate for the adjacent Facility Group number.
B02.3.1. Paving
Page 32 of 158Buckley Air Force Base IFS
1. Pavement design shall comply with UFC 3-250-01. Ensure appropriate analysis and design of subgrade conditions to support low maintenance high performance pavements. Apply best practices from the Construction: Seasonal Frost Conditions section of the UFC.
2. Materials for pavements shall be specified in accordance with UFC 3-250-01 and must conform to requirements set forth in the Unified Facility Guide Specifications (UFGS) for concrete and asphaltic concrete.
B02.3.2. Curb and Gutter
Applicable N/A Has large graphics to include (800px x 440px)
Applicable N/A Has small graphics to include (250px x 188px)
Select number of graphics / images (small: 250 px x 188 px) to insert 2
Insert Curb and Gutter graphic
Insert Curb and Gutter graphic
1. Continuous concrete curbs and gutters shall be provided at street edges areas of the installation to:
a. Help control drainage.
b. Deter vehicles from leaving the pavement.
c. Protect pedestrians.
d. Delineate the pavement edge.
e. Present a more finished general appearance.
f. Assist in orderly and disciplined development of the street system.
2. 2. Provide dimensions following the illustrations for Standard Mountable Curb, Standard Barrier Curb and Standard
Header Curb.
3. 3. Use the barrier curb design at arterial streets and at raised central medians. Use the mountable curb design at collector and local streets. Use the header curb design at locations where a permanent, finished edge is required, but where pavement drainage can flow onto adjacent areas such as bioswales and rain gardens.
B02.3.3. Utility Service Elements
Applicable N/A Has large graphics to include (800px x 440px)
Applicable N/A Has small graphics to include (250px x 188px)
1. Provide all utility service lines below grade when streets are adjacent to Facility Group 1; when mounting elements (such as utility cabinets, communications equipment and water valves) above grade is unavoidable, paint these consistently and provide visual screening following Site Development, Landscaping.
Page 33 of 158Buckley Air Force Base IFS
2. Overhead service lines along streets adjacent to Facility Groups 2, 3 and 4 are discouraged.
B02.3.4. Traffic Signs
Applicable N/A Has small graphics to include (250px x 188px)
1. Refer to Exterior Signs, Colors and Types for Traffic Control Devices, which includes signs.
B02.3.5. Street Lighting
Applicable N/A Has large graphics to include (800px x 440px)
1. Refer to the Lighting section for appropriate applications along streets.
B02.3.6. Other
Applicable N/A Has small graphics to include (250px x 188px)
B03. OPEN SPACE / PUBLIC SPACE
Comply with Air Force Corporate Standards for Installation Elements:
http://afcfs.wbdg.org/installation-elements/index.html
Comply with AF Corporate Standards for Open Space / Public Space:
http://afcfs.wbdg.org/installation-elements/open-space-public-space/index.html
B03.1. Plazas, Monuments and Static Displays
Applicable N/A Has large graphics to include (800px x 440px)
Page 34 of 158Buckley Air Force Base IFS
1. Natural features and culturally or historically significant features or events may be recognized and acknowledged with physical elements such as plazas, monuments and static displays. However, limit these elements on the base to ensure judicious use of resources and to reduce ongoing maintenance requirements.
2. Design highly durable plazas, monuments and static displays with a level of quality comparable to Facility Group 1.
3. Link plazas, monuments and static displays to the pedestrian circulation system. Install landscaping, site furnishings and lighting appropriate for the application and local climate following Installation Facilities Standards (IFS).
4. Select systems, products and materials for paving, walls, and structures following IFS.
B03.1.1. Paved Plazas
Applicable N/A Has small graphics to include (250px x 188px)
1. Mitigate heat island by providing high-albedo, shaded plazas. Pervious pavers shall be used on all plazas and courtyards in Facility Groups 1 and 2; use pervious concrete in Groups 3 and 4. The designer shall incorporate appropriate expansion and construction joints.
2. Pavers shall match the color of pavers used on adjacent sidewalks using base standard range of beiges, tans, browns, or terra cotta. Bricks used on plazas shall typically be 4” x 8” size.
B03.1.2. Sculptures, Markers and Statuary
Applicable N/A Has small graphics to include (250px x 188px)
1. Relate new sculpture, markers and statuary to the base's architectural design theme. Generally limit these elements to frequently used locations adjacent to Facility Group 1 and highly traveled community pedestrian spaces.
2. Consider entry gates as possible sites for new displays.
3. All proposed memorials shall follow AFI 36-3108 and be limited to highly deserving individuals or groups as deemed appropriate by the installation leadership. Living memorials (tree plantings / etc.) are discouraged due to added maintenance requirements.
