This is a Contract Data Requirements List (CDRL) for the TRITS (Thermal Reconnaissance Inertial Test System) contract (M6785426R5100) with the Marine Corps Systems Command (MARCORSYSCOM), Product Manager Maintenance Support Systems. The document establishes 29 data items across two exhibits (A and B) that the contractor must deliver throughout the contract lifecycle.
Exhibit A contains 17 data items covering management, technical, and training deliverables. Key deliverables include monthly status reports, conference agendas and minutes, a hazardous material management program plan, failure summary and analysis reports, quality assurance surveillance plans, software documentation (version descriptions and API documentation), product drawings and models (due 44 working days after award), OEM technical manuals, and a comprehensive series of technical manual iterations from preliminary draft through final reproducible copy. Training-related deliverables include commercial training products, lesson plans, student outlines, media in PowerPoint format, and performance evaluations, with initial instructor and key personnel training (I&KPT) scheduled at Twenty-nine Palms, California. Additional items include calibration procedures and certificates, vulnerability scan compliance reports, and safety assessment reports. Exhibit B contains 12 data items primarily focused on logistics and provisioning products, including provisioning plans, parts lists, long lead time items lists, tools and test equipment lists, common and bulk items lists, design change notices, LSA-036 pre-screening data, engineering data for provisioning, spares acquisition integrated with production data, items logistics data records, and obsolescence alert notices. Monthly integrated program management data and analysis reports (IPMDAR) are required, along with IUID marking and verification reports due before first unit delivery. Most documents require distribution statement C marking and electronic submission in Microsoft Office or PDF formats, with draft and final copies required for most items. Submission timelines vary from 5 days prior to conferences for agendas to 90 days post-contract award for draft technical manuals, with many items requiring government acceptance before final submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoD COMMUNITY ONLY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________
TM- _________
OTHER ________X_____
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A001
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-ADMN-81249A
5. CONTRACT REFERENCE
SOW PARA 3.2.1 and 3.2.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE BLK 16 See BLK 16 b. COPIES
8. APP CODE C – SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A N/A SEE BLK 16 Reg Repro
16. REMARKS
BLK 8- SEE BLK 12 & 13 REMARKS BELOW
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH DOCUMENT
REFERENCES AND SECURITY CLASSIFICATION GUIDES.
BLK 10 – ONE CONFERENCE AGENDA PER MEETING AS REQUIRED.
BLK 12 - SUBMIT 5 DAYS PRIOR TO CONFERENCE.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT
ACCEPTANCE OF DRAFT AGENDA.
BLK 14 - ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT. FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF
THE CONTRACT FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
PROJECT
1 1
OFFICER
LOGISTICIAN 1 1
ENGINEER 1 1
EQUIPMENT
SPECIALIST
15. TOTAL 4 4
G. PREPARED BY
Kevin Smidt
H. DATE
1 October 2025
I. APPROVED BY J. DATE
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __1__ of __38__ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER ________X____
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A002
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-ADMN-81250A
5. CONTRACT REFERENCE
SOW PARA 3.2.1 and 3.2.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT SEE BLK 16 SEE BLK 16 b. COPIES
a. ADDRESSEE
Draft
A N/A SEE BLK 16 Reg Repro
16. REMARKS
BLK 8- SEE BLK 12 & 13 REMARKS BELOW
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH DOCUMENT
REFERENCES AND SECURITY CLASSIFICATION GUIDES.
BLK 10 – ONE SET OF CONFERENCE MINUTES PER OCCURRENCE.
BLK 12 - SUBMIT 5 DAYS POST CONFERENCE.
ACCEPTANCE OF DRAFT MINUTES.
BLK 14 - ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT. FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF
THE CONTRACT FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
ENGINEER 1 1
EQUIPMENT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __2__ of __38__ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reportingburden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN yourform to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A003
2. TITLE OF DATA ITEM
MONTHLY STATUS REPORT
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
SOW PARA 3.2.1
6. REQUIRING OFFICER
MARCORSYSCOM (PdM
MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MONTHLY SEE BLK 16 b. COPIES
N/A SEE BLK 16 SEE BLK 16 Reg Repr o
16. REMARKS
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH DOCUMENT
REFERENCES AND SECURITY CLASSIFICATION GUIDES.
BLK 11 – DATE OF FIRST SUBMISSION SHALL BE THE END OF THE FIRST
MONTH AFTER CONTRACT AWARD. EX: IF AWARDED ON THE FIRST OF THE
MONTH, SUBMISSIONS WILL BE DUE THE LAST DAY OF THE MONTH.
BLK 12 – DATE OF FIRST SUBMISSION SHALL BE 30 (OR 31 DEPENDING ON THE
MONTH) DAYS AFTER CONTRACT AWARD.
BLK 13 – SUBSEQUENT SUBMISSION SHALL BE THE END OF EVERY MONTH.
BLK 14 - ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT. FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF
THE CONTRACT FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
ENGINEER 1 1
EQUIPMENT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __3__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER ________X____
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO.
A004
2. TITLE OF DATA ITEM
HAZARDOUS MATERIAL MANAGEMENT PROGRAM PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SAFT-80102B
5. CONTRACT REFERENCE
SOW PARA 3.5.3
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONCE SEE BLK 16 b. COPIES
A N/A SEE BLK 16 Reg Repr o
16. REMARKS
BLK 8- SEE BLK 12 & 13 REMARKS BELOW
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
BLK 12 – DOCUMENT SHALL BE DELIVERED WITHIN TIMELINES AGREED UPON
DURING THE POST AWARD MEETING.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT
ACCEPTANCE.
BLK 14 - ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT. FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF
THE CONTRACT FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
ENGINEER 1 1
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __4__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER _______X______ _ _
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A005
2. TITLE OF DATA ITEM
FAILURE SUMMARY AND ANALYSIS REPORT
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SESS-80255A
5. CONTRACT REFERENCE
SOW PARA 4.0.1
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
8. APP CODE C - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
o
BLK 8- SEE BLK 12 & 13 REMARKS BELOW BLK 9 - THE FOLLOWING
INFORMATION SHALL BE ADDED TO THE COVER SHEET OF THE
DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION AUTHORIZED
TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER
REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH DOCUMENT
REFERENCES AND SECURITY CLASSIFICATION GUIDES.
DESTRUCTION NOTICE: DESTROY BY ANY METHOD THAT WILL PREVENT
DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THIS DOCUMENT.
BLK 12 – DRAFT SHALL BE DELIVERED AT POST AWARD CONFERENCE.
ACCEPTANCE.
BLK 14 - SUBMISSION SHALL BE PROVIDED IN BOTH PRINTED AND
ELECTRONIC FORMATS. THE ELECTRONIC FORMAT SHALL BE IN EDITABLE
PORTABLE DOCUMENT FORMAT (PDF). FOR ADDRESSEE INFORMATION SEE
SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
LOGISTICIAN 1 1
ENGINEER 1 1
EQUIPMENT
15. TOTAL 3 3
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __5__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_____X______
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A006
2. TITLE OF DATA ITEM
QUALITY ASSURANCE SURVEILLANCE PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-IPSC-81442A
5. CONTRACT REFERENCE
SOW PARA 3.6
6. REQUIRING OFFICER
MARCORSYSCOM (PdM
MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES o
16. REMARKS
BLK 4 - CONTRACTOR FORMAT IS ACCEPTABLE.
BLK 8- SEE BLK 12 & 13 REMARKS BELOW
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
BLK 12 – DRAFT WILL BE DELIVERED AT POST AWARD CONFERENCE
ACCEPTANCE
BLK 14 – ELECTRONIC COPY SHALL BE BY E-MAIL IN MICROSOFT
OFFICE/WORD FORMAT. FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF
THE CONTRACT FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
ENGINEER 1 1
COORDINATOR
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __6__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_____X______
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A007
2. TITLE OF DATA ITEM
SOFTWARE VERSION DESCRIPTION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-IPSC-81442A
5. CONTRACT REFERENCE
SOW PARA 3.7.1
6. REQUIRING OFFICER
MARCORSYSCOM (PdM
MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE BLK 16 b. COPIES o
16. REMARKS
BLK 4 - CONTRACTOR FORMAT IS ACCEPTABLE.
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO:
COMMANDER, MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER,
MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-
6050. EXPORT CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH
DOCUMENT REFERENCES AND SECURITY CLASSIFICATION GUIDES.
BLK 13 - UPDATED SVD WILL BE SUBMITTED WITH EACH SOFTWARE RELEASE.
BLK 14 – FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT
FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __6__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER__X_____
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A008
2. TITLE OF DATA ITEM
SOFTWARE APPLICATION
PROGRAM INTERFACE (API)
DOCUMENTATION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 3.7.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT AS REQ SEE BLK 16 b. COPIES
8. APP CODE C – SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
BLK 4 - CONTRACTOR FORMAT IS ACCEPTABLE. THE DOCUMENT SHALL CONTAIN THE
SOFTWARE APPLICATION PROGRAM INTERFACE (API) FOR INTERFACING WITH THE TRITS
INTERNAL TEST INTRUMENTATION. THE API SHALL CONTAIN ALL AVAILABLE
FUNCTIONS AND COMMANDS FOR EACH INSTRUMENT. THE DOCUMENT SHALL CONTAIN
DETAILED INFORMATION ON THE PROCESS FOR IMPLEMENTING THE API IN A
STANDALONE APPLICATION, SUCH AS A LOCAL PYTHON OR .NET APPLICATION.
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEET OF THE
DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION AUTHORIZED TO U.S.
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
VA 22135-6050. EXPORT CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH
BLK 12 – DOCUMENT SHALL BE DELIVERED WITHIN TIMELINES AGREED UPON DURING
THE POST AWARD MEETING.
BLK 13 – UPDATED SOFTWARE API DOCUMENT WILL BE SUBMITTED IF THERE IS A
CHANGE TO THE API IN FUTURE OEM SOFTWARE RELEASES WITHIN 30 DAYS OF
SOFTWARE DELIVERY.
BLK 14 – FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR
DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
PROJECT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __7__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TOP ____X_____ TM- _________ OTHER __________ _ _ _ _
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A009
2. TITLE OF DATA ITEM
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-SESS-81000F
5. CONTRACT REFERENCE
SOW PARA 3.8.1
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD ONCE SEE BLK 16 b. COPIES
8. APP CODE C. - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
A N/A N/A Reg Repr o
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
BLOCK 12 – THE CONTRACTOR SHALL SUBMIT THE FINAL DRAWING PACKAGE WITHIN
44 WORKING DAYS OF CONTRACT AWARD.
BLOCK 14 – THE FINAL DRAWINGS SHALL BE DELIVERED VIA CD/DVD. FOR ADDRESSEE
INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
ENGINEER 1 1
EQUIPMENT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __8__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_________X______________
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A010
2. TITLE OF DATA ITEM
OEM TECHNICAL MANUAL(s)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-80527D
5. CONTRACT REFERENCE
SOW PARA 4.1.1
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
N/A N/A
SEE BLK 16
Reg Repr
BLK 9 – THE CONTRACTOR SHALL IDENTIFY COPYRIGHTED MATERIAL IAW MIL-PRF-
32216A AND FURNISH THE APPROPRIATE COPYRIGHT RELEASE GIVING THE
GOVERNMENT PERMISSION TO REPRODUCE, UPDATE, OR CHANGE THE DATA
CONTAINED IN THE OEM TECHNICAL MANUAL(S) FOR GOVERNMENT USE ONLY. WHEN
THE CONTRACTOR USES A MANUAL THAT COVERS ANOTHER CONTRACTOR’S
COMPONENT(S) OR A PORTION THEREOF AND THE CONTRACTOR’S MANUAL CONTAINS
COPYRIGHTED MATERIAL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
A COPYRIGHT RELEASE FROM THE CONTRACTOR AND PROVIDING THE COPYRIGHT
RELEASE TO THE GOVERNMENT. EXPORT CONTROL WARNINGS WILL BE APPLIED IN
ACCORDANCE WITH DOCUMENT REFERENCES AND SECURITY CLASSIFICATION GUIDES.
BLK 12 - THE OEM TM SHALL BE DELIVERED WITH THE BID SAMPLES IF AVAILABLE
OR WITHIN TIMELINES AGREED UPON DURING THE POST AWARD MEETING.
BLK 13 –THE OEM TM SHALL BE DELIVERED WITH THE BID SAMPLES IF AVAILABLE OR
WITHIN TIMELINES AGREED UPON DURING THE POST AWARD MEETING.
BLK 14 - SUBMISSION SHALL BE PROVIDED IN ELECTRONIC FORMAT THE ELECTRONIC
FORMAT SHALL BE IN EDITABLE PORTABLE DOCUMENT FORMAT (PDF FOR ADDRESSEE
INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
LOGISTICIAN – ELECTRONIC
PROJECT OFFICER – ELECTRONIC
EQUIPMENT SPECIALIST - ELECTRONIC
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __9__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER_________X______________
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A011
2. TITLE OF DATA ITEM
INITIAL TECHNICA L MANUAL OUTLINE
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX SEE BLK 16 SEE BLK 16 b. COPIES
8. APP CODE C - SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
BLK 10 – THE INITIAL TM OUTLINE SHALL BE SUBMITTED ONCE, UNLESS SIGNIFICANT
REWORK IS REQUIRED.
BLK 12 – THE DRAFT INITIAL TM OUTLINE SHALL BE SUBMITTED WITHIN 10 DAYS OF THE
POST AWARD MEETING TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE
TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE DELIVERABLE.
BLK 13 - THE FINAL INITIAL TM OUTLINE SHALL BE RE-SUBMITTED TO ADDRESS ANY
COMMENTS FROM THE PROGRAM OFFICE WITHIN 10 DAYS OF THE APPROVED DRAFT VIA
E-MAIL OR DOD-APPROVED FILE TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE
DELIVERABLE.
BLK 14 FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __10__ of _38___ Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER_________________
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A012
2. TITLE OF DATA ITEM
PRELIMINA RY DRAFT TECHNICAL MANUAL
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX SEE BLK 16 SEE BLK 16 b. COPIES
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
BLK 10 – THE PRELIMINARY DRAFT TM OUTLINE SHALL BE SUBMITTED ONCE, UNLESS
SIGNIFICANT REWORK IS REQUIRED.
BLK 12 – THE DRAFT PRELIMINARY DRAFT TM SHALL BE SUBMITTED WITHIN 60 DAYS OF
THE CONTRACT AWARD VIA E-MAIL OR DOD-APPROVED FILE TRANSFER WEBSITE
DEPENDING ON THE SIZE OF THE DELIVERABLE.
BLK 13 - THE FINAL PRELIMINARY DRAFT TM SHALL BE RE-SUBMITTED TO ADDRESS ANY
COMMENTS FROM THE PROGRAM OFFICE WITHIN 10 DAYS OF THE APPROVED DRAFT VIA
DELIVERABLE
BLK 14 – FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR
PROJECT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __11__ of _38___ Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER __________ _ _ _ _
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A013
2. TITLE OF DATA ITEM
DRAFT TECHNICAL MANUAL
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
A N/A
SEE BLK 16
Reg Repr
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
BLK 12 – THE DRAFT TM SHALL BE SUBMITTED WITHIN 90 DAYS OF THE CONTRACT
AWARD.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT ACCEPTANCE.
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE TRANSFER
WEBSITE DEPENDING ON THE SIZE OF THE DELIVERABLE. FOR ADDRESSEE
INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
PROJECT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __12__ of _38___ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER____________________ _
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A014
2. TITLE OF DATA ITEM
FINAL DRAFT TECHNICA L MANUAL (FDTM)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
BLK 12 – THE DRAFT FINAL DRAFT TM SHALL BE SUBMITTED AT LEAST 10 WORKING
DAYS PRIOR T0 TM VERIFICATION.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT ACCEPTANCE VIA
DELIVERABLE.
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE TRANSFER
INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
PROJECT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __13__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- ___X______ OTHER _________ _ _ _ __
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A015
2. TITLE OF DATA ITEM
SIGN-OFF COPY TECHNICAL MANUAL (SOCTM)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PRODUCT MANGER, MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO,
BLK 12 – THE DRAFT SIGN-OFF COPY TECHNICAL MANUAL SHALL BE SUBMITTED TO THE
GOVERNMENT 15 WORKING DAYS AFTER THE GOVERNMENT SUBMITS THE FINAL DRAFT
TECHNICAL MANUAL (FDTM) REVIEW AND APPROVAL VIA E-MAIL OR DOD-APPROVED
FILE TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE DELIVERABLE.
BLK 13 - FINAL SIGN-OFF COPY TECHNICAL MANUAL (SOCTM) DATE WILL BE
DETERMINED AFTER GOVERNMENT ACCEPTANCE VIA E-MAIL OR DOD-APPROVED FILE
TRANSFER WEBSITE DEPENDING ON THE SIZE OF THE DELIVERABLE.
BLK 14 - TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE TRANSFER
INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
PROJECT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __14__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TM- ___X______
OTHER _________
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A016
2. TITLE OF DATA ITEM
FINAL REPRODUCIBLE
COPY (FRC) – TECHNICA L MANUAL
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-TMSS-81675
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES o
16. REMARKS
BLK 8- SEE BLK 12 & 13 REMARKS BELOW
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEE
OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PM SUPPLY & MAINTENANCE SYSTEMS,
2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT CONTROL WARNINGS
WILL BE APPLIED IN ACCORDANCE WITH DOCUMENT REFERENCES AND
SECURITY CLASSIFICATION GUIDES.
BLK 12 – THE FINAL REPRODUCIBLE COPY (FRC) - TECHNICAL MANUAL (TM)
SHALL BE DELIVERED TO THE GOVERNMENT 10 WORKING DAYS AFTER THE
GOVERNMENT SUBMITS THE SOCTM APPROVAL WITH PM SIGNATURE.
BLK 13 - SPECIFIED DATE WILL BE DETERMINED AFTER GOVERNMENT
ACCEPTANCE VIA E-MAIL OR DOD-APPROVED FILE TRANSFER WEBSITE
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE
TRANSFER WEBSITE, DEPENDING ON THE SIZE OF THE DELIVERABLE. FOR
ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR
DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
EQUIPMENT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __15__ of _38___ Pages
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER _________
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A017
2. TITLE OF DATA ITEM : SETUP AND OPERATING
INSTRUCTIONS FOR TEST PROGRAM
SETS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE
SOW PARA 4.1.2
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES o
16. REMARKS
BLK 8- SEE BLK 12 & 13 REMARKS BELOW
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER
SHEET OF THE DELIVERABLE: DISTRIBUTION STATEMENT C: DISTRIBUTION
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANAGER MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-
BLK 12 – THE SETUP AND OPERATING INSTRUCTIOSN FOR TEST PROGRAM SETS
SHALL BE DELIVERED TO THE GOVERNMENT VIA E-MAIL OR DOD-APPROVED
FILE TRANSFER WEBSITE, DEPENDING ON THE SIZE OF THE DELIVERABLE WITH
THE BID SAMPLES OR DELIVERED WITHIN TIMELINES AGREED UPON DURING
THE POST AWARD MEETING.
ACCEPTANCE VIA E-MAIL OR DOD-APPROVED FILE TRANSFER WEBSITE
BLK 14 – TO THE RECIPIENTS BELOW VIA E-MAIL OR DOD-APPROVED FILE
TRANSFER WEBSITE, DEPENDING ON THE SIZE OF THE DELIVERABLE. FOR
ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR
DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
EQUIPMENT
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __15__ of _38___ Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER __________
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A018
2. TITLE OF DATA ITEM
COMMERCIAL TRAINING PRODUCTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 4.2.1
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ONCE SEE BLK 16 b. COPIES
N/A N/A SEE BLK 16 Reg Repr
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO:
COMMANDER, MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER,
MAINTENANCE SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-
BLK 12 – DRAFT COMMERCIAL TRAINING PRODUCTS SHALL BE DELIVERED
WITHIN TIMELINES AGREED UPON DURING THE POST AWARD MEETING.
BLK 13 - THE FINAL COMMERCIAL TRAINING PRODUCTS SHALL BE DELIVERED
AT A SPECIFIED DATE AFTER GOVERNMENT ACCEPTANCE VIA ELECTRONIC
FORMATS. ELECTRONIC FORMAT SHALL BE IN EDITABLE PORTABLE
DOCUMENT FORMAT (PDF)..
BLK 14 - SUBMISSION SHALL BE VIA ELECTRONIC FORMATS. ELECTRONIC
FORMAT SHALL BE IN EDITABLE PORTABLE DOCUMENT FORMAT (PDF). FOR
ADDRESSEE INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR
DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
LOGISTICIAN - ELECTRONIC
MPT LEAD – ELECTRONIC
MPT LEAD 1 1
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __16__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER ________X____ _ _ __
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A019
2. TITLE OF DATA ITEM
LESSON PLANS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) DI-PSSS-81523D
5. CONTRACT REFERENCE
SOW PARA 4.2.5
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX ASREQ SEE BLK 16 b. COPIES o
BLK 4 - THE LESSON PLANS SHALL BE DEVELOPED IAW NAVMC 1553.1A
BLK 9 - THE FOLLOWING INFORMATION SHALL BE ADDED TO THE COVER SHEE
AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS.
OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO: COMMANDER,
MARINE CORPS SYSTEMS COMMAND, PRODUCT MANGER, MAINTENANCE
SUPPORT SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050. EXPORT
BLK 12 - THE DRAFT LESSON PLANS SHALL BE DELIVERED WITHIN TIMELINES
AGREED UPON DURING THE POST AWARD MEETING.
BLK 13 - THE FINAL LESSON PLANS SHALL BE DELIVERED WITHIN TIMELINES
BLK 14 - SUBMISSION SHALL BE VIA ELECTRONIC MAIL (E-MAIL). THE
SUBMISSION SHALL BE PREPARED AND DELIVERED IN CURRENT MICROSOFT
OFFICE SUITE. FOR ADDRESSEE INFORMATION SEE SECTION 'G' OF THE
CONTRACT FOR DISTRIBUTION ADDRESSES AND CONTACT INFORMATION.
LOGISTICIAN - ELECTRONIC
MPT LEAD – ELECTRONIC
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __17__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215
Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
OTHER
________X____
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1. DATA ITEM
NO. A020
2. TITLE OF DATA ITEM
STUDENT OUTLINES
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition
Document No.) N/A
5. CONTRACT REFERENCE
SOW PARA 4.2.6
6. REQUIRING OFFICER
MARCORSYSCOM (PdM MSS)
7. DD 250 REQ. 9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX ONE TIME SEE BLK 16 b. COPIES o
GOVERNMENT AGENCIES AND THEIR CONTRACTORS. OTHER REQUESTS FOR THIS
DOCUMENT MUST BE REFERRED TO: COMMANDER, MARINE CORPS SYSTEMS COMMAND,
PM SUPPLY & MAINTENANCE SYSTEMS, 2200 LESTER STREET, QUANTICO, VA 22135-6050.
EXPORT CONTROL WARNINGS WILL BE APPLIED IN ACCORDANCE WITH DOCUMENT
REFERENCES AND SECURITY CLASSIFICATION GUIDES.
DESTRUCTION NOTICE: DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF
CONTENTS OR RECONSTRUCTION OF THIS DOCUMENT.
BLK 12 - THE DRAFT STUDENT OUTLINES SHALL BE DELIVERED WITHIN TIMELINES
BLK 13 - THE FINAL STUDENT OUTLINES SHALL BE DELIVERED WITHIN TIMELINES
AGREED UPON DURING THE POST AWARD MEETING.
BLK 14 - SUBMISSION SHALL BE VIA ELECTRONIC MAIL (E-MAIL). THE SUBMISSION SHALL
BE PREPARED AND DELIVERED IN CURRENT MICROSOFT OFFICE SUITE. FOR ADDRESSEE
INFORMATION SEE SECTION 'G' OF THE CONTRACT FOR DISTRIBUTION ADDRESSES AND
CONTACT INFORMATION.
LOGISTICIAN - ELECTRONIC
Kevin Smidt
H. DATE
1 October 2025
DD Form 1423– 1, FEB 2001 Previous editions are obsolete Page __18__ of _38___ Pages
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork
Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM- _________ OTHER ________X____ _ _ __
D. SYSTEM / ITEM
TRITS
E. CONTRACT / PR NO.
M6785426R5100
F. CONTRACTOR
TBD
1.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .