PROJECT TITLE: F‐35 FUEL CELL MAINTENANCE FACILITY RENOVATION (Bldg 1344)
LOCATION: EIELSON AFB, ALASKA
PROJECT: FTQW 18‐0205
SOLICITATION QUESTIONS AND ANSWERS: Group 3
1. Door supplier called and neither of us can locate the hardware groups called out in the door schedule on A‐920. Please clarify.
ANSWER: Door hardware information is detailed in specification Section 08 71 00. The manufacturers names are listed on Page 13. The manufacturers listed are well known. For example hardware dealers for Best Access Systems, Stanley and Trimco are relatively easy to find with an online search.
2. . In reading through Questions & Answers & Pictures Group #2 it appears that there are some of the same questions & attachments that are located in Group #1 which the attachments missing from Group #2. Please see below for additional items missing from Group #2: Revised Sheet A500 (QA #9, #18) Section 072719 Self‐Adhering Air Barriers (QA #13) Section 061000 Rough Carpentry (QA #17) Section 055013 (QA#28) Detail 9a, 9b & 9c / A810 (QA #29) Revised Section 099600 (QA #56) Question #58.
ANSWER: Please see the attached items.
3. Question #57, yes the Pre‐Bid Site Visit Attendee List is attached. Are the names & phone numbers supposed to be blacked out?
ANSWER: Yes, names and phone numbers are supposed to be blocked out. There is no official guidance on sharing the site visit attendee list, therefore, 354 CONS has determined that publishing the list of companies who attended should help with bid preparation while not releasing any personal information such as personal cell phones.
F-35 FUEL CELL MAINTENANCE FACILITY RENOVATION FINAL
FTQW 18-0205
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 96 00
HIGH-PERFORMANCE COATINGS
11/14
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.4 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
2.2 MATERIALS
2.2.1 Epoxy Coatings
2.2.1.1 Concrete Surface Coatings
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Surface Preparation
3.1.2 Cleaning
3.1.3 Concrete Surfaces
3.1.3.1 Concrete Substrates
3.1.4 Coating Material Preparation
3.1.4.1 Thinning
3.1.4.2 Tinting
3.2 APPLICATION
3.2.1 Brush Application
3.2.2 Roller Application
3.2.3 Spray Application
3.3 FIELD QUALITY CONTROL
3.3.1 Field Test
3.3.2 Repairing
-- End of Section Table of Contents --
SECTION 09 96 00 Page 1
SECTION 09 96 00
HIGH-PERFORMANCE COATINGS
11/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM SI10 (2016) American National Standard for Use of the International System of Units (SI):
The Modern Metric System
MASTER PAINTERS INSTITUTE (MPI)
MPI ASM (2012) Architectural Painting Specification Manual
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Epoxy Paint; G
SD-03 Product Data
Epoxy Coatings; G
SD-04 Samples
Color Chips; G
SD-07 Certificates
Manufacturer's Printed Instructions; G
1.3 QUALITY CONTROL
Comply with Master Painters Institute (MPI) Standards indicated and listed in "MPI Approved Products List." Comply with the requirements in "MPI Architectural Painting Specification Manual" before any project is started.
SECTION 09 96 00 Page 2
Submit an equipment list consisting of a list of proposed equipment to be used in performance of construction work.
Submit three color chips 3-inch by 4-inch or manufacture's pull-down of each finish color and gloss as scheduled.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver special coating materials to the project in their original containers bearing manufacturer's name, descriptive label, and coating formulations. Provide new and unopened containers.
Store special coating materials in tightly closed containers in a covered, well-ventilated area where they are not exposed to excessive heat, fumes, sparks, flame, or direct sunlight. Protect water-based coatings against freezing.
Store solvents, thinners, and equipment cleaners with the same care as the coating materials with ambient temperatures continuously maintained at a minimum 45 degrees F.
PART 2 PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
Submit manufacturer's catalog data including manufacturer's name and identification. Include detailed data analysis of each special coating material required for the project, with all the coating constituents measured as percentages of the total weight of the coating. Also provide manufacturer's data concerning application, thinning, and average coverage per gallon
2.2 MATERIALS
2.2.1 Epoxy Coatings
5-coat epoxy system, Slip-resistan, light reflective. Mark floor areas with striping per below.
a. Layout floor striping and clear areas according to UFC 4-211-01 13 April 2017, Change 1 November 2017 paragraph 5-3.2.
b. Submit an epoxy paint shop drawing depicting proposed layout to the Contracting Officer 45 days in advance of planned work for approval.
Resins for finish coats are based on a polyamide-cured, epoxy-resin material. Apply finish coats with a dry-film thickness of not less than 4 mils per coat. Finish color and gloss are as indicated.
2.2.1.1 Concrete Surface Coatings
Apply an epoxy slip-resistant deck coating system; Basis of Design ECO-MPE 5-coat epoxy system by Tennant Company. Apply a prime coat to fill concrete surface pores with a total dry-film thickness of not less than 2 mils.
SECTION 09 96 00 Page 3
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Surface Preparation
Protect adjacent materials and equipment against damage from spillage, dripping, and spatter of coating materials. Leave clean building materials and equipment with all damaged surfaces corrected. Provide "WET PAINT" signs to indicate newly painted surfaces.
Protect work of other trades against damage from coating operation.
Correct damage by cleaning, repairing, replacing, and recoating, as approved by the Contracting Officer, and leave in an undamaged condition.
At completion of construction activities of other trades, touch up and restore damaged or defaced coated surfaces.
Provide forced ventilation for interior spaces during application and drying of coatings to prevent the buildup of toxic or explosive concentrations of solvent vapors.
Provide fire extinguishers of the required quantity and correct type to combat flammable liquid fires.
Dispose of rags that are used to wipe up coating materials, solvents, and thinners by drenching with water and placing them in a covered metal container
3.1.2 Cleaning
At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
Clean application equipment promptly and thoroughly with a suitable solvent after each use and stored in a clean, covered, well-ventilated container.
3.1.3 Concrete Surfaces
Conform to MPI ASM for substrates indicated. Remove plates, machined surfaces, and similar items already in place that are not to be coated.
Provide surface-applied protection before surface preparation and coating where removal is impractical or impossible. After completing coating operations, reinstall items that were removed.
Clean dirt, oil, grease, and incompatible paints from substrates to ensure bonding. Coordination of shop-applied prime coats with high-performance coatings is critical. Remove incompatible primers. Reprime substrate with compatible primers as required to produce coating systems indicated.
3.1.3.1 Concrete Substrates
Remove release agents, curing compounds, efflorescence, and chalk. Maximum allowable moisture content of concrete is 12 percent. Measure moisture content with an electronic moisture meter.
SECTION 09 96 00 Page 4
Clean surfaces with pressurized water. Use pressure range of [ 1500 to 4000 psi at 6 inch to 12 inch][ 4000 to 10,000 psi].
Comply with SSPC 7/NACE No.4 (NACE No. 4), "Brush-Off Blast Cleaning" for abrasive cleaning.
3.1.4 Coating Material Preparation
Mix and prepare coating materials in accordance with the coating manufacturer's printed instructions for applying the particular material and coat. Keep materials which are not in actual use in closed containers.
Coating materials that have been mixed with an automatic shaker are allowed to stand to let air bubbles escape, then given a final hand mixing before application. Stir materials so as to produce a mixture of uniform density. Stir at frequent intervals during application to prevent skinning. Do not stir film which may form on the surface of the material.
Remove film and strain, if necessary.
3.1.4.1 Thinning
Thinning is done in accordance with coating manufacturer's printed directions for the particular material and coat.
3.1.4.2 Tinting
Ensure prime and intermediate coats of paint are slightly different tints from the finish coat to facilitate identification of each coat. Tinting is done by the coating manufacturer and clearly identified as to color and coat.
3.2 APPLICATION
Do not perform exterior painting in damp or rainy weather. Interior painting is not allowed until the building is enclosed and has thoroughly dried out. Painting is not allowed below 50 degrees F or above 95 degrees F. Apply paint in accordance with the coating manufacturer's recommendations, and as specified.
Ensure coating application is done by skilled applicators. Apply coatings to clean and properly prepared surfaces. Apply coatings with clean, high-quality application equipment. Allow sufficient time between coats to ensure complete drying and curing. Sand and dust surfaces between coatings, as required, to produce a surface free of visible defects.
Lightly sand high gloss coatings and clear finishes between coats to ensure bond of following coats.
Apply coats to the surfaces in an even film. Cloudiness, spotting, holidays, laps, application marks, runs, sags, and other similar surface imperfections are not acceptable. Remove defective coating applications and re-coat as directed.
Ensure coating lines such as wainscots are sharp, true, and well-defined.
Tape may be used to establish coating lines, providing tape is removed before ragging or sawtooth edges form.
Ensure surfaces, including edges, corners, crevices, welds, and other similar changes in surface plane, meet the dry-film thickness not less than specified.
SECTION 09 96 00 Page 5
3.2.1 Brush Application
Use clean, proper size brushes for high-quality application of the specified coating materials. Brush out slow-dry coatings. Brush out quick-dry coatings only enough to spread out evenly.
3.2.2 Roller Application
Use clean roller covers of the proper nap length, nap texture, and material for high-quality application of the specified coating materials.
Ensure roller application is equivalent in all respects to the same coats applied by high-quality brush application.
