Amendment 3
Questions & Answers
1. Question: Sec L, L-7.E.2.a (pg 39). RFP states: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using UML and OO methodology.” This methodology is not DoD mandated and is not the approach currently being used in this mission area. This reference to UML and OO methodology is not consistent with M-4.D.2.a. Recommend change to: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using Department of Defense Architecture Framework (DoDAF) Version 2.0 compliant methodology.” This makes it consistent with M-4.D.2.a.
Answer: See revision at L-7E.2.a.
2. Question: MW/MD PWS, Para 1.3.3.7 & 1.3.8.6. PWS Para 1.3.3.7 states: “The government will furnish fourteen (14) workspaces in the Hartinger Building (Bldg. 1) on Peterson AFB.” PWS Para 1.3.8.6 states: “The government will furnish three (3) workspaces in the Hartinger Building (Bldg. 1) on Peterson AFB”. Requirement 4 in the draft RFP was split into Requirements 3 and 8 in the final RFP. Requirement 4 in the draft RFP MW/MD PWS Para 1.3.4.8 stated, “The government will furnish fourteen (14) workspaces in the Hartinger Building (Bldg. 1) on Peterson AFB. “ Please clarify the number of workspaces.
Answer: See revision at page 15, paragraph 1.3.3.7., of MW/MD PWS.
3. Question: MW/MD PWS, Para 5.2., pg 25. PWS states: “Host monthly project working groups and provide presentation support to include technical interchange meetings for up to 120 people conducted up to and including the TOP SECRET SENSITIVE COMPARTMENTED INFORMATION level (TS/SCI).” Please clarify intent is for a conference room that can hold up 120 people at a contractor facility.
Answer: See revision at page 25, paragraph 5.2 of MW/MD PWS.
4. Question: Sec L, L-7.E.2.a, pg 39. RFP states: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using UML and OO methodology.” This methodology is not DoD mandated and is not the approach currently being used in this mission area. This reference to UML and OO methodology is not consistent with M-4.D.2.a. Recommend change to: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using Department of Defense Architecture Framework (DoDAF) Version 2.0 compliant methodology.” This makes it consistent with M-4.D.2.a.
Answer: See revision at Section L-7E.2.a.
5. Question: Volume II, MILSATCOM PWS, Page 16 of 17, Paragraph 3.0. "Government Furnished Property and Services.” The information in the paragraph does not appear to reflect the subject. The corresponding paragraph in the MW/MD ATO discusses what property the Government will furnish.
Answer: See revision at Paragraph 3.0.