4. When sculpture requires a base, match the materials and / or color palette of adjacent buildings.
5. Use direct or indirect lighting to accentuate features or enhance an intended effect.
6. Ensure that all sculpture, markers and statuary are honorable and inspiring, provide a sense of place, positively contribute to the base's visual quality, and encourage pride for the community and the US Air Force.
Page 35 of 158Buckley Air Force Base IFS
B03.1.3. Static Display of Aircraft
Applicable N/A Has large graphics to include (800px x 440px)
Applicable N/A Has small graphics to include (250px x 188px)
1. Follow IFS base-wide standards for all elements of the display area with specific attention to traffic sight lines, pedestrian circulation, site furnishings, signs, and lighting. Address requirements for the Facility District as well.
2. Generally locate concrete base/foundation structures for static displays below grade.
3. At static displays where pedestrian paths are provided, a minimum of one trash receptacle and one bench shall be provided. Receptacle and bench design must conform to IFS requirements.
B03.2. Grounds and Perimeters
Applicable N/A Has small graphics to include (250px x 188px)
1. Provide formal spaces for parade and review functions, recreational areas and parks following the base's Installation Development Plan (IDP) and Installation Facilities Standards (IFS). Refer to the Site Furnishings topic for additional information.
2. Maintain preservation areas following the IDP and IFS.
3. Comply with UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings and UFC 4-022-03 Security Fences and
Gates for all elements associated with the base's gates and perimeter fence.
4. Identify and describe base-wide utility corridors in the IDP.
5. Base-wide utility infrastructure shall be inconspicuous. Bury utility service lines below grade when adjacent to Facility Group 1 and when economically feasible for Facility Groups 2, 3 and 4. When service lines are located above grade, create an ordered, coordinated appearance.
6. Follow the requirements of this IFS regarding all utility structures and service lines located above grade that visually impact the installation.
7. Where screening of utility equipment and structures is provided, allow adequate and proper clearance for safety and maintenance.
8. Reduce visual clutter and visual impact of the following items through a combination of careful placement, screen walls, landscaping and painting:
• Electrical switch-stations.
• Sewage lift stations.
• Water well pumps, storage tanks and/or related structures.
• Gas piping, meters and similar incidental items.
• Above ground fuel storage tanks.
• Any ground-mounted freestanding utility item exposed to view.
Page 36 of 158Buckley Air Force Base IFS
9. Larger structures such as electrical switch-stations, sewage lift stations, fuel storage tanks and mechanical/electrical equipment shall be screened from view, using materials, forms, and colors in the screen walls which match those respective design elements present at adjacent buildings.
10. Paint above-ground equipment and associated components such as electrical piping or exposed plumbing lines dark bronze.
11. Maintain currently buried utility service lines as a visual asset.
12. Bury the following exposed above-grade items in future projects when economically feasible:
• Electrical power grid and service lines.
• Telephone lines.
• Cable TV lines.
• Communications lines.
• Exterior lighting service lines.
• Any similar system of above-ground lines serving the base.
13. Consolidate and enclose service utility lines in underground utility corridors when feasible. Create routes along the inside edge of parking lot islands.
B03.2.1. Parade Grounds
1. Follow UFC 3-201-02, Appendix B for the planning and design process and criteria for parade grounds.
2. Establish and maintain parade grounds only where there is a confirmed need and provide landscape materials appropriate for the locale following IFS.
3. Bleachers may be installed only when there is a documented requirement at parade grounds. Nonferrous metals that do not require painting or going maintenance are preferred. The Base Civil Engineer shall determine quantities, sizes, and products on a case basis.
B03.2.2. Parks
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Page 37 of 158Buckley Air Force Base IFS
Insert Parks graphic
1. Bleachers may be installed only when there is a documented requirement at parks and fields for recreational events.
Follow guidance under Parade Grounds.
2. Picnic pavilions may be provided in parks where there is a documented need.
3. Prohibited picnic pavilion materials include wood, concrete masonry units (CMU) or metal pre-manufactured storage sheds.
4. When picnic pavilions are permitted near facilities, generally match the architecture of the adjacent facility and provide a level of quality of the adjacent facility group number.
5. Refer to graphic B03.2.2.1 for Parks and Recreation Field locations.
B03.2.3. Preserves
Applicable N/A Has small graphics to include (250px x 188px)
1. Preserve open space buffers along the installation's boundaries on the west, north and east to satisfy Force Protection requirements and to provide visual and physical relief from adjacent properties.
2. Preserve the following areas to prevent further development:
a. The land along each side of Aspen St in the Aspen ADP.
b. The linear open space along East Toll Gate Creek
Page 38 of 158Buckley Air Force Base IFS
c. All areas designated as open space in IDP. Refer to graphic B03.2.2.1 for open space designations.
3. Aspen Street, which has been designated as part of the Major Corridor Open Space Preserve, shall have varying overall widths as defined in the Installation Development Plan. The following specific buildings are listed as establishing setback lines:
a. Building 1030 and Building 1032 west of Aspen Street.
4. The following specific requirements shall be incorporated into all project designs within the Aspen Street Corridor Open Space Preserve:
a. Buildings of any size or kind shall not encroach into the preserve at any point. Existing buildings in the preserve, such as Building 1470, may remain. Small additions onto existing buildings may be permitted, provided the overall square footage (footprint) does not exceed 2,000 square feet at each existing building, and providing that the open nature of the preserve is not compromised.
b. All parking lots should be located outside the preserve, except that no part of any parking lot can be located less than fifty feet (50') from the curb at the adjacent street edge of Aspen Street. Parking lots located in the preserve shall typically be located toward the outer edges (setback line) of the preserve, and must incorporate special landscaping and screen walls as described in Section 5.7 - Parking Lot Landscape.
c. Along both sides of Aspen Street, provide a row of Norway Emerald Queen Maple trees, spaced thirty feet (30') on center. The trees shall be lined up both along the street and laterally (across the street) to provide a uniform, rhythmic and formal visual effect. These trees shall be located in the divider strips or on the backside of the sidewalks if divider strip is too small or non-existent.
d. In the central median, provide a minimum of one (1) Honey Locust (If median is a minimum of 10' wide) for every one hundred feet (100'), and fraction thereof. Install low story shrub material not exceeding 30” in height throughout median. If central median is between 6-10' wide - use only shrub material. If under 6' wide - follow the stamped concrete detailing. Trees and shrubs may be grouped to accommodate Aspen Street. streetscape traffic safety requirements (sight visibility triangles). A concrete surface may also be used behind the curb as a splash plate to provide protection from snowplows and chemicals associated with snow removal.
e. Kentucky Blue Grass is currently the principal ground plane material, but should be removed and renovated over time to low water shrubs in wood mulch beds. Rock mulch should also be added at narrow parkway areas & at median nose points where it is inefficient to maintain grass or plant material and to help break up planting beds.
5. Maintain the park-like appearance of the Major Boulevard corridor area. If there is an encroachment within the setback area, screening along the street frontage will be made up of a solid screen/ retaining wall, berming, and shrubbery.
a. The solid screen wall shall be at least four feet (4') high and shall be constructed using the predominant building materials of the character area.
b. Berming should cover at least three feet (3') of the solid screen wall and is intended to be gradual with slopes not exceeding 3:1.
c. Shrubbery located along the edge of the solid screen wall should be provided for additional softening and screening. Provide 1 shrub per 5 lineal feet of frontage. Shrubbery should be laid out in groupings or masses at the perimeter of the lot area. Shrubbery should not necessarily be evenly spaced or distributed along this edge.
At least 60% of these plant materials must be evergreen.
In addition to these screening requirements, the balance of the parking area that encroaches into the open space preserve must meet more stringent requirements of increased interior area and parking lot tree quantities.
B03.2.4. Perimeter Fence
1. Design, install and maintain the base's perimeter fence following UFC 4-022-03.
Page 39 of 158Buckley Air Force Base IFS
2. Stringently comply with AT / FP requirements following UFC 04-010-01 for all spaces adjacent to the base's perimeter fence and all gates.
3. Fencing, gates and other elements that are associated with the main gates shall be a level of quality equivalent to Facility Group 1.
4. Maintain a positive visual quality along the traffic corridor on both sides of the main gates. Specifically address pedestrian access, circulation and common areas.
Page 40 of 158Buckley Air Force Base IFS
C. SITE DEVELOPMENT
Comply with Air Force Corporate Standards for Site Development:
http://afcfs.wbdg.org/site-development/index.html
C01. SITE DESIGN
Comply with Air Force Corporate Standards for Site Development:
http://afcfs.wbdg.org/site-development/index.html
Comply with AF Corporate Standards for Site Design / NEPA:
http://afcfs.wbdg.org/site-development/site-design-nepa/index.html
C01.1. Site Design Considerations
Applicable N/A Has large graphics to include (800px x 440px)
Applicable N/A Has small graphics to include (250px x 188px)
Select number of graphics / images (small: 250 px x 188 px) to insert 12
Insert Site Design Considerations graphic
Group 1 Plaza
Plaza Alignment with Entrance
Pedestrian Access
Integrated Force Protection Measures
Rainwater Harvesting
Open Space Buffer
Page 41 of 158Buckley Air Force Base IFS
Buried Utility Intrastructure
Adjacent Parking
Functional Paved Areas
Detached Sidewalk at Street
Shared Open Space
Internal Pedestrian Path
1. Collect documentation to validate approvals and completion of the NEPA process.
2. Ensure site design compliance with the Installation Development Plan (IDP) and its component plans and Installation Facilities Standards (IFS).
