JA-1_Synopsis_of_Work.pdf

PDF 83 KB Posted

Attached to
F35 Fuel Cell Maintenance Facility - FA5004-18-B-C009
Solicitation number
F500418BA005
Issued by

About this file

JA-1 Synopsis of Work.pdf

View the file

Other files

File Type Posted
Grp_5_QA.pdf PDF
FA500418BA0050002.pdf PDF
Grp_4_QA.pdf PDF
Grp3QA.pdf PDF
mech.pics_1-8.pdf PDF
Grp2_QA.pdf PDF
existing.paint.stripping.pdf PDF
mech.pics_9-16.pdf PDF
mech.pics17-24.pdf PDF
eye.wash.pics.pdf PDF
Grp1_QA.pdf PDF
plumbing.pdf PDF
metal_lockers.pdf PDF
JA-6_Wage_Determination.pdf PDF
JA-9_Asbuilts.pdf PDF
FA500418BA0050001.SF_30.pdf PDF
JA-6_Wage_Determination_.pdf PDF
JA-3_Final_Construction_Docs_Vol_1_Bk_2.pdf PDF
JA-5_FTQW_18-0205_Final_Drawings_22x34.pdf PDF
JA-7_Submittal_Register.pdf PDF
JA-2_Final_Construction_Docs_Vol_1_Bk_1.pdf PDF
JA-4_FTQW_18-0205_Final_Drawings_11x17.pdf PDF
JA-8__Brand_Name_Justification_Det-Tronics.pdf PDF
Solicitation_-_FA500418BA005.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS OF WORK

7 September 2018

PROJECT TITLE: F-35 FUEL CELL MAINTENANCE FACILITY RENOVATION (Bldg 1344)

LOCATION: EIELSON AFB, ALASKA

PROJECT: FTQW 18-0205

DESCRIPTION OF WORK:

The work includes reconfiguration of the existing administrative space, construction of new locker rooms/restrooms, replacement of the existing fire alarm and aqueous film-forming foam (AFFF) suppression systems, conversion of the existing restrooms into a new fire pump room, renovation of the existing hangar door, and supporting mechanical and electrical system improvements and incidental related work.

Construct new office area to provide space for two private offices of approximately 145 and 63 square feet respectively, seven open office work stations, natural daylight from exterior windows, radio equipment storage/charging station, printer station and five full height lockable book cases for manuals, and fire rated viewing window into fuel cell hangar bay.

Construct new locker rooms (one female and one male) to include a single shower in each locker room, two water closets and urinal for men’s and one water closet for women’s, and a single lavatory for each sex. Install 12 X 18 full height lockers at a ratio of 6/28 with perforated faces for ventilation. Locker rooms to provide separate men’s and women’s changing and showering areas.

Construct new break room with seating for approximately 8‐10 personnel, including approximately 8 linear feet of casework with sink and natural daylight.

Renovate interior corridor to provide view windows into hangar area for monitoring of hangar without being physically present in work area.

Renovate hangar door, including replacement of all moving components, including the counterweights. Actual weight of the counterweight will be determined by the contractor as they will be required to field verify the hangar door weight and adjust the weight of the counterweights. Detailed description of work is included in Section 08 36 18 of the specifications.

Demolish the entire existing aqueous film-forming foam (AFFF) fire suppression system in the hangar bay and replace with a code compliant high expansion foam (HEF) and a preaction system as required by Unified Facilities Criteria (UFC) 4-211-01). AFFF meets the definition of hazardous material. Handling and transportation shall be in accordance with applicable federal, state, and Installation regulations as applicable. A detailed description of work is included in Section 21 13 20.00 20 of the specifications. HEF discharges shall be treated as a spill and reported as such. A detailed description of work is included in Section 21 13 20.00 20 of the specifications.

Demolish the existing restrooms and convert the space to house all fire protection equipment.

This room is required to be one-hour fire rated and have access to the exterior.

Convert the existing dry pipe system serving the support spaces of the building to a wet pipe system. The existing dry pipe system shall be flushed prior to filling with water to serve the wet system. Existing sprinkler piping serving support spaces to remain unless required to be modified to accommodate architectural renovations. New sprinkler heads shall be installed on existing converted system.

Install a new fire alarm system and mass notification system.

Demolish and replace the existing HVAC, plumbing, electrical and telecommunications systems system as noted in the plans and specifications. Install a separate electrical service to the fire pumps.

END OF SYNOPSIS