XLSX spreadsheet 14 KB Posted

Attached to
NORAD AND USNORTHCOM INFORMATION TECHNOLOGY SERVICE MANAGEMENT (N2ITSM)
Solicitation number
FA2517-15-R-7001
Issued by

View the file

Other files

File Type Posted
ATTACHMENT_13__PAST_PERFORMANCE_TRANSMITTAL_LETTER.docx DOCX document
N2ITSM _FA2517-15-R-7001 _Amendment_0003 _2_Jun_2016.pdf PDF
ATTACHMENT_1_-_BASIC_PWS.doc DOC document
ATTACHMENT_3_-_ODC_MEXICO_PWS.docx DOCX document
ATTACHMENT_8_-_BASIC_IDIQ_SERVICE_OUTPUT_SPECIFICATIONS.docx DOCX document
N2ITSM _FA2517-15-R-7001-0003 _Signed_SF30 _2_Jun_2016.pdf PDF
ATTACHMENT_15__CLIENT_AUTHORIZATION_LETTERS.docx DOCX document
Additional_Questions_and_Answers_2_Jun_16.xlsx XLSX spreadsheet
N2ITSM _Amend_0002 _19_May_2016_KH.docx DOCX document
ATTACHMENT_12__PAST_PERFORMANCE_QUESTIONNAIRE _AMEND_0002.docx DOCX document
FA2517-15-R-7001 _Amend_0002 _Signed_SF_30_CoverPage.pdf PDF
N2ITSM_RFP_FA2517-15-R-7001_Amendment_0001 _12_May_16.pdf PDF
N2ITSM_Site_Visit.pptx PPTX presentation
ATTACHMENT_8__BASIC_IDIQ_OUTPUT_SPECIFICATIONS.docx DOCX document
FA2517-15-R-7001.docx DOCX document
ATTACHMENT_4__BASIC_IDIQ_SERVICE_CATALOG.xlsx XLSX spreadsheet
ATTACHMENT_17__SITE_VISIT_QUESTIONS_FORM.xlsx XLSX spreadsheet
ATTACHMENT_2_-_NETWORK_OM_PWS.doc DOC document
Appendix_A _Publications.docx DOCX document
ATTACHMENT_5__ODC_MEXICO_SERVICE_CATALOG.docx DOCX document
ATTACHMENT_10__PAST_PERFORMANCE_INFORMATION_TOOL.accdb —
ATTACHMENT_1_-_BASIC_PWS.doc DOC document
ATTACHMENT_9__DD_FORM_254.docx DOCX document
ATTACHMENT_6__BASIC_IDIQ_SOFTWARE_CATALOG.xlsx XLSX spreadsheet
ATTACHMENT_3_-_ODC_MEXICO_PWS.docx DOCX document
ATTACHMENT_18___N2ITSM_VISIT_REQUEST.docx DOCX document
ATTACHMENT_19___N2ITSM_QASP.docx DOCX document
Appendix_D _Technical_Library.pdf PDF
ATTACHMENT_12__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
ATTACHMENT_13__PAST_PERFORMANCE_TRANSMITTAL_LETTER.docx DOCX document
ATTACHMENT_16__N2ITSM_PRICING.xlsx XLSX spreadsheet
ATTACHMENT_14__CONSENT_LETTERS.docx DOCX document
ATTACHMENT_11__PAST_PERFORMANCE_INFORMATION_TOOL_INSTRUCTIONS.docx DOCX document
ATTACHMENT_7__BASIC_IDIQ_HARDWARE_CATALOG.xlsx XLSX spreadsheet
ATTACHMENT_20__STAFFING_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_15__CLIENT_AUTHORIZATION_LETTERS.docx DOCX document
Appendix_B _Acronyms.docx DOCX document
Appendix_C _Glossary.docx DOCX document
ATTACHMENT_18___N2ITSM_VISIT_REQUEST.docx DOCX document
ATTACHMENT_17__SITE_VISIT_QUESTIONS_FORM.xlsx XLSX spreadsheet
Final_Consolidated_Questions_22_Mar_2016.xlsx XLSX spreadsheet
ATTACHMENT_1_-_BASIC_PWS.doc DOC document
ATTACHMENT_9__DD_FORM_254.docx DOCX document
ATTACHMENT_3_-_ODC_MEXICO_PWS.docx DOCX document
ATTACHMENT_6__BASIC_IDIQ_SOFTWARE_CATALOG.xlsx XLSX spreadsheet
ATTACHMENT_2_-_NETWORK_O M_PWS.doc DOC document
ATTACHMENT_4__BASIC_IDIQ_SERVICE_CATALOG.xlsx XLSX spreadsheet
ATTACHMENT_6__BASIC_IDIQ_SOFTWARE_CATALOG.xlsx XLSX spreadsheet
ATTACHMENT_8__BASIC_IDIQ_OUTPUT_SPECIFICATIONS.docx DOCX document
ATTACHMENT_10__PAST_PERFORMANCE_INFORMATION_TOOL.accdb —
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP additional questions

