FA500418BA0050002.pdf
PDF 4 MB Posted
- Attached to
- F35 Fuel Cell Maintenance Facility - FA5004-18-B-C009 Federal contract opportunity
- Solicitation number
- F500418BA005
About this file
Amendment #2 extended bid opening and added missing spec
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Grp_5_QA.pdf | ||
| Grp_4_QA.pdf | ||
| Grp3QA.pdf | ||
| mech.pics17-24.pdf | ||
| mech.pics_1-8.pdf | ||
| eye.wash.pics.pdf | ||
| Grp2_QA.pdf | ||
| existing.paint.stripping.pdf | ||
| mech.pics_9-16.pdf | ||
| plumbing.pdf | ||
| metal_lockers.pdf | ||
| Grp1_QA.pdf | ||
| JA-6_Wage_Determination.pdf | ||
| JA-9_Asbuilts.pdf | ||
| FA500418BA0050001.SF_30.pdf | ||
| JA-4_FTQW_18-0205_Final_Drawings_11x17.pdf | ||
| JA-8__Brand_Name_Justification_Det-Tronics.pdf | ||
| Solicitation_-_FA500418BA005.pdf | ||
| JA-6_Wage_Determination_.pdf | ||
| JA-3_Final_Construction_Docs_Vol_1_Bk_2.pdf | ||
| JA-1_Synopsis_of_Work.pdf | ||
| JA-5_FTQW_18-0205_Final_Drawings_22x34.pdf | ||
| JA-7_Submittal_Register.pdf | ||
| JA-2_Final_Construction_Docs_Vol_1_Bk_1.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
Section I - Contract Clauses
Additional Information/Notes
The following clauses were modified:
52.243-1 Alternate II - Changes-Fixed-Price. Apr 1984
Date Changed From: Apr 1984 To: Aug 1987
52.249-2 Alternate I - Termination for Convenience of the Government (Fixed-Price). Sep 1996
Date Changed From: Sep 1996 To: Apr 2012
FA500418BA0050002
F-35 FUEL CELL MAINTENANCE FACILITY RENOVATION FINAL
FTQW 18-0205
SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 302 Designation, Reportable Quantities, and Notification
1.2 DESCRIPTION OF WORK
The work consists of excavation and temporary storage of approximately 60 cubic yards of contaminated material. Approximate locations of contaminated material are shown on the drawings in the Appendices. Site ST020 contains PFOS/PFOA, benzene, toluene, ethylbenzene and xylenes. Site SO504 contains PFOS/PFOA, ethylene chloride, arsenic, cobalt, iron, manganese and molybdenum. Submit a Work Plan (Sampling and Analysis Plan (SAP)) as specified below. Notify the Contracting Officer within 24 hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Backfill material is available onsite. Ground water elevationsare shown in as-built drawings in the Appendices. Required sampling and chemical analysis shall be conducted in accordance with the most current Alaska Department of Environmental Conservation (ADEC) Division of Spill Prevention and Response Contaminated Sites Program (CSP) Field Sampling Guidance.
1.2.1 Work Plan(SAP)
A programmatic Uniform Federal Policy for Quality Assurance Project Plan (UFP-QAPP) has been developed for the F-35 Beddown program. The Contractor shall amend the programmatic UFP-QAPP as necessary and it shall be used as a SAP for this project. However, the Contractor will be responsible for sampling and disposal of all contaminated soils including soils contaminated with PFOS/PFOA. The F-35 Programmatic QAPP Work Plan is
SECTION 02 61 13 Page 1 attached to this specification.
Submit a SAP to the Contracting Officer within 60 calendar days prior to delivery of materials or start of work to allow time for Installation Restoration Program Office (AFCEC/CZOP), ADEC CSP and EPA review and approval. No work at the site, with the exception of site inspections and surveys, shall be performed until the SAP is approved by all agencies.
