Questions Responses - Amendment 3.doc

DOC document 29 KB Posted

Attached to
Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command
Solicitation number
FA2517-08-R-9000
Issued by

About this file

Questions and Answers Amendment 3

View the file

Other files

File Type Posted
FedBizOpps Posting.docx DOCX document
Amendment 10 SF30 Summary of Changes.doc DOC document
Amendment 10 CSMC RFP 11 Dec 09.docx DOCX document
Amendment 9 CSMC RFP 11 Dec 09.docx DOCX document
Amendment 9 SF30 Summary of Changes.doc DOC document
Amendment 8 Attachment L-3 MWMD PWS FINAL 13 Oct 09.doc DOC document
Amendment 8 CSMC RFP.doc DOC document
Amendment 8 SF30 Summary of Changes.doc DOC document
Q A 13 Oct 09.docx DOCX document
Amendment 7 SF30 Summary of Changes.doc DOC document
Amendment 7 CSMC RFP.doc DOC document
Amendment 7 Questions Responses.doc DOC document
Attachment 5 Section L Attachments Amendment 6.doc DOC document
SF30 Summary of Changes - Amendment 6.doc DOC document
CSMC RFP Amendment 6.doc DOC document
Block 13 Continuation Sheet 2 Oct 09.docx DOCX document
Q A 29 Sep 09.docx DOCX document
Amendment 5 Attachment L-3 MWMD PWS FINAL 29 Sep 09.doc DOC document
Questions Responses - Amendment 5.doc DOC document
CSMC RFP 29 Sep 09 Amendment 5.doc DOC document
SF30 Summary of Changes - Amendment 5.doc DOC document
SF30 Summary of Changes - Amendment 4.doc DOC document
Questions Responses - Amendment 4.doc DOC document
Amendment 4 Attachment L-3 MWMD PWS FINAL 25 Sep 09.doc DOC document
CSMC RFP 25 Sep 09 Amendment 4.doc DOC document
Q A 25 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 3.doc DOC document
Amendment 3 Attachment L-3 MWMD PWS FINAL 23 Sep 09.doc DOC document
CSMC RFP 23 Sep 09 Amendment 3.doc DOC document
Attachment L-2 MILSATCOM CSMC PWS Amendment 3.docx DOCX document
Attachment 5 Section L Attachments Amendment 3.doc DOC document
Q A 23 Sep 09.doc DOC document
Questions Responses - Amendment 2.doc DOC document
Attachment 8 Contingency Plan Template.doc DOC document
Amendment 2 Attachment L-3 MWMD PWS FINAL 21 Sep 09.doc DOC document
Attachment 9 OCI Disclosure and Analysis Form.xlsx XLSX spreadsheet
Attachment 1 CSMC PWS FINAL 21 Sep 09.docx DOCX document
Attachment 3 CSMC 254 21 Sep 09.pdf PDF
Attachment 5 Section L Attachments 21 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 2.doc DOC document
CSMC RFP 21 Sep 09 Amendment 2.doc DOC document
Q A 22 Sep 09.doc DOC document
Q A 21 Sep 09.doc DOC document
Attachment 5 Section L Attachments Amendment 1.doc DOC document
CSMC RFP 15 Sep 09 Amendment 1.doc DOC document
CDRL 0026 Sec H-2 Limitations on Subcontracting 15 Sep 09.rtf RTF text file
Questions Responses - Amendment 1.doc DOC document
Attachment 6 Proposal Delivery Directions.docx DOCX document
CDRLS Master List MCCR 24.rtf RTF text file
CDRLS Master List IPSC 22 23.rtf RTF text file
Show 40 more

Latest 50 of 347 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 3

Questions & Answers

1. Question: Sec L, L-7.E.2.a (pg 39). RFP states: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using UML and OO methodology.” This methodology is not DoD mandated and is not the approach currently being used in this mission area. This reference to UML and OO methodology is not consistent with M-4.D.2.a. Recommend change to: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using Department of Defense Architecture Framework (DoDAF) Version 2.0 compliant methodology.” This makes it consistent with M-4.D.2.a.

Answer: See revision at L-7E.2.a.

2. Question: MW/MD PWS, Para 1.3.3.7 & 1.3.8.6. PWS Para 1.3.3.7 states: “The government will furnish fourteen (14) workspaces in the Hartinger Building (Bldg. 1) on Peterson AFB.” PWS Para 1.3.8.6 states: “The government will furnish three (3) workspaces in the Hartinger Building (Bldg. 1) on Peterson AFB”. Requirement 4 in the draft RFP was split into Requirements 3 and 8 in the final RFP. Requirement 4 in the draft RFP MW/MD PWS Para 1.3.4.8 stated, “The government will furnish fourteen (14) workspaces in the Hartinger Building (Bldg. 1) on Peterson AFB. “ Please clarify the number of workspaces.

Answer: See revision at page 15, paragraph 1.3.3.7., of MW/MD PWS.

3. Question: MW/MD PWS, Para 5.2., pg 25. PWS states: “Host monthly project working groups and provide presentation support to include technical interchange meetings for up to 120 people conducted up to and including the TOP SECRET SENSITIVE COMPARTMENTED INFORMATION level (TS/SCI).” Please clarify intent is for a conference room that can hold up 120 people at a contractor facility.

Answer: See revision at page 25, paragraph 5.2 of MW/MD PWS.

4. Question: Sec L, L-7.E.2.a, pg 39. RFP states: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using UML and OO methodology.” This methodology is not DoD mandated and is not the approach currently being used in this mission area. This reference to UML and OO methodology is not consistent with M-4.D.2.a. Recommend change to: “Creating and maintaining MW/MD JCIDS products to include mandated architecture products using Department of Defense Architecture Framework (DoDAF) Version 2.0 compliant methodology.” This makes it consistent with M-4.D.2.a.

Answer: See revision at Section L-7E.2.a.

5. Question: Volume II, MILSATCOM PWS, Page 16 of 17, Paragraph 3.0. "Government Furnished Property and Services.” The information in the paragraph does not appear to reflect the subject. The corresponding paragraph in the MW/MD ATO discusses what property the Government will furnish.

Answer: See revision at Paragraph 3.0.