N2ITSM - RFP FA2517-15-R-7001 - Industry Questions & Gov't Responses - 6 June 2016
Question #ReferenceQuestionGovernment ResponseChange Required (Y/N)Location of Change
1Attachment 20We are not allowed to manually change the drop down functions; however, there will be personnel supporting areas requiring TS/SCI. The clearance drop down only accounts for up to Top Secret clearance level. Will the Government amend Attachment 20 to allow for the offeror to describe TS/SCI positions, or will listing the personnel as TS be acceptable?
TS is acceptable.No
2PPI Tool instructionsContractor used Attachment 11 PPI Tool to enter five past performance citations for FA2517-15-R-7001. After all information was entered and saved, we hit the Step #4: Submit button and got the following screen:
The PPI Tool instructions indicate: “4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the past performance volume subject to the limitations outlined in this RFP and should be part of the Recent & Relevant Contracts section (Tab b) of the past performance volume.” Is the “submission” of the past performance citations solely in the hard copy and the electronic CD that we produce from the EZ Source (PPI Tool) or is there also a way to submit the past performance information via the Access database?The Offeror shall provide the Past Performance Citation via the PPI Tool in the hard copy (Past Performance Volume Tab 3), and in the CD.No
3Professional Compensation PlanWith the due date for N2ITSM less than a week away can our teammates submit their Professional Compensation Plans electronically??
No. The Compensation Plan has to be submitted in accordance with the information provided in section L and M. It cannot be submitted electronically.
No
4RFP ProposalDelivery coordination - hand delivering.The team will be at 21 CONS location all day. There will be signs at the main entrance to let Industry know where to go for delivery. If the Offeror chooses to deliver a day(s) prior to the due date please coordinate time/date with 21 CONS.No
5Attachment 16On Attachment 16 Tab there is a $26M drop in entry. The instructions says not to change that but it has no explanation as to what it is for. Also in the Solicitation instructions Amend 003 page 18 Tab 2 says that this number counts in the total bid price. There must be an error here as that would account for almost half of the workforce. Can you please clarify what this is for and if it truly counts as part of our total combined price which is capped at $72M.The $26M is the plug in figure for future Task Order(s). The amount does not count for the total price for Task Order 1 ($68M) or Task Order 2 ($5M) but it does count for the total overall ceiling of $99M.No
5Page CountCan the Government please clarify that the page limitation of Tab 3 of the Past Performance Volume is 25 pages, while Tabs 1, 2, 4, 5, 6, 7 are excluded from this page limitation? Or is the 25 page limitation inclusive of the whole volume?
The 25 page limit is just for the 5 citation submittals - which is part of Tab 3.No
6Formatting questionsCould the Government please clarify the acceptable font size for graphics/illustrations/exhibits/diagrams, and what is acceptable for tables?REF Section L C 8. Illustrations and tables shall be no smaller than Times New Romans, Arial or Arial Narrow, 10 point. Text lines will be, at a minimum, single-spaced.No
7Formatting questionsDoes the Government intend to have a minimum of 10 pt for tables appearing in the narrative?YES, REF Section L C 8. Illustrations and tables shall be no smaller than Times New Romans, Arial or Arial Narrow, 10 point. Text lines will be, at a minimum, single-spaced.No
8Formatting questionsWill the Governmentt allow 6 pt for graphics and the large Government-provided tables in Attachment 20 (Staffing Matrix), and Pricing
(Attachment 16)?YES, REF Section L C 9 applies to foldouts. The Staffing Matrix (RFP Attachment 20) font may be at a minimum 6 point Arial Narrow to fit in one 11x17 page.No
9Page CountWill the Government consider removing the cover page and cover sheet from the page count for Volume II Technical Capability?The page count was increased from 40 to 44 for Vol II taking in account for the covers/cover sheets, and cover letters. Reference RFP Section L, Section B, Para 1.2.1.No
10Due DateWe respectfully request an extension of one week to the proposal due date in order to finalize our proposal.
9 Jun is a very firm delivery date. The Gov't will not permit the schedule to slip any further. However, please keep watching FBO, in case other changes occur.
No

&"Times New Roman,Regular"&12ATTACHMENT 17 - SITE VISIT QUESTIONS FORM

&P