AFCEC/CZOP will review the SAP and will provide comments to the Contracting Officer. The Contractor shall revise the SAP to address the comments and resubmit it for re-review. Upon approval of the SAP AFCEC/CZOP will submit the SAP to ADEC CSP and the U.S. Environmental Protection Agency (EPA) for review. Review comments shall be addressed by the Contractor and the SAP shall be resubmitted to the Contracting Officer for resubmittal to ADEC CSP and the EPA through AFCEC/CZOP. Allow 60 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. The SAP shall include the elements listed in the most current ADEC CSP Site Characterization Work Plan and Reporting Guidance for Investigation of Contaminated Sites document. The most current ADEC CSP Field Sampling Guidance document shall be used for developing sampling methodology.
1.2.2 Site Characterization Report (Field Report)
Submit an electronic copy of the Field Report to the Contracting Officer 30 calendar days prior to facility acceptance/work completion. The Field Report shall include the elements listed in the most current ADEC CSP Site Characterization Work Plan and Reporting Guidance for Investigation of Contaminated Sites. The Field Report shall be reviewed and approved by AFCEC/CZOP, ADEC CSP and EPA. The review process will follow the process for review and approval of the SAP.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
SAP; G
Field Report; G
SD-06 Test Reports
Backfill Surveys Confirmation Sampling and Analysis Sampling of Stored Material; G Sampling Liquid; G Compaction
SD-07 Certificates
Waste Manifests; G
ADEC Approved Disposal Facility Weight And/Or Acceptance Ticket For Contaminated Soil; G
SECTION 02 61 13 Page 2
ADEC Approved Disposal Facility Certificate Of Thermal Incineration Or Disposal Of Contaminated Soil; G
ADEC Transport, Treatment, & Disposal Approval Form For Contaminated Media (ATT); G
1.4 REGULATORY REQUIREMENTS
1.4.1 Permits and Licenses
Obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government. Reference Section 01 57 19 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS for Eielson AFB permit requirements.
1.4.2 Air Emissions
Air emissions shall be monitored and controlled in accordance with Section
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.
PART 2 PRODUCTS
2.1 SPILL RESPONSE MATERIALS
Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled. Reference Section 01 57 19 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS for Eielson AFB spill reporting requirements.
2.2 BACKFILL
Backfill shall be placed in accordance with other sections of these specifications, as appropriate. Excavated materials conforming to specification requirements for materials to be used for fills, backfilling, grading or topsoiling, may be utilized provided there are no indications of contamination as defined herein.
Do not use material for backfill until borrow source chemical and physical test results have been submitted and approved.
PART 3 EXECUTION
3.1 SURVEYS
Perform surveys immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed, and to include in the Site Characterization Report. Include the follwing information:
Date, time, and location (GIS coordinates as listed below) of tests;
Universal Transverse Mercator (UTM) Projection: Transverse Mercator Zone: 6 North Horizontal Datum: WGS
SECTION 02 61 13 Page 3
1984 Spheroid: WGS 1984 False Easting: 500000.000000 False Northing: 0.000000 Central Meridian: 147° West Longitude Latitude of Origin: 0° Latitude Scale Factor: 0.999600 Vertical Datum: NAVD 1988 Linear Unit: 1 Meter
Locations of test points
3.2 EXISTING STRUCTURES AND UTILITIES
No excavation shall be performed until site utilities have been field located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.
3.3 CLEARING
Clearing shall be performed to the limits shown on the drawings.
3.4 CONTAMINATED MATERIAL REMOVAL
3.4.1 Excavation
Excavation shall be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An excavation log describing visible signs of contamination encountered shall be maintained for each area of excavation. Excavation logs shall be prepared in accordance with ASTM D5434.
Per ADEC guidance, 100% of the soils from areas of known or discovered contamination including land-use control (LUC) boundaries of Installation Restoration Program (IRP) contaminated sites (even with PID screening levels below 20 ppm) must be stockpiled on liners and analytical samples must be collected to determine disposition of soils. Stockpiles should be separated by three screening levels: less than 20 parts per million (ppm) are presumed clean; 100< and >20 ppm are potentially contaminated; and >100 ppm are considered contaminated. Analytes included for testing shall be limited to chemicals of concern (COC) for the site. All stockpiled soil will need to be sampled, transported offsite, and disposed of in accordance with applicable regulations.
3.4.2 Shoring
If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.