3. Promote integrated design with on-site solutions such as engineered small-scale hydrologic controls verses base-wide infrastructure; consider open space, natural features, bioswales, building roofs, streets, and paved surfaces.
4. Limit the impact of development on land and water resources. All site elements and infrastructure shall reinforce an image of sustainability, with reduced energy demand, renewable-energy usage, and water conservation.
5. Consider energy conservation during site design for the following categories: building and site lighting, auxiliary systems and equipment (refrigerators, elevators, etc.), building envelope, electric power and distribution, HVAC systems and equipment, service hot water, energy management (metering, EMCS).
6. Coordinate on-site renewable-energy systems and components to minimize area requirements and maximize efficiencies.
Appropriately buffer and screen these and other mechanical systems and equipment.
7. New building projects should preserve open space and protect natural habitat.
8. Conform to existing topography to the greatest extent possible and use slopes to increase site and building efficiencies.
Design sites to minimize irrigation and impacts to stormwater runoff.
9. Carefully study new project sites to identify the character of adjacent buildings, streets, landscaping, and site design elements. Reinforce the existing character in new site design.
10. Consider relationships to adjacent facilities and district / centralized heating and cooling infrastructure and cost effectively connect building systems to harvest heat, grey water or other beneficial byproducts.
11. Minimize existing and planned obstructions from landscaping, structures, topography, and adjacent developments to preserve solar access and natural ventilation.
Page 42 of 158Buckley Air Force Base IFS
12. Purposefully integrate service access, receiving and storage areas to eliminate the need for visual screening.
13. Appropriately connect to the base network of streets, sidewalks and trails using drive aisles, parking areas, walkways, paths, and bicycle routes addressing both vehicles and pedestrians.
14. Applicably coordinate heat island mitigation in paving and roof designs when implementing an integrated approach to stormwater management.
15. Consider the location of “Designated Tobacco Areas.”
C01.2. Building Orientation
Select number of graphics / images (large: 800 px x 440 px) to insert 1
Applicable N/A Has small graphics to include (250px x 188px)
Select number of graphics / images (small: 250 px x 188 px) to insert 6
Insert Building Orientation graphic
Conceptual Site Analysis and Site Design Diagram
Page 43 of 158Buckley Air Force Base IFS
Local Solar Data
Local Climate Data
Site Data
East-West Axis
Optimum Solar Control
Optimized Shading
1. Ensure the site will accommodate optimum requirements for building orientation, which is with the long axis parallel to the east/west direction for rectilinear CONUS buildings.
2. Meet Installation Facilities Standards (IFS) requirements for the locations of the building's passive and renewable-energy systems --including geothermal and solar systems --and exterior shading systems.
3. Locate the building(s) and permitted ancillary structures to promote solar gain, solar shading, natural ventilation, rainwater harvesting, wind buffering and other beneficial passive systems. Consider natural ventilation during the design of HVAC systems.
4. Consider relationships to adjacent sites and their facilities and infrastructure, and cost effectively integrate building systems to harvest heat, grey water or other beneficial byproducts.
5. Consider the “public side” of the building, its views and the location of the main entrance.
C02. UTILITIES
Comply with AF Corporate Standards for Site Development:
http://afcfs.wbdg.org/site-development/index.html
Comply with AF Corporate Standards for Utilities:
http://afcfs.wbdg.org/site-development/utilities/index.html
C02.1. Utility Components
Applicable N/A Has large graphics to include (800px x 440px)
Page 44 of 158Buckley Air Force Base IFS
1. Electrical Utility Requirements: The electrical power provider for the Base is Xcel Energy. A 13.2/7.60kv y feeder system north of the Base provides the majority of power for BAFB. The BAFB electrical distribution system consists primarily of a concrete-encased duct bank with pad mounted switches for feeder selection and interruption. The electrical system capacity, as determined by the capacity of the parallel #4/0 MV-105 feeder conductor from the primary switch station, is 630A at 13,200/7620 volts grounded y system, or 13.6 megavolt-amperes (MVA). The system is radial in nature. While there is no loop around the airfield the main Base has three main loops for security reasons. Most of the Base transformers are pad mount type and are installed adjacent to buildings.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .