Exhibit R Well Completion Report.pdf

PDF 76 KB Posted

Attached to
Installation of Bedrock Wells at Booster Neutrino Beam (BNB)
Solicitation number
ESH_351002_DA
Issued by

About this file

This is a well completion report form from the Illinois Environmental Protection Agency used to document the technical details of well installation and construction. The form captures comprehensive information about monitoring well installation including site location coordinates, personnel involved (surveyors, contractors, geologists), drilling specifications, and detailed measurements of the well components.

The form requires documentation of critical well construction details including annular space specifications, elevations and depths of various well components (protective casing, riser pipe, screens, etc.), construction materials used (SS304, SS316, PTFE, or PVC options), and installation methods for surface seals, annular sealants, bentonite seals, and sand packs. The form includes a technical diagram showing the typical well construction design and includes fields for recording specific measurements like borehole diameter, riser pipe dimensions, screen lengths, and slot sizes. This appears to be an exhibit document related to a solicitation for installing bedrock monitoring wells at Fermilab's Booster Neutrino Beam facility.

View the file

Other files

File Type Posted
Rev Exhibit H Performance Bond FL-40_FFDG.pdf PDF
Amendment 01 to RFP 351002.pdf PDF
Rev Exhibit J Statement and Acknowledgment (SF1413-23)_FFDG.pdf PDF
Rev Exhibit E Construction Insurance Requirements (01-2025)_FFDG.pdf PDF
Rev Exhibit F Bond Bid FL-41_FFDG.pdf PDF
Rev Exhibit L SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Rev Exhibit B Section 010010_General_Requirements_BNB Bedrock Wells_rev3_FFDG.pdf PDF
Rev Exhibit K Proposal Certifications Form PUR-466_FFDG.pdf PDF
QandA_RFP 351002.pdf PDF
Rev Exhibit G Payment Bond FL-42_FFDG.pdf PDF
Rev Exhibit D General Terms and Conditions for Construction (01-2025)_FFDG.pdf PDF
Rev Exhibit C Section 013100_11-21-2024 FermiForward.pdf PDF
Exhibit D FRA General Terms and Conditions for Construction (03.2024).pdf PDF
Exhibit E Construction Insurance Requirements 2024.pdf PDF
Exhibit C Section 013100_ESH_Requirements_BNB_Bedrock_Wells.pdf PDF
Exhibit S Director Safety Letter.pdf PDF
Summary of Required Solicitation Documents.pdf PDF
2.0 Price Proposal Form.pdf PDF
Exhibit P Figure_2-BNB_Work_Area.pdf PDF
Exhibit O Figure 1-Map-Location_BNB-MI12.pdf PDF
1.0 Request for Proposal_ESH_351002_DA.pdf PDF
Exhibit G Payment Bond FL-42 (Rev 12.22).pdf PDF
Exhibit K Proposal Certifications Form PUR-466 Rev 1 (10142021).pdf PDF
Exhibit B Section 010010_General_Requirements_BNB Bedrock Wells_rev3.pdf PDF
Exhibit L Subcontractor Annual Representations and Certifications (SARC) (Rev. 3).pdf PDF
Exhibit A SOW-Bedrock_MWs_for_BNB_R2.pdf PDF
Exhibit N Sample Subcontract.pdf PDF
Exhibit M Davis Bacon Wage Rates IL20240011 Modification 17 11-15-2024.pdf PDF
Exhibit H Performance Bond FL-40 (Rev 12.22).pdf PDF
Exhibit F Bid Bond FL-41 (Rev 12.22).pdf PDF
Exhibit Q S-1248 Final Soil Boring Log.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
Exhibit I Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit J Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois Environmental Protection Agency Well Completion Report

Site Na State Plane C

Well #: _____________

Borehole #: __________

Surve

Drilli

Cons

Drilli

Logg

Repo Comp

AN

WELL CO

Protective C Riser Pipe A Riser Pipe B Screen

Well Comple Site Number: __________________________ County: __________________ me: ___________________________________________________________ o ' " o ' " oordinate: X _____ Y _____ (or) Latitude: ____ ____ ____ Longitude: ____ ____ ____ yed by: ______________________________________ ng Contractor: _________________________________ ulting Firm: ___________________________________ ng Method: ___________________________________ ed By: _______________________________________ rt Form leted By: _____________________________________

IL Registration #: _______________________________

Driller: ________________________________________

Geologist: ______________________________________

Drilling Fluid (Type): _____________________________

Date Started: ____________ Date Finished: ___________

Date: _____________________

NULAR SPACE DETAILS Elevations Depths (.01ft.)

(MSL)* (BGS)

______ _______ Top of Protective Casing

______ _______ Top of Riser Pipe

______ _______ Ground Surface

______ _______ Top of Annular Sealant

Static Water Level ______ _______ (After Completion)

______ _______ Top of Seal

______ _______ Top of Sand Pack

______ _______ Top of Screen

______ _______ Bottom of Screen

______ _______ Bottom of Well

______ _______ Bottom of Borehole

* Referenced to a National Geodetic Datum

CASING MEASURMENTS

Diameter of Borehole (inches) Type of Surface Seal: __________________

Type of Annular Sealant: _______________

Installation Method: _________________

Setting Time: ______________________

Type of Bentonite Seal - - Granular, Pellet, Slurry (Choose One)

Installation Method: _________________

Setting Time: ______________________

Type of Sand Pack: ____________________

Grain Size: _______ (Sieve Size)

Installation Method: ________________

Type of Backfill Material: ______________ (if applicable)

Installation Method: _________________ ID of Riser Pipe (inches) Protective Casing Length (feet) Riser Pipe Length (feet) Bottom of Screen to End Cap (feet) Screen Length (1st slot to last slot) (feet) Total Length of Casing (feet) Screen Slot Size ** **Hand-Slotted Well Screens are Unacceptable

NSTRUCTION MATERIAL

(Choose one type of material for each area) asing SS304, SS316, PTFE, PVC, or Other bove W.T. SS304, SS316, PTFE, PVC, or Other elow W.T. SS304, SS316, PTFE, PVC, or Other

SS304, SS316, PTFE, PVC, or Other tion Form (revised 02/06/02)

casing: 4
riser-above: 4
riser-below: 4
screen: 4
Site-Number:
County:
Well-No:
Site-Name:
Borehole-No:
X-Coord:
Y-Coord:
Lat-Deg:
Lat-Min:
Lat-Sec:
Long-Deg:
Long-Min:
Long-Sec:
Surveyor:
Drill-Coord:
Consult-Firm:
Drill-Method:
Logged-by:
Completed-By:
IL-Registration:
Driller:
Geologist:
Drill-Fluid:
Date-Start:
Date-Finished:
Date:
Type-Seal: Concrete
Annular-Sealant: Bentonite Slurry
Install-Method: Tremie Pipe
Set-time: 24 Hours
Install-Method2: Poured or Tremie Pipe
Set-Time: 1 hour
Sand-Type:
Grain-Size: 20
Install-Method3: Poured or Tremie Pipe
Backfill: N/A
Install-Method-Backfill: N/A
field1:
field2: -3.50
field3:
field4: -3
field5:
field6: 0
field7:
field8: 1
field9:
field10: TBD
field11:
field12: 57.25
field13:
field14: 59.25
field15:
field16: 61.25
field17:
field18: 66.25
field19:
field20: 66.5
field21:
field22: 67.0
Bore-Diam: 6+
Riser-Pipe: 2
Casing: 60
Pipe-Length: 64.25
Bottom: 0.25
screen-length: 5.0
total: 69.5
screen-slot: 0.010
seal: pellet