3.4.3 Dewatering
Surface water shall be diverted to prevent entry into the excavation.
Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met. No dewatering shall be performed without prior approval of the Contracting Officer. Dewatering operations
SECTION 02 61 13 Page 4 at sites with known contamination are explicitly prohibited without coordination with the Installation Environmental Office CES/CEI, AFCEC/CZOP and written consent from the EPA Region 10, and ADEC. No exceptions.
Reference Section 01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS.
3.5 CONFIRMATION SAMPLING AND ANALYSIS
The Contracting Officer or government appointed inspector shall be present to inspect the removal of contaminated material from each site. After all material suspected of being contaminated has been removed, the excavation shall be examined for evidence of contamination. If the excavation appears to be free of contamination, field analysis shall be used to determine the presence of petroleum contamination using Photo Ionization Detector (PID).
Excavation of additional material shall be as directed by the Contracting Officer. After all suspected contaminated material is removed, confirmation samples shall be collected and analyzed for the following contaminants: DRO, GRO, RRO, VOCs, PAHs, RCRA metals (plus antimony, vanadium, zinc, and selenium), pesticides, PCBs, sVOCs, and EDB.
Samples shall be collected at a frequency that conforms with the most current ADEC CSP Field Sampling Guidance document. A minimum of one sample shall be collected from the bottom and each side wall of the excavation.
Based on test results, propose any additional excavation which may be required to remove material which is contaminated above action levels.
Additional excavation shall be subject to approval by the Contracting Officer. Locations of samples shall be marked in the field and documented on the as-built drawings.
3.6 CONTAMINATED AND POTENTIALLY CONTAMINATED MATERIAL STORAGE
Material shall be placed in temporary storage immediately after excavation.
The following paragraphs describe acceptable methods of material storage.
Storage units shall be in good condition and constructed of materials that are compatible with the material or liquid to be stored. If multiple storage units are required, each unit shall be clearly labeled with an identification number and a written log shall be kept to track the source of contaminated material in each temporary storage unit.
3.6.1 Stockpiles
Stockpiles shall be constructed to isolate stored contaminated material from the environment. Stockpiles shall be constructed to include:
a. A chemically resistant geomembrane liner free of holes and other damage. Non-reinforced geomembrane liners shall have a minimum thickness of 20 mils. Scrim reinforced geomembrane liners shall have a minimum weight of 40 lbs/1000 square feet. The ground surface on which the geomembrane is to be placed shall be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane.
b. Geomembrane cover free of holes or other damage to prevent precipitation from entering the stockpile. Non-reinforced geomembrane covers shall have a minimum thickness of 10 mils. Scrim reinforced geomembrane covers shall have a minimum weight of 26 lbs/1000 square feet. The cover material shall be extended over the berms and anchored or ballasted to prevent it from being removed or damaged by wind.
c. Berms surrounding the stockpile, a minimum of 12 inches in height.
SECTION 02 61 13 Page 5
Vehicle access points shall also be bermed.
d. The liner system shall be sloped to allow collection of leachate.
Storage and removal of liquid which collects in the stockpile, in accordance with paragraph Liquid Storage.
3.6.2 Roll-Off Units
Roll-off units used to temporarily store contaminated material shall be water tight. A cover shall be placed over the units to prevent precipitation from contacting the stored material. The units shall be located as directed by the Contracting Officer. Liquid which collects inside the units shall be removed and stored in accordance with paragraph Liquid Storage.
3.6.3 Liquid Storage
Liquid collected from excavations and stockpiles shall be temporarily stored in 55 gallon barrels or 250 gallon tanks with secondary containment.
Liquid storage containers shall be water-tight and shall be located as directed by the Contracting Officer.
3.7 SAMPLING
3.7.1 Sampling of Excavated and Stored Material
Samples of excavated and stored material shall be collected in accordance with the most current ADEC CSP Field Sampling Guidance.
3.7.2 Sampling Liquid
Liquid collected from excavations and or storage areas shall be sampled in accordance with the most current ADEC CSP Field Sampling Guidance.
3.7.3 Sampling Beneath Storage Units
Samples from beneath each storage unit shall be collected prior to construction of and after removal of the storage unit. Samples shall be collected in accordance with the most current ADEC CSP Field Sampling Guidance.
Based on test results, soil which has become contaminated above action levels shall be removed at no additional cost to the Government.
Contaminated material which is removed from beneath the storage unit shall be handled in accordance with paragraph Sampling of Excavated and Stored Material. As directed by the Contracting Officer and at no additional cost to the Government, additional sampling and testing shall be performed to verify areas of contamination found beneath stockpiles have been cleaned up to below action levels.
3.8 SPILLS
In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302 ), pollutant, contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the Contracting Officer immediately and by calling 911 and asking for Eielson Air Force Base Fire Department and to the 354 CES/CEIEC at (907) 377-SPIL. All spills shall be reported and handled in accordance with Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Immediate containment actions shall be
SECTION 02 61 13 Page 6 taken to minimize the effect of any spill or leak. Cleanup shall be in accordance with applicable federal, state, and local regulations. As directed by the Contracting Officer, additional sampling and testing shall be performed to verify spills have been cleaned up. Spill cleanup and testing shall be done at no additional cost to the Government.
3.9 BACKFILLING
3.9.1 Confirmation Test Results
Excavations shall be backfilled immediately after all contaminated materials have been removed and confirmation test results have been approved. Backfill shall be placed and compacted to the lines and grades shown on the drawings.
3.10 DISPOSAL REQUIREMENTS
Offsite disposal of contaminated material shall be in accordance with Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.
-- End of Section --
SECTION 02 61 13 Page 7
Date: June 2018
SHEET 9 - INFORMATION
This atlas shows only an approximate representation of restoration sampling and site locations at this Air Force base. Exact locations should be verified before any digging, drilling or excavation.
Well types include: monitoring, bioventing, piezometer, and injection. Entire Contents Copyright © 2018, United States Air Force .
No portion of this atlas may be photocopied, electronically stored, or reproduced in any manner without the written permission from the United States Air Force.
Institutional Controls
Soil and Groundwater Use Restrictions
Sites CG527, LF003, LF043, PL001, SO503, SO504, SS067, ST019, ST020, ST027
• Development of a site map showing the areas currently and potentially impacted by groundwater contaminants to determine where the controls are to be implemented
• A prohibition on the installation or use of drinking water wells
• A requirement that all monitoring wells are secured with locks to prevent unauthorized access to groundwater
• Any activity that may result in access to contaminated groundwater or affect the movement of contaminated groundwater requires approval by Environmental Flight (CEIE)
• Any activity that may result in the disturbance of any remedial action requires approval by
CEIE
• Any activity that may result in exposure to or removal of contaminated soil requires approval by CEIE. In the event that contaminated soil or groundwater is removed from the source area, it will be disposed of or treated in accordance with applicable state and federal regulations
• A requirement of notice to and approval by ADEC and EPA of any proposal to add to or alter land use controls
• A requirement to notify ADEC and EPA of any proposal to change the existing land use
• Groundwater monitoring is conduced under the SWMP to maintain an accurate definition of the area of contamination
Decision Document Controls
General Document Controls
Sites CG527, PL001, SO503, ST019, SO504
• The installation or use of drinking water wells is restricted
• Secure all monitoring wells with locks to prevent unauthorized access to groundwater
• Any activity that may result in access to contaminated groundwater or affect the movement of contaminated groundwater requires approval by Installation Management (CEIE)
• In the event that contaminated soil or groundwater is removed from the source area, it will be disposed of or treated in accordance with applicable state and federal regulations
• There is a 200 foot buffer boundary on the site until better delineation is defined
In Addition to the General Document Controls
Site LF003
• Place fencing or signage around a landfill to maintain the integrity of the cap and prevent unauthorized access to prevent human intrusion into landfills and drum disposal areas; prevent contact with possible groundwater and soil contamination; and prevent additional dumping
• Prevent human exposure to possible water and soil contamination
Sites ST049, ST027, SS062, LF003, ST020
• Any activity that may result in the disturbance of any remedial action requires approval by the Installation Management (CEIE)
Sites SS062, SS067, ST020
• Surface water use requires approval of Installation Management (CEIE)
Site SS067
• Fishing restrictions are limited to catch and release only
Site ST020
• Notify the regulatory agencies of proposed dewatering activities, and evaluate their potential for impacting areas of groundwater contamination
• Implement ICs to prevent exposure to contaminated groundwater. In the event of base closure, any remaining contaminated source areas will be addressed in accordance with CERCLA Section 120
Base Administrative Controls
General Base Administrative Controls
Sites CG527, LF003. LF043, PL001, SO503, ST027, SO504
• Any activity that may result in the disturbance of soil requires approval by Installation Management (CEIE). Complete Base Civil
Engineering Work Clearance (Form 103) and obtain approval prior to any work at the site.
In Addition to the General Document Controls
Site ST019
• In accordance with the 2008 Land Use Controls Management Plan, monitoring wells need to be secured with locks to prevent unauthorized access to groundwater
Site ST020
• In the event of base closure, any remaining contaminated source areas will be addressed in accordance with CERCLA Section 120
Site SS067
• A base fishing license and briefing are required to fish on Eielson AFB. Residents applying for permits to fish on base are advised not to consume any fish caught and are informed of the PCB contamination
• Signs are installed along the banks of Garrison Slough indicating potential contamination and the requirement to contact Eielson
Natural Resources regarding fishing restrictions
*Plume boundaries are approximated based upon the most current groundwater monitoring results. Plume boundaries shown on the map represent the point at which contaminant concentrations in the groundwater equal their respective cleanup levels. Where multiple contaminant concentrations are present, boundaries represent the furthest areal extent of contamination above cleanup levels. See Table 1a for more information about specific plumes.
**Labels on buildings indicate Building Numbers on the top line and Facility ID on the bottom line.
Legend
Non-Program Monitoring Well Location
Program Monitoring Well Location
Railroad
Fence
Groundwater Control Area
Groundwater Plume - Fuels & Solvents*
Groundwater Plume - Fuels*
Groundwater Plume - Solvents*
3 - Party Historic Source Area
2 - Party Historic Source Area
@A
Groundwater Contour (AMSL feet)
Closed Site
Open Site
LF003
LF003
Above Mean Sea Level
Land Use Control
AMSL
LUC
Building**
7 7
++++ Soil Control Area
Installation Boundary
2 - Party Source Area 200' Buffer
3 - Party Source Area 200' Buffer
Airfield
Demolished Structure
No Applicable Building Number or Facility ID is identified for this structure
N/A
Road
MMRP Source Area
MMRP Source Area 200' Buffer
Military Munitions Response ProgramMMRP
P :\A
K _E ie ls on _A
FB
\G
IS
\M
X D
\1 8E
I_ P
B R
\2
8W el lA tla s\ P
B R
_2
8_ E ie ls on W el lA tla s.
m xd t ar na sa
N/A
LOOP ACCESS ROAD
CA
R
G
AI
N R
O
AD
MULL
IN
S
PITS ROAD
NA
1306628
HANG-MW01
UNKNOWN-04
19PS29
19PS27
20M20B
HANG-MW02
PL001MW02
20M19
20PS58
19PS23
B-13
20PS58
WB-1
19PS11
19PS30
19PS13
20MW39
20MW26B
19PS4
19PS33
20MW38
27-1
19PS21
19PS25
20MW29
20MW42
20MW30 20MW43A20MW20
20MW40
19PS12
20PS58C
20MW41
19PS31B
19MW08
19PS5
20M15B
19PS15
19PS2
19PS20
19PS8
20PP58B
19PS26
03M09
20MW31
SS067
SS067
ST019
ST027
ST020(E-8)
ST020(E-7)
ST020(E-9)
LF003
LF043
MULLINS
PIT
ST020(E-9)
Groundwater
ST020(E-8)
Groundwater
LF003
Groundwater
LF003
Soil
ST020(E-9)
Soil
SO503
CG527
SO504
PL001
0 500 1,000 1,500 Feet
Legend
Continued on Sheet 15
Continued on Sheet 6
C on tin ue d on
S he et
C on tin ue d on
S he et
WGS 1984 UTM Zone 6N
Sheet 9 of 37
³ 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18 19 20 21
22 23 24 25 26 27 28 29 30 31 32 33
SOURCE AREA LOCATION
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 01 14 00 01 30 00 01 32 01.00 10 01 32 16.00 20 01 33 00 01 35 26 01 42 00.10 01 45 00.00 10 01 45 35 01 50 00 01 57 19.01 20 01 58 00 01 60 00 01 73 29 01 74 19 01 78 00 01 78 23
SUMMARY OF WORK
WORK RESTRICTIONS
ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
EXPLANATIONS: DRAWINGS AND SPECIFICATIONS
QUALITY CONTROL
SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
MATERIAL AND EQUIPMENT
CUTTING AND PATCHING
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 42 13 METAL WALL PANELS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 36 18 REPLACEMENT OF HANGAR DOOR COMPONENTS AND OPERATORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
PROJECT TABLE OF CONTENTS Page 1
DIVISION 09 - FINISHES
09 29 00 09 30 10 09 51 00 09 65 00
09 90 00 09 96 00
GYPSUM BOARD
CERAMIC, QUARRY, AND GLASS TILING
ACOUSTICAL CEILINGS
RESILIENT FLOORING
PLASTIC PANELS
PAINTS AND COATINGS
HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 20.00 20 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 23 05 15 23 05 93 23 07 00
23 09 93 23 21 23
AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
COMMON PIPING FOR HVAC
TESTING, ADJUSTING, AND BALANCING FOR HVAC
THERMAL INSULATION FOR MECHANICAL SYSTEMS
DIRECT DIGITAL CONTROL FOR HVAC, BACNET, CEPOA SPECIFIC
SEQUENCES OF OPERATION FOR HVAC CONTROL
HYDRONIC PUMPS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 26 05 00.00 40 26 05 19.10 10 26 05 71.00 40 26 09 23.00 40 26 12 19.10 26 20 00 26 24 16.00 40 26 27 14.00 20
BASIC ELECTRICAL MATERIALS AND METHODS
COMMON WORK RESULTS FOR ELECTRICAL
INSULATED WIRE AND CABLE
LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
LIGHTING CONTROL DEVICES
THREE-PHASE PAD-MOUNTED TRANSFORMERS
INTERIOR DISTRIBUTION SYSTEM
PANELBOARDS
ELECTRICITY METERING
PROJECT TABLE OF CONTENTS Page 2
09 77 33
23 09 23.00 29
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 33 - UTILITIES
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
26 51 00 26 52 00.00 40
INTERIOR LIGHTING
EMERGENCY LIGHTING
| FTQW 18-0205_PROJECT TABLE OF CONTENTS 10-23-2018.pdf |
| PROJECT TABLE OF CONTENTS |
| IDCode: |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0002 |
| EffDate: 11/1/2018 |
| ReqNo: A000784 |
| ProjNo: FTQW 18-0205 |
| IssCode: FA5004 |
| AdmCode: |
| IssuedBy: FA5004 354 CONS LGC |
CP 907 377 5207
2310 CENTRAL AVE STE 3
EIELSON AFB, AK 99702-2200
United States Rachel Oldfield, Email: rachel.oldfield@us.af.mil Telephone: (907) 377-3506
| AdminBy: |
| ContractorNameAdd: |
| SolNo: FA500418BA005 |
| SolChg: 1 |
| SolDate: 9/19/2018 |
| AwardChg: |
| AwardNo: |
| Code: |
| FacCode: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: Off |
| Require: |
| Copies: |
| Descript: 1. Extend Bid opening from 11/6/2018 to 11/14/2018; time of opening, 2:00pm (local time) remains the same. |
2. Added missing spec for contaminated soil (02 61 13).
3. Added updated Table of Contents to include contaminated soil spec (02 61 13).
| ContNameTitle: |
| CoNameTitle: James J. Kot |
Email: james.kot@us.af.mil Telephone: (907) 377-377-7061
| ContDate: |
| CODate: |
File details come from the government source that posted it.