3.2.3 Spray Application
Do not allow spray application of coatings.Spray application equipment is limited to airless-spray equipment and electrostatic-spray equipment.
Ensure equipment is clean and operated by workmen skilled in high quality application of coating materials.
3.3 FIELD QUALITY CONTROL
3.3.1 Field Test
Government may take dry-film tests from time to time on finished surfaces.
Apply additional coatings to surfaces where there is less than the minimum specified dry-film thickness.
3.3.2 Repairing
Remove damaged and unacceptable portions of completed work and replace with new work to match adjacent surfaces at no additional cost to the Government.
-- End of Section --
SECTION 09 96 00 Page 6
SECTION TABLE OF CONTENTS
DIVISION 10 - SPECIALTIES
SECTION 10 51 13
METAL LOCKERS
05/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, HANDLING, AND STORAGE
1.4 FIELD MEASUREMENTS
1.5 QUALITY ASSURANCE
1.5.1 Color Chips
PART 2 PRODUCTS
2.1 TYPES
2.1.1 Single-tier Lockers
2.1.2 Locker Benches
2.2 MATERIAL
2.2.1 Galvanized Steel Sheet
2.2.2 Chromium Coating
2.2.3 Finish
2.2.3.1 Color
2.3 COMPONENTS
2.3.1 Built-In Locks
2.3.2 Coat Hooks
2.3.3 Hat Shelf
2.3.4 Door Handles
2.3.5 Doors
2.3.5.1 Hinges
2.3.5.2 Latching Mechanisms
2.3.6 Latch Strikes
2.3.7 Silencers
2.3.8 Back and Side Panels, Tops, and Bottoms
2.3.9 Sloping Locker Tops
2.3.10 Infill Panels
2.3.11 Shelves
2.3.12 Base Panels
2.3.13 Legs
2.3.14 Number Plates
2.3.15 Fastening Devices
PART 3 EXECUTION
3.1 ASSEMBLY AND INSTALLATION
3.2 FIELD QUALITY CONTROL
3.2.1 Testing
3.2.2 Repairing
3.2.3 Cleaning
SECTION 10 51 13 Page 1
-- End of Section Table of Contents --
SECTION 10 51 13 Page 2
SECTION 10 51 13
METAL LOCKERS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A568/A568M (2017a) Standard Specification for Steel, Sheet, Carbon, Structural, and High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, General Requirements for
ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A924/A924M (2017a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM D6386 (2016) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-PRF-22750 (2011; Rev G) Coating, Epoxy, High Solids
MIL-PRF-23377 (2012; Rev K) Primer Coatings: Epoxy, High Solids
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS AA-L-00486 (Rev J) Lockers, Clothing, Steel
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in
SECTION 10 51 13 Page 3 accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Types; G
SD-03 Product Data
Material; G
Locking Devices; G
Handles; G
Finish; G
Locker components; G
SD-04 Samples
Color chips; G
1.3 DELIVERY, HANDLING, AND STORAGE
Deliver lockers and associated materials in their original packages, containers, or bundles bearing the manufacturer's name and the name of the material. Protect from weather, soil, and damage during delivery, storage, and construction.
1.4 FIELD MEASUREMENTS
To ensure proper fits, make field measurements prior to the preparation of drawings and fabrication. Verify correct location
1.5 QUALITY ASSURANCE
1.5.1 Color Chips
Provide a minimum of three color chips, not less than 3 inches square, of each color scheduled.
Government may request performance-characteristic tests on assembled lockers. Tests and results must conform to FS AA-L-00486. Lockers not conforming will be rejected.
PART 2 PRODUCTS
2.1 TYPES
Locker must have the following type and size in the location and quantities indicated. Locker finish colors will be as scheduled.
2.1.1 Single-tier Lockers
Single-tier lockers must be as follows:
Type STL-1: Single-tier locker 12 inches wide, 15 inches deep, and 72 inches high, attached to 4-inch high base. Locker Body; 24 gage, 0.0239-inch.
SECTION 10 51 13 Page 4
2.1.2 Locker Benches
a. Free standing type; bench top of solid high density polyethylene (HDPE); painted steel pedestals.
b. Height: 17 minimum to 19 maximum.
c. Length: Per Drawings.
2.2 MATERIAL
2.2.1 Galvanized Steel Sheet
ASTM A653/A653M and ASTM A924/A924M, commercial quality, minimized spangle, galvanized steel sheet with not less than G60 zinc coating. Prepare surface of sheet for painting in accordance with ASTM D6386, Method A.
Minimum uncoated sheet thickness .
2.2.2 Chromium Coating
Nickel and chromium electrodeposited on the specified base metal. Conform to ASTM B456, SC-3, as applicable to the base metal.
2.2.3 Finish
FS AA-L-00486.
2.2.3.1 Color
As selected.
2.3 COMPONENTS
2.3.1 Built-In Locks
FS AA-L-00486. Provide locking devices as a padlock eye in the door latching mechanism.
2.3.2 Coat Hooks
FS AA-L-00486, zinc plated, 2 coat hooks.
2.3.3 Hat Shelf
FS AA-L-00486.
2.3.4 Door Handles
FS AA-L-00486. Provide zinc alloy or steel handles with a chromium coating.
2.3.5 Doors
FS AA-L-00486, not less than 0.0598 inch thick steel sheet.
2.3.5.1 Hinges
In addition to the requirements of FS AA-L-00486, provide 5-knuckle hinges, minimum 2 inches high. Fabricate knuckle hinges from not less than 0.0787
SECTION 10 51 13 Page 5 inch thick steel sheet. A full height piano hinge may be provided if standard with the manufacturer. Weld or bolt hinges to the door frame.
Weld, bolt, or rivet hinges to the door.
2.3.5.2 Latching Mechanisms
FS AA-L-00486.
2.3.6 Latch Strikes
FS AA-L-00486. Fabricate from not less than 0.0787 inch thick steel sheet, except latch strike may be continuous from top to bottom and fabricated as part of the door framing.
2.3.7 Silencers
FS AA-L-00486.
2.3.8 Back and Side Panels, Tops, and Bottoms
FS AA-L-00486, not less than 0.0474 inch thick steel sheet.
2.3.9 Sloping Locker Tops
Provide sloping locker tops in addition to the locker-section flat tops.
Sloping tops must be continuous in length. Provide fillers or closures at the exposed end of sloping tops. Fabricate sloping tops from not less than 0.0478-inch thick steel sheet.
2.3.10 Infill Panels
Provide metal infill panels and framing at all interior corners of adjoining lockers. panel infill to match gage and color of locker body.
2.3.11 Shelves
FS AA-L-00486. Fabricate from not less than 0.0598 inch thick steel sheet.
2.3.12 Base Panels
FS AA-L-00486.
2.3.13 Legs
Provide lockers without legs, as indicated.
2.3.14 Number Plates
FS AA-L-00486. Zinc. Provide consecutive numbers starting from 101.
2.3.15 Fastening Devices
Provide bolts, nuts, and rivets as specified in FS AA-L-00486.
PART 3 EXECUTION
3.1 ASSEMBLY AND INSTALLATION
Assemble lockers according to the locker manufacturer's instructions.
SECTION 10 51 13 Page 6
Align lockers horizontally and vertically. Secure lockers to wall and base with screws as indicated. Bolt adjacent lockers together. Adjust doors to operate freely without sticking or binding and to ensure they close tightly.
3.2 FIELD QUALITY CONTROL
3.2.1 Testing
Government may request performance-characteristic tests on assembled lockers in accordance with FS AA-L-00486. Lockers not conforming will be rejected.
3.2.2 Repairing
Remove and replace damaged and unacceptable portions of completed work with new.
3.2.3 Cleaning
Clean surfaces of the work, and adjacent surfaces soiled as a result of the work, in an approved manner. Remove equipment, surplus materials, and rubbish from the site.
-- End of Section --
SECTION 10 51 13 Page 7
PROVIDE CONTINUOUS AIR TIGHT SEAL
AT WALL TERMINATION TO METAL DECK
AND ENTIRE WALL PERIMETER.
CONTINUOUS ACOUSTICAL SEALANT TO
ACCOMODATE STRUCTURAL DEFLECTION
METAL DECK PER STRUCTURAL
NOTCH SHEETROCK TO FIT METAL DECK
PROFILE WITH GAP SIZED TO
ACCOMODATE STRUCTURAL DEFLECTION.
WHERE METAL DECK FLUTES
ARE PARALLEL TO WALL
ASSEMBLY, SEE DETAIL
G A
P 1/
2" M
IN
FASTEN GYPSUM BOARD TO STUD.
FASTENERS TO TRACK PROHIBITED.
MAINTAIN 1/2" GAP BETWEEN TOP OF
GYPSUM AND STRUCTURE ABOVE
SEALANT
GYPSUM
J BEAD
PROVIDE DEFLECTION TRACK AT
NON BEARING STUD WALLS
EXTENDING TO STRUCTURE ABOVE
UNLESS NOTED OTHERWISE.
MAINTAIN 1/2” GAP BETWEEN
TOP OF STUD AND TRACK ABOVE
G A
P 1/
2" M
IN
INSTALL DEFLECTION TRACK PER
MANUFACTURERS RECOMMENDATIONS
SEE
ASSEMBLY
TYPE
1/ 2"
M
IN
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
F-35 FUEL CELL MAINTENANCE FACILITY RENOVATION
021702
AECC511
/2 2/
:2 2:
P
M
JB
FG
BIDDER QUESTION
10/22/18
3" = 1'-0"
INTERIOR FRAMING DETAIL - PARTITION
DEFLECTION ATTACHMENT
3" = 1'-0"
INTERIOR ACOUSTIC DETAIL - PARTITION
DEFLECTION ATTACHMENT - NOT PARALLEL
TO FLUTES
9A
A810
9B A810
FRICTION FIT FIBERGLASS BATT
INSULATION TO FILL CAVITY
WHERE METAL DECK FLUTES
ARE NOT PARALLEL TO WALL
ASSEMBLY, SEE DETAIL
CONTINUOUS ACOUSTICAL SEALANT
FILL CAVITY WITH CONTINUOUS
ACOUSTICAL SEALANT TO ACCOMODATE
STRUCTURAL DEFLECTION
PROVIDE CONTINUOUS AIR TIGHT SEAL
AT WALL TERMINATION TO METAL DECK
AND ENTIRE WALL PERIMETER.
20 GAGE METAL CLOSURE PLATE.
SPAN METAL DECK FLUTE COMPLETELY
TO PROVIDE CONTINUOUS SEAL
1" MIN, TYP
1" MIN
TYP
METAL DECK PER STRUCTURAL
PER
ASSEMBLY
TYPE
PER
ASSEMBLY
TYPE
FOR TYPICAL
ANNOTATION
SEE DETAIL
AS REQ'D FOR
AIR TIGHT SEAL
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
F-35 FUEL CELL MAINTENANCE FACILITY RENOVATION
021702
AECC511
/2 2/
:2 2:
P
M
Designer
Author
BIDDER QUESTION
10/22/18
9C
A810 3" = 1'-0"
INTERIOR ACOUSTIC DETAIL - PARTITION
DEFLECTION ATTACHMENT - PARALLEL TO
FLUTES
A - TYPICAL
1. ASSEMBLIES ARE DIAGRAMS ONLY, DO NOT SCALE.
2. ASSEMBLIES ARE INTENDED TO DESCRIBE MATERIALS AND
THEIR RELATIONSHIP WITHIN A GIVEN CEILING, FLOOR, ROOF,
OR WALL. PENETRATIONS, JOINTS, FINISHES, AND
INTERSECTIONS BETWEEN ASSEMBLIES ARE NOT SHOWN.
3. SEE A0 SHEETS FOR ARCHITECTURAL NOTES, SHEET
SEQUENCE, AND ASSEMBLY TAG LEGENDS.
4. SEE A2 SHEETS FOR FLOOR PLAN ASSEMBLY LOCATIONS.
5. SEE A4 SHEETS FOR SECTION ASSEMBLY LOCATIONS.
6. SEE A5 SHEETS FOR EXTERIOR DETAILS.
7. SEE A8 SHEETS FOR INTERIOR ASSEMBLIES, INTERIOR
ASSEMBLY NOTES, AND INTERIOR DETAILS.
B - FRAMING
1. PROVIDE 20 GAGE METAL STUDS UNLESS NOTED
OTHERWISE.
2. EXTEND CONTINUOUS STUDS FROM FLOOR TO STRUCTURE
ABOVE UNLESS NOTED OTHERWISE.
3. PROVIDE MANUFACTURERS STANDARD DEFLECTION TRACK
AT NON-BEARING STUD WALLS EXTENDING TO STRUCTURE.
4. SPACE STUDS AT 24" ON CENTER FOR TYPICAL WALLS
UNLESS NOTED OTHERWISE.
5. SPACE STUDS AT 16" ON CENTER FOR WALLS WITH CERAMIC
TILE, MOISTURE RESISTANT GYPSUM, OR ABUSE/IMPACT
RESISTANT GYPSUM UNLESS NOTED OTHERWISE.
6. PROVIDE BACKING AT ASSEMBLY MOUNTED ACCESSORIES,
EQUIPMENT, AND FIXTURES.
7. PROVIDE BACKING AT OWNER FURNISHED AND/OR OWNER
INSTALLED ASSEMBLY MOUNTED ACCESSORIES,
EQUIPMENT, AND FIXTURES.
C - SHEATHING
1. PROVIDE TYPE 'X' GYPSUM BOARD PER SPECIFICATIONS.
2. PROVIDE CONTINUOUS GYPSUM BOARD FROM FLOOR TO
STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
3. PROVIDE GAP AT DEFLECTION TRACK PER MANUFACTURER
RECOMMENDATION. COORDINATE FIRE RATED AND SOUND
RATED CONDITIONS.
4. SEAL THROUGH WALL PENETRATIONS AT BOTH ABOVE
CEILING AND BELOW CEILING CONDITIONS.
5. PROVIDE CONTROL JOINTS IN GYPSUM BOARD AT 30'-0"
MAXIMUM SPACING OR PER UNITED STATES GYPSUM
ASSOCIATION.
D - EXTERIOR FINISHES
1. SEE MATERIAL SCHEDULE FOR FINISH INFORMATION
2. SEE ROOM SCHEDULE FOR INTERIOR FINISHES.
E - WATER RESISTANT ASSEMBLIES
1. PROVIDE MOISTURE RESISTANT GYPSUM BOARD WITHIN 4'-0"
OF PLUMBING FIXTURES.
2. PROVIDE MOISTURE RESISTANT GYPSUM BOARD IN JANITOR
ROOMS.
3. PROVIDE MOISTURE RESISTANT GYPSUM BOARD AT HEAD,
JAMB, AND SILL CONDITIONS OF EXTERIOR OPENINGS.
F - FIRE RATED ASSEMBLIES
1. SEE G1 SHEETS FOR CODE INFORMATION, CODE PLAN, AND
LOCATION OF FIRE RATED ASSEMBLIES.
2. ASSEMBLIES WITH GA FILE NUMBER SHALL BE
CONSTRUCTED IN ACCORDANCE WITH GYPSUM
ASSOCIATION GA-600-2015.
3. PROVIDE FIRE RESISTIVE RATED WOOD AND FIRE RESISTIVE
RATED PLYWOOD UNLESS NOTED OTHERWISE.
4. EXTEND CONTINUOUS FIRE RATED VERTICAL ASSEMBLIES
FROM TOP OF HORIZONTAL FIRE RATED ASSEMBLY BELOW
TO BOTTOM OF HORIZONTAL FIRE RATED ASSEMBLY ABOVE.
5. FIRE STOP PENETRATIONS THROUGH FIRE RATED
ASSEMBLIES.
G - WEATHER BARRIERS
1. BARRIER / RETARDER CONTINUITY IS CRITICAL FOR THE
PERFORMANCE AND DURABILITY OF THE ASSEMBLY.
2. FLASHING, SEALING, AND INSULATING TRANSITION SPACES
ARE CRITICAL COMPONENTS OF WATER, AIR, AND THERMAL
BARRIER CONTINUITY.
3. WATER RESISTIVE BARRIER COMPONENTS MUST BE
INSTALLED IN A SHINGLE FASHION (WEATHER LAPPED),
FROM FOOTING TO ROOF, WITH SUFFICIENT OVERLAP AND
NO EXPOSED CORNERS. AVOID TRAPPING MOISTURE IN
TIGHT SPACES OR CREATING FLAT HORIZONTAL AREAS THAT
CAN COLLECT WATER.
4. SOME PRODUCTS CAN SIMULTANEOUSLY ACT AS A WATER
RESISTIVE BARRIER, AIR BARRIER, AND/OR A VAPOR
RETARDER.
5. SUBSTITUTING ASSEMBLY COMPONENTS WITHOUT
ARCHITECTS APPROVAL CAN DRASTICALLY ALTER THE
DURABILITY AND ENERGY PERFORMANCE OF THE ASSEMBLY.
EXTERIOR ASSEMBLY NOTES
WX-8A EXTERIOR WALL EXISTING
COMPOSITE INSULATION VALUE
EXTERIOR
3" METAL
WALL PANEL
2X4 TREATED
WOOD BLOCKING
(2) LAYERS 3 1/2"
RIGID INSULATION
EXISTING 8" CMU
INTERIOR
VAPOR BARRIER
NEW 8" CMU AT INFILL.
CONSTRUCT PER S001
INTERIOREXTERIOR
EXISTING CMU
METAL FLASHING
2X4 TREATED WOOD
BLOCKING
ALUMINUM WINDOW
WINDOW BLIND, TYPICAL
CONTINUOUS SEALANT AND
BACKER ROD
EXISTING 3" METAL
WALL PANEL
3/4" TREATED PLYWOOD
FILL SHIM SPACE WITH SPRAY
FOAM
WX-8A
1/2" SOLID SURFACE TRIM
GROUT SOLID
2X TREATED WOOD
BLOCKING
1/4" X 6" FLAT PHILLIPS
TAPCON CONCRETE
SCREW @ 12" O.C.
(STAGGARED
INTERIOR
EXTERIOR
NEW ALUMINUM WINDOW
PRE-FINISHED METAL FLASHING;
SEAL TO EXTERIOR OF METAL
WALL PANEL AND EXTEND INTO
WINDOW OPENING TO TERMINATE
BEHIND WINDOW FRAME
2X4 TREATED WOOD BLOCKING
CONTINUOUS SEALANT
AND BACKER ROD
3/4" TREATED PLYWOOD
FILL SHIM SPACE WITH
SPRAY FOAM
TREATED BLOCKING TO
MATCH THICKNESS OF
ADJACENT METAL PANEL
WX-8A
1/2" SOLID SURFACE TRIM
1/4" X 6" FLAT PHILLIPS TAPCON
CONCRETE SCREW @ 12" O.C.
(STAGGARED
2X TREATED WOOD BLOCKING
INTERIOREXTERIOR
EXISTING CMU
METAL FLASHING
2x TREATED WOOD
BLOCKING CUT TO SLOPE
NEW ALUMINUM
WINDOW
CONTINUOUS SEALANT
AND BACKER ROD
3" METAL WALL PANEL
3/4" TREATED PLYWOOD
FILL SHIM SPACE WITH
SPRAY FOAM 3/16" TAPCON ANCHORS
AT 8" OC, MIN 1-1/2"
CONCRETE EMBED
CONTINUOUS SEALANT
SOLID SURFACE SILL
A500
WX-8A
GROUT SOLID
2X TREATED WOOD
BLOCKING
1/4" X 6" FLAT
PHILLIPS TAPCON
CONCRETE SCREW @
12" O.C. (STAGGARED
WX-8A
INTERIOREXTERIOR
WINDOW AS SPECIFIED
WINDOW BLIND, TYPICAL
1/2" SOLID SURFACE TRIM
CONTINUOUS SEALANT
FILL SHIM SPACE
WITH SPRAY FOAM
CONTINUOUS BACKER
ROD AND SEALANT
PRE-FINISHED METAL FLASHING
INTERIOR
EXTERIOR
WINDOW AS SPECIFIED
PRE-FINISHED METAL FLASHING; SEAL TO
EXTERIOR OF METAL WALL PANEL AND
EXTEND INTO WINDOW OPENING TO
TERMINATE BEHIND WINDOW FRAME
TREATED BLOCKING TO MATCH
THICKNESS OF ADJACENT METAL PANEL
CONTINUOUS SEALANT AND BACKER ROD
1/2" SOLID SURFACE TRIM
FILL SHIM SPACE WITH SPRAY FOAM
WX-8A
CONTINUOUS SEALANT
WX-8A
INTERIOREXTERIOR
WINDOW AS SPECIFIED
CONTINUOUS SEALANT
1/2" TREATED PLYWOOD
BULL NOSED SOLID
SURFACE WINDOW SILL
FILL SHIM SPACE WITH
SPRAY FOAM
CONTINUOUS BACKER
ROD AND SEALANT
PRE-FINISHED METAL
FLASHING
A500
1"
/2
FINISH PER MATERIAL SCHEDULE
INTERIOR
EXTERIOR
WX-8A
FINISH PER ROOM SCHEDULE
PRE-FINISHED METAL JOINT WITH
SEALANT BEAD. MATCH EXISTING
METAL PANEL COLOR.
2x TREATED WOOD BLOCKING
2x4 TREATED WOOD BLOCKING
CONTINUE AIR BARRIER ONTO
FACE OF EXISTING WOOD
FRAMING 3" MINIMUM
MATCH EXISTING WX-8A
INTERIOREXTERIOR
METAL FLASHING
2x TREATED WOOD
BLOCKING CUT TO SLOPE
NEW ALUMINUM WINDOW
CONTINUOUS SEALANT
AND BACKER ROD
3/4" TREATED
PLYWOOD
FILL SHIM SPACE WITH SPRAY FOAM 3/16" TAPCON ANCHORS
AT 8" OC, MIN 1-1/2"
CONCRETE EMBED
CONTINUOUS SEALANT
SOLID
SURFACE SILL
A500
MATCH
EXISTING
WX-8A
D ate
P roject N o.
A rchite cts E n g in e ers S urve yo rs
C o lle g e R oa d F a irb an ks A
K
907.452.1241 designalaska.com
21 M A
Y
F T
Q W
18-0205
A E
C C
S ht.
O f
354th C ivil E ngineer S quadron
E ielson A
F B
, A laska
P roject E ngineer
C hief E ngineer D raw n B y
D esigned B y R eference N o.
R ev D e scription
B y
D ate
10/22/2018 2:25:05 PM
JB
EX TER
IO
R D
ETA ILS - AS SEM
BL Y TYPE S
A
Q C
F / M
L M
F -35 FUEL C ELL M
AINT ENANCE F ACILITY RE NO
VATIO
N
3" = 1'-0"A500
1 EXTERIOR WINDOW DETAIL - HEAD AT NEW OPENING
3" = 1'-0"A500
2 EXTERIOR WINDOW DETAIL - JAMB AT NEW OPENING
3" = 1'-0"A500
3 EXTERIOR WINDOW DETAIL - SILL AT NEW OPENING
3" = 1'-0"A500
4 EXTERIOR WINDOW DETAIL - HEAD AT EXISTING OPENING
3" = 1'-0"A500
5 EXTERIOR WINDOW DETAIL - JAMB AT EXISTING OPENING
3" = 1'-0"A500
6 EXTERIOR WINDOW DETAIL - SILL AT EXISTING OPENING
6" = 1'-0"A500
7 INTERIOR CASEWORK DETAIL - SOLID SURFACE EDGE
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
D E S I G N
A L
A S
K A
REG ISTERED PROFESSIONAL ARCHITE
CT10/22/18
3" = 1'-0"A500
8 EXTERIOR PLAN DETAIL - DOOR AND WINDOW INFILL
3" = 1'-0"A500
9 EXTERIOR WINDOW DETAIL - SILL AT DOOR INFILL
INTERIOREXTERIOR
EXISTING CMU
METAL FLASHING
2X4 TREATED WOOD
BLOCKING
EXISTING 3" METAL
WALL PANEL
3/4" TREATED PLYWOOD
WX-8A
GROUT SOLID
2X TREATED WOOD
BLOCKING
DUCT INSULATION
1/4" X 6" FLAT PHILLIPS
TAPCON CONCRETE
SCREW @ 12" O.C.
(STAGGERED)
EXTERIOR
WX-8A
DUCT
HOOD
INTERIOR
SEALANT, TYP
SLOPE FINAL 36" DUCT, MN 2"
PER FOOT
SOLDER JOINTS WATER TIGHT
mpc Typewritten Text BIDDER QUESTION #32 RESPONSE: EXTERIOR HOOD PENETRATION DETAIL, LOUVER INSTALLATION SIMILAR mpc Line
| 09 96 00 |
| HIGH-PERFORMANCE COATINGS |
| 09 96 00 - HIGH-PERFORMANCE COATINGS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY CONTROL |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 PERFORMANCE REQUIREMENTS |
| 2.2 MATERIALS |
| 2.2.1 Epoxy Coatings |
| 2.2.1.1 Concrete Surface Coatings |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 Surface Preparation |
| 3.1.2 Cleaning |
| 3.1.3 Concrete Surfaces |
| 3.1.3.1 Concrete Substrates |
| 3.1.4 Coating Material Preparation |
| 3.1.4.1 Thinning |
| 3.1.4.2 Tinting |
| 3.2 APPLICATION |
| 3.2.1 Brush Application |
| 3.2.2 Roller Application |
| 3.2.3 Spray Application |
| 3.3 FIELD QUALITY CONTROL |
| 3.3.1 Field Test |
| 3.3.2 Repairing |
| 10 51 13 |
| METAL LOCKERS |
| 10 51 13 - METAL LOCKERS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, HANDLING, AND STORAGE |
| 1.4 FIELD MEASUREMENTS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Color Chips |
| PART 2 PRODUCTS |
| 2.1 TYPES |
| 2.1.1 Single-tier Lockers |
| 2.1.2 Locker Benches |
| 2.2 MATERIAL |
| 2.2.1 Galvanized Steel Sheet |
| 2.2.2 Chromium Coating |
| 2.2.3 Finish |
| 2.2.3.1 Color |
| 2.3 COMPONENTS |
| 2.3.1 Built-In Locks |
| 2.3.2 Coat Hooks |
| 2.3.3 Hat Shelf |
| 2.3.4 Door Handles |
| 2.3.5 Doors |
| 2.3.5.1 Hinges |
| 2.3.5.2 Latching Mechanisms |
| 2.3.6 Latch Strikes |
| 2.3.7 Silencers |
| 2.3.8 Back and Side Panels, Tops, and Bottoms |
| 2.3.9 Sloping Locker Tops |
| 2.3.10 Infill Panels |
| 2.3.11 Shelves |
| 2.3.12 Base Panels |
| 2.3.13 Legs |
| 2.3.14 Number Plates |
| 2.3.15 Fastening Devices |
| PART 3 EXECUTION |
| 3.1 ASSEMBLY AND INSTALLATION |
| 3.2 FIELD QUALITY CONTROL |
| 3.2.1 Testing |
| 3.2.2 Repairing |
| 3.2.3 Cleaning |
| BIDDER QUESTION_A500 and A810 DETAILS |
| Sheets |
| B001 - BIDDER QUESTION |
| B002 - BIDDER QUESTION |
A500
| BIDDER QUESTION-32_EXTERIOR HOOD PENETRATION DETAIL |
| Drafting Views (A5 Exterior Details) |
| ADENDA - EXTERIOR HOOD DETAIL |
Grp3 QA
File details come from the government source that posted it.